Requirements for the programme. The Contractor shall submit the programme not later than two weeks after the contract award. Designs should be submitted with the BOQ not later than two weeks after the contract award The Contractor shall submit his program in terms of the contract. This program shall contain the activities on the Activity Schedule with scheduled start and completion dates, the critical path: Every activity on the programme must clearly be linked to labour resources and equipment required to perform the specific activity. Completion and hand-over dates for formal inspection by the Supervisor must be indicated. The Contract Program must be displayed in the Contractors Site Offices and must be updated weekly. In addition to the maintaining of this programme, the Contractor will report on progress to the Project Manager on a weekly basis. The following Statutory non-working days are included within the contract period: • All Public Holidays for the duration of the contract. • The programme must clearly indicate the working days for the entire construction period or alternatively all the non-working days within the construction period. The Contractor may also not work on Saturdays and Sundays unless an arrangement has been made with the C4: Site Information C4.1: Information about the site at time of tender which may affect the work in this contract 1. Access limitations 2. Details of existing services/buildings which the Contractor is required to work on There are existing services within the vicinity is a municipal line and it is the Contractor’s responsibility to familiarise himself with the waterline route and other services available. Survey information are on Annexure F.
Appears in 2 contracts
Sources: Nec3 Engineering and Construction Short Contract (Ecsc3), Nec3 Engineering and Construction Short Contract (Ecsc3)