Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.
Access to the Site 22.1 The Contractor shall allow the Engineer and any person authorized by the Engineer access to the Site, to any place where work in connection with the Contract is being carried out or is intended to be carried out and to any place where materials or plant are being manufactured / fabricated / assembled for the works.
Site Access Dell requires the right to access the APEX System in a timely way and as provided in the Service Offering Description to provide the Support Services. Failure to ensure that Customer provides Dell with timely access to a Site will relieve Dell of the Support Services obligations and Dell may also, at Dell’s discretion, suspend the APEX Service.
Site Lands or areas indicated in the Contract Documents as being furnished by the Owner upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Owner that are designated for the use of the Contractor. Also referred to as Project Site, Job Site and Premises.
Sleeping Rooms to be Blocked A. The Contractor shall block sleeping rooms as set forth in Table 1, below. Date1 3 3 Date2 104 104 Total Rooms to be Blocked: 211 211 B. The Contractor will provide the Judicial Council with a current Delegate List/Report, after the Cut Off Date and before Date 1 of the Program, as identified in Exhibit B. The Judicial Council will then provide to the Contractor in writing an approved Master Account Approval List. The Contractor shall not bill the Judicial Council for Attendee reservations not included on the Master Account Approval List. Unless expressly set forth otherwise, any Individual Charges are the responsibility of the Attendee occupying the room. C. At the request of the Judicial Council, the Contractor shall block additional sleeping rooms for Attendees at the sleeping room rate specified above in this exhibit, provided that the additional sleeping rooms are available for rental during the Dates of the Program, at the time of the request. D. The Contractor shall provide the Judicial Council with a credit to the Master Account equal to the value of one (1) double occupancy sleeping room for each fifty (50) paid room nights during the Program: