Common use of Reduction Amount Clause in Contracts

Reduction Amount. (1) If in any period (see 48 CFR 952.223-77)(b)(2)) it is found that the contractor has failed to comply with contract terms and conditions relating to the protection of worker safety and health, the contractor’s fee or profit of the period may be reduced. Such reduction shall not be less than 26% nor greater than 100% of the total fee or profit earned for a first degree performance failure, not less than 11% nor greater than 25% for a second degree performance failure, and up to 10% for a third degree performance failure. The contracting officer must consider mitigating factors that may warrant a reduction below the specified range (see 48 CFR 923.7001(b)). The mitigating factors include, but are not limited to, the following: (i) Degree of control the contractor had over the event or incident. (ii) Efforts the contractor had made to anticipate and mitigate the possibility of the event in advance. (iii) Contractor self-identification and response to the event to mitigate impacts and recurrence. (iv) General status (trend and absolute performance) of protecting WS&H and compliance in related areas. (v) Contractor demonstration to the Contracting Officer’s satisfaction that the principles of industrial WS&H standards are routinely practiced (e.g., Voluntary Protection Program Star Status). (vi) Event caused by "Good Samaritan" act by the contractor (e.g., offsite emergency response). (vii) Contractor demonstration that a performance measurement system is routinely used to improve and maintain WS&H performance (including effective resource allocation) and to support DOE corporate decision-making (e.g., policy, WS&H programs). (viii) Contractor demonstration that an Operating Experience and Feedback Program is functioning that demonstrably affects continuous improvement in WS&H by use of lessons-learned and best practices inter- and intra-DOE sites. (i) Except in the case of performance based firm-fixed-price contracts (see paragraph (b)(3) below), the contracting officer, for purposes of this clause, will at the time of contract award, or as soon as practicable thereafter, allocate the total amount of fee or profit that is available under this contract to equal periods of [insert 6 or 12] months to run sequentially for the entire term of the contract (i.e., from the effective date of the contract to the expiration date of the contract, including all options). The amount of fee or profit to be allocated to each period shall be equal to the average monthly fee or profit that is available or otherwise payable during the entire term of the contract, multiplied by the number of months established above for each period. (ii) Under this clause, the total amount of fee or profit that is subject to reduction in a period in which a performance failure occurs, in combination with any reduction made under any other clause in the contract that provides for a reduction to the fee or profit, shall not exceed the amount of fee or profit that is earned by the contractor in the period established pursuant to paragraph (b)(2)(i) of this clause. (3) For performance-based firm-fixed-price contracts, the contracting officer will at the time of contract award include negative monetary incentives in the contract for contractor violations relating to the protection of worker safety and health.

Appears in 3 contracts

Sources: Cost Plus Award Fee Contract, Cost Plus Award Fee Contract, Cost Plus Award Fee Contract