Common use of Real Property Interests Clause in Contracts

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 5 contracts

Sources: Utility Adjustment Agreement, Utility Adjustment Agreement, Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the DeveloperDB Contractor, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s DB Contractor Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the DeveloperDB Contractor’s Project schedules. The Developer DB Contractor shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the DeveloperDB Contractor’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer DB Contractor shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 4 contracts

Sources: Utility Adjustment Agreement, Utility Adjustment Agreement, Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Developer Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 4 contracts

Sources: Utility Adjustment Agreement, Utility Adjustment Agreement, Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Developer Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable lawLaw. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable lawLaw, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of wayROW, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. If the Owners facilities are remaining within the existing property interest, a Utility Joint Use Acknowledgement will be required. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments and/or Utility Installation Requests, Form 1082 shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2. A Utility Joint Use Acknowledgment is required where an existing compensable utility property interest exists and the existing or proposed utility will remain or be adjusted within the boundaries of the existing compensable utility property interest. All other accommodations not located on existing compensable utility property interests will require a Utility Installation Requests, Form 1082.

Appears in 4 contracts

Sources: Utility Adjustment Agreement, Project Utility Adjustment Agreement, Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable lawLaw. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 4 contracts

Sources: Utility Adjustment Agreement, Project Utility Adjustment Agreement, Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the DeveloperDB Contractor, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the DeveloperDB Contractor’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the DeveloperDB Contractor’s Project schedules. The Developer DB Contractor shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the DeveloperDB Contractor’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer DB Contractor shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 4 contracts

Sources: Utility Adjustment Agreement, Utility Adjustment Agreement, Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer A New Interest shall pay its share only for a replacement in kind of an Existing Interest be substantially equivalent (e.g., in width and type)) to the Existing Interest being replaced, unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is that does not meet the Developer’s cost responsibility pursuant to requirements of the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOTthe Department, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOTthe Department's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 3 contracts

Sources: Master Utility Adjustment Agreement, Master Utility Adjustment Agreement, Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Developer Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); oror Project Utility Adjustment Agreement (Developer Managed) (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOTROW-U-80AU-JUAA-DA) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 2 contracts

Sources: Project Utility Adjustment Agreement, Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”.. Project Utility Adjustment Agreement (Owner Managed) (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOTROW-U-80AU-JUAA-DA) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Project Utility Adjustment Agreement (Owner Managed) Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 2 contracts

Sources: Project Utility Adjustment Agreement, Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s indirect costs described in Paragraph 6. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2Department. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) Acknowledgement for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the DeveloperDeveloperDB Contractor, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the DeveloperDeveloperDB Contractor’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the DeveloperDeveloperDB Contractor’s Project schedules. The Developer DeveloperDB Contractor shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the DeveloperDeveloperDB Contractor’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer DeveloperDB Contractor shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer DeveloperDB Contractor in the interest of overall Project economy. Any New Interest which is not the DeveloperDeveloperDB Contractor’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer DeveloperDB Contractor shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer DeveloperDB Contractor shall reimburse the Owner for the DeveloperDeveloperDB Contractor’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer DeveloperDB Contractor shall compensate the Owner for the DeveloperDeveloperDB Contractor’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer DeveloperDB Contractor and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer DeveloperDB Contractor or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Utility Adjustment Agreement

Real Property Interests. (a) The If the Owner clams any right, title or interest in the existing locations of Owner Utilities, the Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any the right, title or interest in the real property claimed by the Owner, including, but not limited to an Affidavit of Property Interest (“Affidavit”) on the form required by TxDOT. If the Owner with respect has not already executed and provided the Affidavit to the Developer, the Owner Utilities in their existing location(s)shall execute it contemporaneously with its execution of this Agreement and provide it to the Developer. Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Developer Utility Assembly as described in Paragraph 22(a). Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement commence and complete each New Interest acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The If the Owner acquires a New Interest, the Developer shall be responsible for its share the Developer’s Share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s costs. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share the Developer’s Share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected existing Owner Utility occupying such interest is either (i) remaining in its original location or is (ii) being reinstalled in a new location within the area subject to such Existing Interest. The Owner shall provide the Developer the executed quitclaim deed upon completion of the related Adjustment work and its acceptance by the Owner. Except as otherwise directed by the Developer, the Owner shall execute a quitclaim deed for each relinquishment of an Existing Interest in the form required by TxDOT. The Owner shall execute the quitclaim deed upon completion of the related Adjustment work and its acceptance by the Owner. In addition, at the time the Owner executes this Agreement, the Owner shall provide the Developer a letter signed by the Owner’s authorized representative confirming that the Owner will quitclaim the Existing Interest to TxDOT upon completion and acceptance of the Utility Adjustment. The letter shall include a copy of the unsigned quitclaim deed. All quitclaim deeds or other relinquishment documents (including the Owner’s letter and unsigned deed) shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share Share of the Owner’s actual and reasonable New Interest acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share Share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s)Interest. (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A“UJUA”) for each Adjustment where required pursuant to TxDOT policiesby TxDOT. The Owner shall execute it contemporaneously with its execution of this Agreement. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Developer Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility.responsibility.‌ (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOTROW-U-80AU-JUAA-DA) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOTROW-U-80AU-JUAA-DA) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”.interest (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT CTRMA indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTCTRMA’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT CTRMA as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (a “New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner Developer by further agreement, shall be responsible for undertaking such acquisition. The Owner Developer shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), ) excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s indirect costs described in Paragraph 6. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, including legally comparable rights in land, the Owner to the extent allowed by Texas law and Owner’s code of regulations agrees to execute and deliver a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOTCTRMA, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT CTRMA on account of such Existing Interest or New Interest(s)Interest. (e) The Owner shall execute a Utility Joint Use Acknowledgment Agreement (TxDOTCDA-U-80A) in the form attached as Exhibit C for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT CTRMA policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable lawLaw. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard standard: (i) is Is required in order to accommodate the Project or by compliance with applicable law, or Law; or (ii) is Is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one (1) of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments (UJUA) and/or Utility Installation Requests (UIR), Form 1082 shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2. A Utility Joint Use Acknowledgment is required where an Existing Utility Property Interest exists and the existing or proposed Utility will remain or be Adjusted within the boundaries of the Existing Utility Property Interest. All other accommodations not located on Existing Utility Property Interests will require a Utility Installation Requests, Form 1082.

Appears in 1 contract

Sources: Project Utility Adjustment Agreement

Real Property Interests. (a) The If the Owner clams any right, title or interest in the existing locations of Owner Utilities, the Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any the right, title title, or interest in the real property claimed by the Owner, including, but not limited to an Affidavit of Property Interest (“Affidavit”) on the form required by ▇▇▇▇▇. If the Owner with respect has not already executed and provided the Affidavit to the Developer, the Owner Utilities in their existing location(s)shall execute it contemporaneously with its execution of this Agreement and provide it to the Developer. Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 22(a). Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement commence and complete each New Interest acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The If the Owner acquires a New Interest, the Developer shall be responsible for its share pay the Developer’s Share (if any, as specified in Paragraph 66(a)) of the Owner’s actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e16(d); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s costs described in Paragraph 5. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected existing Owner Utility occupying such interest is either (i) remaining in its original location or is (ii) being reinstalled in a new location within the area subject to such Existing Interest. The Owner shall provide the Developer the executed quitclaim deed upon completion of the related Adjustment work and its acceptance by the Owner. Except as otherwise directed by the Developer, the Owner shall execute a quitclaim deed for each relinquishment of an Existing Interest in the form required by TxDOT. The Owner shall execute the quitclaim deed upon completion of the related Adjustment work and its acceptance by the Owner. In addition, at the time the Owner executes this Agreement, the Owner shall provide the Developer a letter signed by the Owner’s authorized representative confirming that the Owner will quitclaim the Existing Interest to TxDOT upon completion and acceptance of the Utility Adjustment. The letter shall include a copy of the unsigned quitclaim deed. All quitclaim deeds or other relinquishment documents (including the Owner’s letter and unsigned deed) shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer, the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A”UJUA”) for each Adjustment where required pursuant to TxDOT policiesby TxDOT. The Owner shall execute it contemporaneously with its execution of this Agreement. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project Facility schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s indirect costs described in Paragraph 6. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project Facility or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project Facility project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project Facility right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOTthe Department, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s indirect costs described in Paragraph 6. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2Department. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) Acknowledgement for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project Facility schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer A New Interest shall pay its share only for a replacement in kind of an Existing Interest be substantially equivalent (e.g., in width and type)) to the Existing Interest being replaced, unless a New Interest exceeding such standard (i) is required in order to accommodate the Project Facility or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project Facility project economy. Any New Interest which is that does not meet the Developer’s cost responsibility pursuant to requirements of the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project Facility right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOTthe Department, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOTthe Department's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.subparagraph

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the DeveloperDeveloperDB Contractor, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s DeveloperDB Contractor Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the DeveloperDeveloperDB Contractor’s Project schedules. The Developer DeveloperDB Contractor shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the DeveloperDeveloperDB Contractor’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer DeveloperDB Contractor shall pay its share only for a replacement in kind of an Existing Interest (e.g., in width and type), unless a New Interest exceeding such standard standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer DeveloperDB Contractor in the interest of overall Project economy. Any New Interest which is not the DeveloperDeveloperDB Contractor’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer DeveloperDB Contractor shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer DeveloperDB Contractor shall reimburse the Owner for the DeveloperDeveloperDB Contractor’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and 15(b), subject to Paragraph 16(c15(c); or or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer DeveloperDB Contractor shall compensate the Owner for the DeveloperDeveloperDB Contractor’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer DeveloperDB Contractor and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer DeveloperDB Contractor or TxDOT on account of such Existing Interest or New Interest(s). (ef) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s costs described in Paragraph 6. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation acceptable to the Department, relinquishing such Existing Interest to TxDOTthe Department, unless the affected except that no quitclaim or other relinquishment will be required for any Owner Utility is remaining in or being Adjusted within its original location or is being reinstalled in a new location within the area subject to such Existing Interestexisting property interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOTthe Department's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) Acknowledgement for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be invoiced by the Owner and paid by the Developer pursuant to this Agreement, as a segregated from other costs on component of the Owner's estimates and invoices’s indirect costs described in Paragraph 6. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer shall pay its share only for a replacement in kind of an Existing Interest (e.g., in as to width and type), unless a New Interest exceeding such standard (i) is required in order to accommodate the Project or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project economy. Any New Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation acceptable to the Department relinquishing such Existing Interest to TxDOTthe Department, unless the affected except that no quitclaim or other relinquishment will be required for any Owner Utility is remaining in or being Adjusted within its original location or is being reinstalled in a new location within the area subject to such Existing Interestexisting property interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOTthe Department's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s its actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) Acknowledgement for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOT’s approval as part of its review of the Developer’s Developer Utility Assembly as described in Paragraph 2. Claims approved by TxDOT as to rights or interests are referred to herein as “Existing Utility Property Interests”. (b) If acquisition of any new easement or other interest in real property (“New Replacement Utility Property Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 64) of the actual and reasonable acquisition costs of any such New Replacement Utility Property Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c15(c), and subject to the provisions of Paragraph 16(e15(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's ’s estimates and invoices. Any such New Replacement Utility Property Interest shall have a written valuation and shall be acquired in accordance with applicable lawLaw. (c) The Developer shall pay its share only for a replacement in kind of an Existing Utility Property Interest (e.g., in width and type), unless a New Replacement Utility Property Interest exceeding such standard standard: (i) is Is required in order to accommodate the Project or by compliance with applicable law, or Law; or (ii) is Is called for by the Developer in the interest of overall Project economy. Any New Replacement Utility Property Interest which is not the Developer’s cost responsibility pursuant to the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Utility Property Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Utility Property Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Utility Property Interest located within the final Project right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Utility Property Interest to TxDOT, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Utility Property Interest. If the Owner’s facilities are remaining within the existing property interest, a Utility Joint Use Acknowledgement will be required. All quitclaim deeds or other relinquishment documents shall be subject to TxDOT's ’s approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from the Developer or TxDOT on account of such Existing Interest or New Interest(s). (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.Paragraph

Appears in 1 contract

Sources: Project Utility Adjustment Agreement

Real Property Interests. (a) The Owner has provided, or upon execution of this Agreement shall promptly provide to the Developer, documentation acceptable to TxDOT the Department indicating any right, title or interest in real property claimed by the Owner with respect to the Owner Utilities in their existing location(s). Such claims are subject to TxDOTthe Department’s approval as part of its review of the Developer’s Utility Assembly as described in Paragraph 2. Claims approved by TxDOT the Department as to rights or interests are referred to herein as “Existing Interests”. (b) If acquisition of any new easement or other interest in real property (“New Interest”) is necessary for the Adjustment of any Owner Utilities, then the Owner shall be responsible for undertaking such acquisition. The Owner shall implement each acquisition hereunder expeditiously so that related Adjustment construction can proceed in accordance with the Developer’s Project Facility schedules. The Developer shall be responsible for its share (if any, as specified in Paragraph 6) of the actual and reasonable acquisition costs of any such New Interest (including without limitation the Owner’s reasonable overhead charges and reasonable legal costs as well as compensation paid to the landowner), excluding any costs attributable to Betterment as described in Paragraph 16(c), and subject to the provisions of Paragraph 16(e); provided, however, that all acquisition costs shall be subject to the Developer’s prior written approval. Eligible acquisition costs shall be segregated from other costs on the Owner's estimates and invoices. Any such New Interest shall have a written valuation and shall be acquired in accordance with applicable law. (c) The Developer A New Interest shall pay its share only for a replacement in kind of an Existing Interest be substantially equivalent (e.g., in width and type)) to the Existing Interest being replaced, unless a New Interest exceeding such standard (i) is required in order to accommodate the Project Facility or by compliance with applicable law, or (ii) is called for by the Developer in the interest of overall Project Facility project economy. Any New Interest which is that does not meet the Developer’s cost responsibility pursuant to requirements of the preceding sentence shall be considered a Betterment to the extent that it upgrades the Existing Interest which it replaces, or in its entirety if the related Owner Utility was not installed pursuant to an Existing Interest. Betterment costs shall be solely the Owner’s responsibility. (d) For each Existing Interest located within the final Project Facility right of way, upon completion of the related Adjustment work and its acceptance by the Owner, the Owner agrees to execute a quitclaim deed or other appropriate documentation relinquishing such Existing Interest to TxDOTthe Department, unless the affected Owner Utility is remaining in its original location or is being reinstalled in a new location within the area subject to such Existing Interest. All quitclaim deeds or other relinquishment documents shall be subject to TxDOTthe Department's approval as part of its review of the Utility Assembly as described in Paragraph 2. For each such Existing Interest relinquished by the Owner, the Developer shall do one of the following to compensate the Owner for such Existing Interest, as appropriate: (i) If the Owner acquires a New Interest for the affected Owner Utility, the Developer shall reimburse the Owner for the Developer’s share of the Owner’s actual and reasonable acquisition costs in accordance with Paragraph 16(b) and subject to Paragraph 16(c); or (ii) If the Owner does not acquire a New Interest for the affected Owner Utility, the Developer shall compensate the Owner for the Developer’s share of the fair market value of such relinquished Existing Interest, as mutually agreed between the Owner and the Developer and supported by a written valuation. The compensation, if any, compensation provided to the Owner pursuant to either subparagraph (i) or subparagraph (ii) above shall constitute complete compensation to the Owner for the relinquished Existing Interest and any New Interest, and no further compensation shall be due to the Owner from either the Developer or TxDOT the Department on account of such Existing Interest or New Interest(s)Interest. (e) The Owner shall execute a Utility Joint Use Acknowledgment (TxDOT-U-80A) for each Adjustment Adjusted Owner Utility where required pursuant to TxDOT policies. All Utility Joint Use Acknowledgments shall be subject to TxDOT approval as part of its review of the Utility Assembly as described in Paragraph 2.

Appears in 1 contract

Sources: Master Utility Adjustment Agreement