Record Set. Design-Build Firm shall maintain in a safe place at the Project(s) site(s) a copy of the Contract ,one record copy and one permit set of the Contract documents, including, but not limited to, all Drawings, Specifications, accepted shop drawings, amendments, Change Orders, RFIs, and Field Directives, field and performance test records, construction progress schedules, as well as all written interpretations and clarifications issued by the Project Manager or Consultant, in good order and annotated to show all changes made during construction. The record documents shall be continuously updated by Design-Build Firm throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Construction Change Directives, and Field Directives as well as all written interpretations and clarifications, and all concealed and buried installations of piping, conduit and utility services. Design-Build Firm shall certify the accuracy of the updated record documents. As a condition precedent to City’s obligation to pay Design-Build Firm, the Design-Build Firm shall provide evidence, satisfactory to the Project Manager that Design-Build Firm is fulfilling its obligation to continuously update the record documents. All buried items, outside the Project(s) site(s), shall be accurately located on the record documents as to depth and in relationship to not less than two (2) permanent features (e.g. interior or exterior wall faces). The record documents shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in red. The record documents shall be available to the City for reference. Upon completion of the Work and as a condition precedent to Design-Build Firm’s entitlement to final payment, the record documents shall be delivered to the Project Manager by the Design-Build Firm. The Record Set of Drawing shall be submitted in both hard copy and as electronic plot and .dwg files.
Appears in 2 contracts
Sources: Design Build Contract, Design Build Contract
Record Set. Design-Build Firm shall maintain in a safe place at the Project(s) site(s) a copy of the Contract ,one record copy and one permit set of the Contract documents, including, but not limited to, all Drawings, Specifications, accepted shop drawings, amendments, Change Orders, RFIs, and Field Directives, field and performance test records, construction progress schedules, as well as all written interpretations and clarifications issued by the Project Manager or Consultant, in good order and annotated to show all changes made during construction. The record documents shall be continuously updated by Design-Build Firm throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Construction Change Directives, and Field Directives as well as all written interpretations and clarifications, and all concealed and buried installations of piping, conduit and utility services. Design-Build Firm shall certify the accuracy of the updated record documents. As a condition precedent to City’s City‟s obligation to pay Design-Build Firm, the Design-Build Firm shall provide evidence, satisfactory to the Project Manager that Design-Build Firm is fulfilling its obligation to continuously update the record documents. All buried items, outside the Project(s) site(s), shall be accurately located on the record documents as to depth and in relationship to not less than two (2) permanent features (e.g. interior or exterior wall faces). The record documents shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in red. The record documents shall be available to the City for reference. Upon completion of the Work and as a condition precedent to Design-Build Firm’s Firm‟s entitlement to final payment, the record documents shall be delivered to the Project Manager by the Design-Build Firm. The Record Set of Drawing shall be submitted in both hard copy and as electronic plot and .dwg files.
Appears in 2 contracts
Sources: Design Build Services Agreement, Design Build Services Agreement
Record Set. Design-Build Firm Contractor shall maintain in a safe place at the Project(s) site(s) a copy of the Contract ,one record copy and one permit set of the Contract documents, including, but not limited to, all Drawings, Specifications, accepted shop drawings, amendments, Change Orders, RFIs, and Field Directives, field and performance test records, construction progress schedules, as well as all written interpretations and clarifications issued by the Project Manager or Consultant, in good order and annotated to show all changes made during construction. The record documents shall be continuously updated by Design-Build Firm Contractor throughout the prosecution of the Work to accurately reflect all field changes that are made to adapt the Work to field conditions, changes resulting from Change Orders, Construction Change Directives, and Field Directives as well as all written interpretations and clarifications, and all concealed and buried installations of piping, conduit and utility services. Design-Build Firm Contractor shall certify the accuracy of the updated record documents. As a condition precedent to City’s obligation to pay Design-Build FirmContractor, the Design-Build Firm Contractor shall provide evidence, satisfactory to the Project Manager that Design-Build Firm Contractor is fulfilling its obligation to continuously update the record documents. All buried items, outside the Project(s) site(s), shall be accurately located on the record documents as to depth and in relationship to not less than two (2) permanent features (e.g. interior or exterior wall faces). The record documents shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in red. The record documents shall be available to the City for reference. Upon completion of the Work and as a condition precedent to Design-Build FirmContractor’s entitlement to final payment, the record documents shall be delivered to the Project Manager by the Design-Build FirmContractor. The Record Set of Drawing shall be submitted in both hard copy and as electronic plot and .dwg files.
Appears in 1 contract
Sources: Design and Construction Agreement
Record Set. Design-Build Firm Contractor shall maintain in a safe place at the Project(s) site(s) a copy of the Contract ,Project site one record copy and one permit set of the Contract documentsDocuments, including, but not limited to, all Drawings, Specifications, accepted shop drawings, amendments, Change Orders, RFIs, and Field Directives, field and performance test records, construction progress schedules, as well as all written interpretations and clarifications issued by the City’s Project Manager or ConsultantManager, in good order and annotated to show all changes made during construction. The record documents Contract Documents shall be continuously updated by Design-Build Firm Contractor throughout the prosecution of the Construction Work to accurately reflect all field changes that are made to adapt the Construction Work to field conditions, changes resulting from Change Orders, Construction Change Directives, and Field Directives as well as all written interpretations and clarifications, and all concealed and buried installations of piping, conduit and utility services. Design-Build Firm Contractor shall certify the accuracy of the updated record documentsContract Documents. As a condition precedent to City’s obligation to pay Design-Build FirmContractor, the Design-Build Firm Contractor shall provide evidence, satisfactory to the City’s Project Manager Manager, that Design-Build Firm Contractor is fulfilling its obligation to continuously update the record documentsContract Documents. All buried items, outside the Project(s) site(s)Project site, shall be accurately located on the record documents Contract Documents as to depth and in relationship to not less than two (2) permanent features (e.g. interior or exterior wall faces). The record documents Contract Documents shall be clean and all changes, corrections and dimensions shall be given in a neat and legible manner in red. The record documents Contract Documents shall be available to the City and the Consultant for reference. Upon completion of the Construction Work and as a condition precedent to Design-Build FirmContractor’s entitlement to final payment, the record documents Contract Documents shall be delivered by the Contractor to the City’s Project Manager by the Design-Build FirmManager. The Record Set of Drawing shall be submitted in both hard copy and as electronic plot and .dwg files.
Appears in 1 contract