RECORD OF WORK DONE. The Contractor shall maintain an accurate record of the work orders and work performed during the term of the contract. If the work includes any changes or corrections from the documents provided by the Engineer, the Contractor shall create and maintain revised record drawings reflecting such changes or corrections. Record drawings shall preferably be the same size as the Contract Drawings. The Contractor’s attention is particularly directed to the necessity of keeping accurate records of all subsurface and concealed work so that the record drawings may contain this information in exact detail and location.
Appears in 2 contracts
Sources: Furnish and Install Agreement, Furnish and Install Agreement
RECORD OF WORK DONE. The Contractor shall maintain an accurate record of the work orders and work actually performed during the term of the contractContract. If the work includes any changes or corrections from the documents provided by the Engineer, Engineer then the Contractor shall create and maintain revised record drawings Record Drawings reflecting such changes or corrections. Record drawings shall preferably be the same size as the Contract Drawings. The Engineer at his/her discretion may accept tabulations showing the location and type of mountings of each sign. The Contractor’s attention is particularly directed to the necessity of keeping accurate records of all subsurface and concealed work so that the record drawings may contain this information in exact detail and location.
Appears in 1 contract
Sources: Furnish and Install Agreement