Requirements Specification. Sub-appendices The Tenderer should provide: • The draft Technical Design in sub-appendix 4.S, “Technical Design” • The draft Total design verification plan in sub-appendix 4.T, “Total design verification plan” Requirement R-14 Test and Commissioning Plan.
Appears in 2 contracts
Sources: Contract on Subsidy for Carbon Capture, Transport, and Storage, Contract on Subsidy for Carbon Capture, Transport, and Storage