Restoration of Improvements. Culverts, driveways, roadways, pipe lines, lawns, or other existing improvements which are removed or disturbed in the course of the work shall be restored to their original condition at the expense of the Developer. In cutting through established lawns, the sod shall be removed before trenching and replaced after backfilling to the satisfaction of the property owner. A signed release for the work on a form acceptable to the District from the affected property owner may be required. As a minimum requirement, all restoration shall be made to the condition of the area prior to construction. In areas where restoration of existing improvements will be necessary and to provide records of existing improvements, the Developer shall provide photographs or videos before and after construction, as required and acceptable to the District.
Appears in 2 contracts
Sources: Agreement for Constructing Extensions to the Sewer System, Construction Contract