Requests for Quotes. The process for JBEs to request quotes shall be as follows: (i) Contact both vendors and provide a scope of requirements that includes, at a minimum: a. The JBE’s Specific Requirements regarding spacing, dimension limitations and tunnel size. b. Delivery location(s), including special instructions such as internal deliveries or availability of loading docks. ▇. ▇▇▇▇(s) the system(s) are needed to be installed, tested, and ready for use. d. Process for delivery (building entry and security requirements, etc.) e. Other requested services, such as removal and disposal of old systems, and additional warranty services. f. Other requested goods, such as Plexiglas entry/exit ▇▇▇▇▇▇▇, and movable pedestal stands. (ii) Vendors shall provide a quote based on the scope of requirements within a specific time period as set by the JBE. Contractor’s quote must reference this Agreement, Leveraged Procurement Agreement LPA-84377, and Contractor’s quoted pricing cannot exceed the pricing specified in Exhibit E of this Agreement. (iii) The JBE must select the vendor who provides the lowest overall quote for the deliverables that meet the JBE’s s cope of requirements and the terms and conditions of this Agreement.
Appears in 1 contract
Sources: Master Agreement
Requests for Quotes. The process for JBEs to request quotes shall be as follows:
(i) Contact both vendors and provide a scope of requirements that includes, at a minimum:
a. The JBE’s Specific Requirements regarding spacing, dimension limitations and tunnel size.
b. Delivery location(s), including special instructions such as internal deliveries or availability of loading docks.
▇. ▇▇▇▇(s) the system(s) are needed to be installed, tested, and ready for use.
d. Process for delivery (building entry and security requirements, etc.)
e. Other requested services, such as removal and disposal of old systems, and additional warranty services.
f. Other requested goods, such as Plexiglas plexiglas entry/exit ▇▇▇▇▇▇▇, and movable pedestal stands.
(ii) Vendors shall provide a quote based on the scope of requirements within a specific time period as set by the JBE. Contractor’s quote must reference this Agreement, Leveraged Procurement Agreement LPA-84377LPA-84372, and Contractor’s quoted pricing cannot exceed the pricing specified in Exhibit E of this Agreement.
(iii) The JBE must select the vendor who provides the lowest overall quote for the deliverables that meet the JBE’s s cope scope of requirements and the terms and conditions of this Agreement.
Appears in 1 contract
Sources: Master Agreement
Requests for Quotes. The process for JBEs to request quotes shall be as follows:
(i) Contact both vendors and provide a scope of requirements that includes, at a minimum:
a. The JBE’s Specific Requirements specific requirements regarding spacing, dimension limitations and tunnel size.
b. Delivery location(s), including special instructions such as internal deliveries or availability of loading docks.,
▇. ▇▇▇▇(s) the system(s) are needed to be installed, tested, and ready for use.
d. Process for delivery (building entry and security requirements, etc.)
e. Other requested services, such as removal and disposal of old systems, and additional warranty services.
f. Other requested goods, such as Plexiglas entry/exit ▇▇▇▇▇▇▇, and movable pedestal stands.
(ii) Vendors shall Request that the vendors provide a quote based on the scope of requirements within a specific time period as set by the JBE. Contractor’s quote must reference this Agreement, Leveraged Procurement Agreement LPA-84377, LPA-84372 and Contractor’s the quoted pricing cannot exceed the pricing specified in Exhibit E of this Agreementthe LPA.
(iii) The JBE must select the vendor who provides the lowest overall quote for the deliverables that meet the JBE’s s cope of requirements and the terms and conditions of this Agreementthe LPA.
Appears in 1 contract
Sources: Leveraged Procurement Agreement