Road Use. The Parties agree that the Project Owner and its successors, assigns, contractors, agents and representatives may use public roads as part of the construction, operation, maintenance and repair of the Project. The Parties acknowledge that in connection with construction, operation and maintenance of electric collection lines, communications cables and other equipment, that Project facilities may cross road rights-of-way and/or drainage systems. The Project Owner agrees that it shall seek and obtain all permits typically required of others, such as driveway permits and rights-of-way crossing permits. Following issuance of a permit to proceed with construction being issued by the PSCW, Project Owner will engage a professional engineer to prepare an “Initial Condition” report for all roads expected to be heavily used during the construction process. The same engineering firm will be engaged to prepare a post-construction road condition report of the heavily affected roads. [placeholder for Town input on monetary repair policy (holding account?)] Throughout the construction of the Project, the Parties shall work cooperatively to maintain public road infrastructure in a safe condition for passage by the public.
Appears in 1 contract
Sources: Local Operating Contract
Road Use. The Parties agree that the Project Owner and its successors, assigns, contractors, agents and representatives may use public roads as part of the construction, operation, maintenance and repair of the Project. The Parties acknowledge that in connection with construction, operation and maintenance of electric collection lines, communications cables and other equipment, that Project facilities may cross road rights-of-way and/or drainage systems. The Project Owner agrees that it shall seek and obtain all permits typically required of others, such as driveway permits and rights-of-way crossing permits. Following issuance of a permit to proceed with construction being issued by the PSCW, Project Owner will engage a professional engineer to prepare an “Initial Condition” report for all roads expected to be heavily used during the construction process. The same engineering firm will be engaged to prepare a post-construction road condition report of the heavily affected roads. [placeholder Placeholder for Town county input on monetary repair policy (holding account?)] Throughout the construction of the Project, the Parties shall work cooperatively to maintain public road infrastructure in a safe condition for passage by the public.
Appears in 1 contract
Sources: Local Operating Contract