Records of Inspections. The Project Inspector must maintain detailed records of all Inspection Requests. The inspector’s records must provide a comprehensive and timely documentation of the inspected work, promptly identifying all compliant and non-compliant construction. These records must be readily accessible and maintained in an organized manner. The following is a list of the Inspection records that must be maintained at the job site: A systematic record of those materials and assemblies delivered to the Project site that according to the Project Inspection Plan require an inspection before being incorporated into the work, e.g. switch gears, chillers, boilers, air handling units and other high value components with long lead times for replacement. A systematic record of the Inspection of all work required by code and the construction documents. This may be provided through the Inspection Request process or the Project Inspector's process management system. The inspector must also record the resolution of reported deviations through the Inspection Request process. Special Inspection Records per Title 24, Part 2, Volume 2, such as concrete placement operations, welding operations, pile penetration blow counts, and other records as specified on the approved construction documents. Copy of the Daily Report that includes Project Inspector’s and assistant Project Inspector(s)’s time spent at the Project site, or with the prior approval of the Manager of Quality Compliance at an offsite project location where Inspection is required. The time should be reported on the Daily Report and the Monthly Document Log.
Appears in 3 contracts
Sources: Consulting Agreement, Standard Agreement, Standard Agreement