Review of Utilitys Proposed Adjustments. a) The Engineer shall utilize the existing utility layout prepared to evaluate the nature of the conflict, and identify locations where additional ▇▇▇ work may be warranted. This shall be developed utilizing the utility layouts with Test Holes depicted at the approximate locations. The ▇▇▇ Work Plan shall identify the ▇▇▇ Levels to be conducted for each potential conflict and tentative schedule for its completion in an Excel spreadsheet format.
Appears in 2 contracts
Sources: Contract for Engineering Services, Contract for Engineering Services
Review of Utilitys Proposed Adjustments. a) a. The Engineer shall utilize the existing utility layout prepared to evaluate the nature of the conflict, and identify locations where additional ▇▇▇ work may be warranted. This shall be developed utilizing the utility layouts with Test Holes depicted at the approximate locations. The ▇▇▇ Work Plan shall identify the ▇▇▇ Levels to be conducted for each potential conflict and tentative schedule for its completion in an Excel spreadsheet format.
Appears in 1 contract
Sources: Contract for Engineering Services