REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK Clause Samples

POPULAR SAMPLE Copied 1 times
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. All work which has been rejected or condemned shall be repaired, or if it cannot be repaired satisfactorily, it shall be removed and replaced at the CONTRACTOR’S expense. Defective materials shall be immediately removed from the site of the work. Work done without line and grade having been given, work done beyond the lines or not in conformity with the grades shown on the plans or as given, save as herein provided, work done without written authority and prior agreement in writing as to process, shall be done at the CONTRACTOR’S risk and shall be considered unauthorized and at the option of the OWNER may be ordered removed at the CONTRACTOR’S expense. Upon failure of the CONTRACTOR to repair satisfactorily or to remove and replace, if so directed, rejected, unauthorized or condemned work or materials immediately after receiving notice form the OWNER, the OWNER shall, after giving written notice to the CONTRACTOR, have the authority to cause defective work to be remedied or removed and replaced, or to cause unauthorized work to be removed and to deduct the cost thereof from any monies due or to become due the CONTRACTOR. Alternatively, the OWNER may, at its option, declare the CONTRACTOR in default.
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. (a) Rejected Work shall be removed and replaced by Contractor in an acceptable manner and no compensation will be allowed for such removal or replacement. Work done beyond the lines and grades shown on the plans or established by the City Representative, or Work done without written authority will be considered as unauthorized and not be paid for. Such Work may be ordered removed at Contractor’s expense. (b) Upon failure on the part of Contractor to comply promptly with an order of the City Representative under this section, the City Representative shall have authority to cause defective Work to be removed and replaced, and unauthorized Work to be removed, and to deduct the costs from monies due Contractor.
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. The Contracting Agency will not pay for unauthorized or defective Work. Unauthorized or defective Work includes: Work and materials that do not conform to Contract requirements; Work done beyond the lines and grades set by the Plans or the Engineer; and extra Work and materials furnished without the Engineer’s written approval. At the Engineer’s order, the Contractor shall immediately remedy, remove, replace, or dispose of unauthorized or defective Work or materials and bear all costs of doing so.
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. 2.11.1. All Work which has been rejected or condemned by Owner or Project Manager shall be repaired, or if it cannot be satisfactorily repaired, be removed and replaced at the Contractor's expense. The following work will be done at the Contractor’s risk and will be considered “unauthorized.” At the Project Manager’s discretion the “Unauthorized Work” may not be measured and paid for and may need to be removed at the Contractor’s sole expense. i. Work done beyond the lines and grades shown on the Plans, or as given, except as herein provided; ii. Work done without giving timely notice to the Project Manager so the Project Manager may, if he wishes, be present to observe the Work in progress; or iii. Any Extra or unclassified Work done without written authority and prior Agreement in writing as to prices. 2.11.2. Upon the failure of the Contractor to satisfactorily repair or to remove and replace, if so directed, rejected, unauthorized, or condemned Work immediately after receiving formal notice from the Project Manager, the Owner may, at its sole option, recover for such defective Work on the Contractor's bond or by action in a court having proper jurisdiction over such matters, or may employ labor and equipment and satisfactorily repair or remove and replace such Work and charge the cost of the same to the Contractor, which cost will be deducted from any money due him.
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. (October 1, 2005 APWA GSP)
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. (February 22, 2011 KC GSP) The following is added at the end of this section:
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. All work, which has been rejected, shall be remedied, or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such removal or replacement. Any work done beyond the lines and grades shown on the plans or established by the Engineer, or any extra work done without written authority will be considered as unauthorized and will not be paid for. Work so done may be ordered removed at the Contractor's expense. Upon failure on the part of the Contractor to comply forthwith with any order of the Engineer made under the provisions of this article, the Engineer shall have authority to cause defective work to be removed, and to deduct the costs from any monies due or to become due the Contractor
REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. The Engineer shall have the right to suspend work upon discovery that any part or parts is being done not in accordance with specifications and he shall not order work resumed until materials furnished or methods used or both, as the case may be, corrected to meet plans, specifications and interpretations of same by the Engineer.

Related to REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK

  • Removal of Materials If you decide you would like to remove your Materials from the Service, you may provide written notice to Prime Publishing by either deleting the image through the Prime Publishing interface or by contacting Prime Publishing customer service, and Prime Publishing will remove such Materials from the Service within a reasonable period of time. 5) License for Name, Trademarks and Likenesses. You hereby grant to Prime Publishing, its Affiliates and sublicensees a nonexclusive, worldwide, royalty-free license to use all trademarks, trade names, and the names and likenesses of any individuals that appear in the Materials. You grant Prime Publishing, its Affiliates and sublicensees the right to use the name that you submit in connection with the Materials. 6) Specifications and Guidelines. You agree to submit Materials to us in accordance with all guidelines for use of the Service posted on the Prime Publishing web site or of which you are otherwise notified ("Guidelines"), as these Guidelines may be changed in the future. 7)

  • Removal of Improvements All alterations, additions and other improvements by Tenant shall become the property of Landlord and shall not be removed from the Project, unless request is made by Landlord to Tenant to remove those alterations, additions and other improvements which were made without Landlord's approval where such approval was required under this Lease. All (i) moveable trade fixtures and signs installed in the Project by Tenant and paid for by Tenant, other than those items comprising FF&E or Operating Equipment which are replacements, substitutions or additions thereof or thereto made by Tenant and FF&E and Operating Equipment present in the Project as of the date hereof, and (ii) signs, logos and other property, including Operating Equipment and Supplies, bearing the logo of any Franchisor which is not continuing as the Franchisor following the expiration of the Term of this Lease shall remain the property of Tenant or Franchisor, as the case may be, and may be removed upon the expiration of the Lease Term; provided that any of such items as are affixed to the Project and require severance may be removed only if Tenant repairs any damage caused by such removal and that Tenant shall have fully performed all of the terms, conditions and covenants to be performed by Tenant under this Lease. If Tenant fails to remove such items from the Project by the expiration of the Lease Term or earlier termination of this Lease, all such trade fixtures, furniture, furnishings and signs shall become the property of Landlord, unless Landlord elects to require their removal, in which case Tenant shall, at its sole cost and expense, promptly remove the same and restore the Project to its condition on the date of this Lease. The covenants contained in this Section shall survive the expiration or earlier termination of this Lease.

  • Correction of Defects 35.1 The Engineer shall give notice to the Contractor of any Defects before the end of the Defects Liability Period, which begins at Completion and is defined in the Contract Data. The Defects Liability Period shall be extended for as long as Defects remain to be corrected. 35.2 Every time notice of a Defect is given, the Contractor shall correct the notified Defect within the length of time specified by the Engineer’s notice.

  • ACCEPTANCE OF DEFECTIVE OR NON-CONFORMING WORK 13.3.1 The State may accept defective or nonconforming Work pursuant to Paragraph 13.2.1