Common use of Response to Notices Clause in Contracts

Response to Notices. A proposal for a Platform and/or Processing Facilities shall include an AFE, containing a description of the Platform and/or Processing Facilities, including, but not limited to, location, and the estimated costs of design, fabrication, transportation, and installation. A proposal for a well operation shall include an AFE, describing the estimated commencement date, the proposed depth, the objective formation or formations to be penetrated or tested, the Objective Horizon, the surface and bottomhole locations, proposed directional drilling operations, the type of equipment to be used, and the estimated costs of the operation, including, but not limited to, the estimated costs of drilling, testing, and Completing or abandoning the well. If a proposed operation is subject to Article 13.11 (Lease Maintenance Operations), the notice shall specify that the proposal is a Lease Maintenance Operation. A proposal for multiple operations on more than one well location by the same rig shall contain separate AFEs or notices for each operation and shall specify in writing which operation will take precedence. Each Party shall respond to each proposed multiple operation in the manner provided in Article 9.3.3 (

Appears in 1 contract

Sources: Offshore Operating Agreement (Ridgewood Energy P Fund LLC)

Response to Notices. A proposal for a Platform and/or Processing Development Facilities shall include an AFE, containing a description of the Platform and/or Processing Development Facilities, including, but not limited to, location, and the estimated costs of design, fabrication, transportation, and installation. A proposal for a well operation shall include an AFE, describing the estimated commencement date, the proposed depth, the objective formation or formations to be penetrated or tested, the Objective Horizon, the surface and bottomhole locations, proposed directional or horizontal drilling operations, the type of equipment to be used, and the estimated costs of the operation, including, but not limited to, the estimated costs of drilling, testing, and Completing or abandoning the well. If a proposed operation is subject to Article 13.11 (Lease Maintenance Operations), the notice shall specify that the proposal is a Lease Maintenance Operation. A proposal for multiple operations on more than one well location by the same rig shall contain separate AFEs or notices for each operation and shall specify in writing which operation in what order the operations will take precedencebe conducted. Each Party shall respond to each proposed multiple operation in the manner provided in Article 9.3.3 (9.3.3

Appears in 1 contract

Sources: Offshore Operating Agreement (Ridgewood Energy Q Fund LLC)