Returning to Work (a) Returning to work early (i) During the period of parental leave an Employee may return to work at any time as agreed between the Employer and the Employee, provided that time does not exceed four weeks from the recommencement date desired by the Employee. (ii) In the case of adoption, where the placement of an eligible child with an Employee does not proceed or continue, the Employee will notify the Employer immediately and the Employer will nominate a time not exceeding four weeks from receipt of notification for the Employee’s return to work. (b) Returning to work at conclusion of leave (i) At least four weeks prior to the expiration of parental leave, the Employee will notify the Employer of their return to work after a period of parental leave. (ii) Subject to 51.23(b)(iii), an Employee will be entitled to the position which they held immediately before proceeding on parental leave. In the case of an Employee transferred to a safe job pursuant to clause 51.12 above, the Employee will be entitled to return to the position they held immediately before such transfer. (iii) Where such position no longer exists but there are other positions available which the Employee is qualified for and is capable of performing, the Employee will be entitled to a position as nearly comparable in status and pay to that of their former position. (c) Returning to work at a reduced time fraction (i) To assist an Employee in reconciling work and parental responsibilities, an Employee may request to return to work at a reduced time-fraction until their Child reaches school age, after which the Employee will resume their substantive time-fraction. (ii) Where an Employee wishes to make a request under 51.23(c)(i) such a request must be made as soon as possible but no less than seven weeks prior to the date upon which the Employee is due to return to work from parental leave.
Reporting to Work All Contractor personnel shall report to their appropriate supervisor upon arrival at a CCI work location. Contractor Management shall ensure that Contractor personnel are given safety orientations for familiarization with potential job site hazards and emergency procedures.
WAIVER OF SPECIAL DAMAGES THE BORROWER WAIVES, TO THE MAXIMUM EXTENT NOT PROHIBITED BY LAW, ANY RIGHT THE UNDERSIGNED MAY HAVE TO CLAIM OR RECOVER FROM THE BANK IN ANY LEGAL ACTION OR PROCEEDING ANY SPECIAL, EXEMPLARY, PUNITIVE OR CONSEQUENTIAL DAMAGES.
Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians. (ii) The Contractor shall, pursuant to the notice under Clause 11.17 (i), suspend the Works or any part thereof for such time and in such manner as may be specified by the Authority and thereupon carry out remedial measures to secure the safety of suspended works, the Users and pedestrians. The Contractor may by notice require the Authority’s Engineer to inspect such remedial measures forthwith and make a report to the Authority recommending whether or not the suspension hereunder may be revoked. Upon receiving the recommendations of the Authority’s Engineer, the Authority shall either revoke such suspension or instruct the Contractor to carry out such other and further remedial measures as may be necessary in the reasonable opinion of the Authority, and the procedure set forth in this Clause 11.17 shall be repeated until the suspension hereunder is revoked. (iii) Subject to the provisions of Clause 21.6, all reasonable costs incurred for maintaining and protecting the Works or part thereof during the period of suspension (the “Preservation Costs”), shall be borne by the Contractor; provided that if the suspension has occurred as a result of any breach of this Agreement by the Authority, the Preservation Costs shall be borne by the Authority. (iv) If suspension of Works is for reasons not attributable to the Contractor, the Authority’s Engineer shall determine any Time Extension to which the Contractor is reasonably entitled.
Express Waiver: I desire to expressly waive any claim of confidentiality as to any and all information contained within our response to the competitive procurement process (e.g. RFP, CSP, Bid, RFQ, etc.) by completing the following and submitting this sheet with our response to Education Service Center Region 8 and TIPS.