Real and Reactive Power Control and Primary Frequency Response. 9.5.1 Power Factor Design Criteria. Developer shall perform the EPC Services described in Appendix A hereto and as otherwise set forth by the terms of this Agreement at Developer’s sole expense up to the ASO Estimated Total Costs amount. The Developer’s and Affected System Operator’s respective responsibilities for the cost of Developer’s performance of the EPC Services above the ASO Estimated Total Costs amount shall be determined in accordance with Section 25.8.6 of Attachment S to the NYISO OATT.
Appears in 2 contracts
Sources: Standard Large Generator Interconnection Service Agreement, Engineering, Procurement, and Construction Agreement