Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis. b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period. c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT. d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 16 contracts
Sources: Contract for Engineering Services, Contract for Surveying Services, Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider The Contractor shall submit Monthly Progress Assessment Reports (Exhibit H-3)monthly reports, after contract work begins, on DBE involvement payments to meet the DBE goal and for DBE or HUB race-neutral participation. One copy of each Report payments made to non-DBE HUBs. The monthly report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to Area Engineer. These reports will be submitted with due within 15 days after the Provider’s invoice. Only actual payments made to subproviders are to be reportedend of a calendar month. These reports will be required until all subprovider DBE subcontracting or material supply activity is completed. Form No. SMS.4903, “DBE or HUB Progress Report,” is to be used for monthly reporting. Form No. SMS.4904, “DBE or HUB Final Report,” is to be used as a final summary of DBE payments submitted upon completion of the project. The original final report must be submitted to the Business Opportunity Programs Office and a copy must be submitted to the Area Engineer. These forms may be obtained from the Department or may be reproduced by the Contractor. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled cancelled checks paid to DBEs on a random basis. Cancelled checks and invoices should reference the Department’s project number.
b. DBE subproviders subcontractors and/or material suppliers should be identified on the monthly report by Vendor Number, name, type of work being performed, and the amount of actual payment made to each during the billing monthly period, cumulative payment amount and percentage of the total contract amount. These Negative reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing monthly period.
c. All such records must be retained for a period of seven (7) 3 years following final payment or until any investigation, audit, examination, or other review undertaken during completion of the seven (7) years is completedcontract work, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT. Provide copies of subcontracts or agreements and other documentation upon request.
d. Prior to receiving final payment, the Provider Contractor shall submit a Form SMS.4904, “DBE or HUB Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoiceReport”. If the DBE goal requirement is not met, documentation supporting Good Faith Efforts, as outlined in Section A.3.c. of the good faith efforts made to meet the goal this Special Provision, must be submitted with the “DBE or HUB Final Report.”
e. Provide a certification of prompt payment, the Prompt Payment Certification Form 2177, to certify that all subcontractors and suppliers were paid from the previous months payments and retainage was released for those whose work is complete. Submit the completed form each month and the month following the month when final acceptance occurred at the end of the project.
Appears in 4 contracts
Sources: Design Build Agreement, Design Build Agreement, Design Build Agreement
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 2 contracts
Sources: Contract for Engineering Services, Contract for Engineering Services
Records and Reports. a. After submission (a) The CONSULTANT will keep such records as are necessary to determine compliance with the CONSULTANT's equal employment opportunity obligations. The records kept by the CONSULTANT will be designed to indicate:
(1) The number of minority and non- minority group members and women employed in each work classification on the project, where required by the NYS D.O.T Compliance Officer.
(2) The progress and efforts being made in cooperation with unions to increase employment opportunities for minorities and women (applicable only to CONSULTANTS who rely in whole or in part on unions as a source of their work force).
(3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minority and female employees.
(4) The progress and efforts being made in securing the services of minority group subcontractors or subcontractors with meaningful minority and female representation among their employees.
(5) Compliance with all other requirements in these provisions such as meetings, instructions, employment efforts, etc.
(b) The CONSULTANT will comply with Sections 291-299 of the initial commitment reported (Exhibit H-1), Executive Law and Civil Rights Law and will provide all information and reports required by Section 2.c. the Regulations, or orders and instructions issued pursuant thereto, and will permit access to its books, records, accounts other sources of this attachmentinformation, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is its facilities as may be determined by State or Federal officials to be sent pertinent to the Department’s Business Opportunity Programs Office monthlyascertain compliance with such Regulations, in addition one copy is to be submitted with the Provider’s invoiceorders and instructions. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) three years following final payment or until any investigation, audit, examination, or other review undertaken during completion of the seven (7) years is completed, contract work and shall be available at reasonable times and places for inspection by authorized representatives of the Department or State and the DOTFederal Highway Administration.
d. Prior (c) The CONSULTANT will submit to receiving final paymentthe New York State Department of Transportation, a monthly report for the Provider shall submit a Final Report (Exhibit H-4)first three months after beginning work, detailing thereafter upon request, and each month of July following the DBE paymentsinitial submission for the duration of the project indicating the number of minority, women and non-minority group employees currently engaged in each work classification required by the contract work. The Final Report This information is to be sent reported on Form PR-1391, Federal-Aid Highway Construction Contractor's Monthly EEO Report. If on-the-job training is being required by "Training Special Provision", the CONSULTANT will be required to furnish Form FHWA-1409, Federal-Aid Highway Construction Contractor's Semi-Annual Training Report.
(d) The CONSULTANT will comply with Federal Regulations Sections 49CFR 26.29 and 26.37 by providing a report of all payments made to subconsultants and subcontractors with each request for payment submitted to the Department’s Business Opportunity Programs Office New York State Department of Transportation. The Consultant Payment History Form AAP-7 shall be submitted with each request for payment consistent with Consultant Instruction 01-01 or any subsequent revision of that Consultant Instruction.
(e) Failure to comply with these Special EEO Provisions may be considered unsatisfactory performance and onemay subject the agreement to termination under the termination article of this agreement. Non-compliance may result in the CONSULTANT's being declared ineligible for future agreements made by or on behalf of the STATE or a public authority or agency of the STATE, until he satisfies the State Commissioner of Human Rights that he has established and is carrying out a program in conformity with the provisions of these non- discrimination clauses. Such finding shall be made by the State Commissioner of Human Rights after conciliation efforts by the State Division of Human Rights have failed to achieve compliance with these non-discrimination clauses and after a verified complaint has been filed with the State Division of Human Rights, notice thereof has been given to the CONSULTANT and an opportunity has been afforded them to be heard publicly before the State Commissioner of Human Rights or official designee. Such sanctions may be imposed and remedies invoked independently of or in addition to sanctions and remedies otherwise provided for by law. These may include, but are not limited to:
(1) copy withholding of payments to be submitted with the Provider’s final invoice. If CONSULTANT under the DBE goal requirement is not metagreement until the CONSULTANT complies, documentation and/or
(2) cancellation, termination or suspensions of the good faith efforts made to meet the goal must be submitted with the Final Reportagreement in whole or in part.
Appears in 1 contract
Sources: Consulting Agreement
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 6A1A9043-D8C1-41D0-AB13-33EB431A246B verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 7C32DB83-85AE-48EE-A908-464642C11C85 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: BB486DEE-180A-4C7A-86D9-81AA36566816 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: 517DD8EC-82B3-4B01-B9ED-9BE0F8A2F1DA total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly, ; in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: EA053E5F-93DA-4B62-848B-E41A38CD571F total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Professional Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 5DA79434-ECA9-4023-A545-0DE02F520026 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 3A04EEDE-3054-4F40-8564-D51EF478BFB7 DocuSign Envelope ID: B1672469-35E9-4BB1-9C3A-767FCDA38E1E verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: 90904BDD-89A4-444C-95B3-9A27EBA1981B total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly, ; in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.. SAMPLE
Appears in 1 contract
Sources: Right of Way Professional Real Estate Appraisal Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: A2C96816-AFCF-4B6A-9B51-D8FCE6C6223E DocuSign Envelope ID: 81600B2C-53E9-4E39-BA73-002AB2A7A001 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.cSection2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentCity’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department City may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on o the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven four (74) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven four (74) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department City or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentCity’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Consultant Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly, ; in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: F0C2AD30-8EF7-490B-86E4-4CBCB522D8F8 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Professional Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period. Contract No.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.. DocuSign Envelope ID: DFD2CB09-ACAD-43E1-AA0B-1B396F9006CC
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 24292446-0E92-4C10-8E8E-E5080E44C5AC verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall must submit Monthly Progress Assessment Reports (Exhibit H-3), after contract Contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly; in addition, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract Contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall must be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall must submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: 00CA46DD-497F-40DD-AB34-BE174E51EAD0 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.. DocuSign Envelope ID: 55FE2BFC-CA39-480D-97BD-9DF0F5D6F18E
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: E72D88A3-1FD8-4CA6-9F94-B5B0362A640F total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 3821E038-49E4-416B-AD40-59739FF7B5D9 DocuSign Envelope ID: 7C0DB6A1-8255-47A6-9739-E507A96B9112 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: B6695AF6-F628-4ABD-BC02-4DF780668CEB verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 5914A726-E858-48F5-B640-4A48F639EFB9 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly, ; in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: C97A4B85-4FCC-46EC-BA32-C8187C67D4E3 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Professional Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven four (74) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven four (74) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: F977C999-9391-4B1E-8882-3E74EBE07795 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: E287E48D-8F33-4054-912A-C044092E62B0 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 72A77E6D-1011-4A73-AFB3-C43B2D5483E3 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 9975A59F-23ED-44FD-9FBF-31C397459A65 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: 41E4A752-772F-4379-A290-87107DAE5C0E total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly, ; in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: CE1F86E9-F0AF-45B3-A7BF-14A0573CEE44 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Professional Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 512896B8-C76F-47E4-9899-C3CA16490345 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: 8B47F4E0-92EC-4E2B-A7F3-2A6F4173893E verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: D5C0651A-0082-446C-94D2-2FED883BC58A total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: C175D39D-61A4-48B5-B25F-2019AF797545 verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: F09708A9-72F3-4154-AEDE-751E59B5E1DF verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the DepartmentState’s Business Opportunity Programs Office monthly, ; in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department State may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: 8CF9DA67-52B4-4244-BFA3-CF3F02CA6521 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department State or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the DepartmentState’s Business Opportunity Programs Office and one
one (1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Professional Services Contract
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may DocuSign Envelope ID: F5521467-ECBA-4D51-AE58-E0461126F7CF verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the DocuSign Envelope ID: E3CAF342-1404-4A6C-B0C0-996184AD9D50 total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.
Appears in 1 contract
Sources: Contract for Engineering Services
Records and Reports. a. After submission of the initial commitment reported (Exhibit H-1), required by Section 2.c. of this attachment, the Provider shall submit Monthly Progress Assessment Reports (Exhibit H-3), after contract work begins, on DBE involvement to meet the goal and for race-neutral participation. One copy of each report is to be sent to the Department’s Business Opportunity Programs Office monthly, in addition one copy is to be submitted with the Provider’s invoice. Only actual payments made to subproviders are to be reported. These reports will be required until all subprovider activity is completed. The Department may verify the amounts being reported as paid to DBEs by requesting copies of canceled checks paid to DBEs on a random basis.. DocuSign Envelope ID: 622D29DC-2629-428F-BD3B-9B623E84221C
b. DBE subproviders should be identified on the report by name, type of work being performed, the amount of actual payment made to each during the billing period, cumulative payment amount and percentage of the total contract amount. These reports will be due within fifteen (15) days after the end of a calendar month. Reports are required even when no DBE activity has occurred in a billing period.
c. All such records must be retained for a period of seven (7) years following final payment or until any investigation, audit, examination, or other review undertaken during the seven (7) years is completed, and shall be available at reasonable times and places for inspection by authorized representatives of the Department or the DOT.
d. Prior to receiving final payment, the Provider shall submit a Final Report (Exhibit H-4), detailing the DBE payments. The Final Report is to be sent to the Department’s Business Opportunity Programs Office and one
(1) copy to be submitted with the Provider’s final invoice. If the DBE goal requirement is not met, documentation of the good faith efforts made to meet the goal must be submitted with the Final Report.