ROU Railway Project Clause Samples

ROU Railway Project. 3.3.1 ROU through the Ministry of Transport and Public Works - duly authorised by the owner of the infrastructure (State Railways Administration), will build and maintain the “CENTRAL RAILWAY” Railway Project that joins the Port of Montevideo with the city of Paso de los Toros according to the specifications and within the period indicated in Clause 3.3.2. 3.3.2 For such purposes, ROU has elected to call the international Public Bidding for its execution by means of a Public-Private Partnership contract, for: (a) executing the engineering, design, financing, repair, rehabilitation, and construction of the Railway Project in accordance with: i. the document entitled ”Railway Specifications”, which has been attached hereto as Annex 5.1 (hereinafter referred to as the ”Railway Specifications”); and ii. the document entitled “Railway Schedule” which has been attached hereto as Annex 5.2 (hereinafter referred to as the “Railway Schedule”)which provides, A) bid phase, reception of offers, evaluation, intervention of the Tribunal de Cuentas de la República as prescribed by Uruguayan laws, procedures, and definitive adjudication to contractor shall be completed by October 2018;

Related to ROU Railway Project

  • Employee Facilities Employee Facilities. Restrooms and attendant facilities shall be provided as required in the orders and regulations of the State of Washington Department of Labor and Industries. A good faith effort will be made by the Employer to provide facilities for employees’ personal belongings.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (eff. Sept. 1, 2023, Section 2275.0102(a)(1), pursuant to House Bill 4595, Acts 2023, 88th Leg., R.S.) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102 (eff. Sept. 1, 2023, Section 2275.0102, pursuant to House Bill 4595, Acts 2023, 88th Leg., R.S.), Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103 (eff. Sept. 1, 2023, Section 2275.0103, pursuant to House Bill 4595, Acts 2023, 88th Leg., R.S.), or (2) headquartered in any of those countries.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Infrastructure Modification of the location and/or sizing of the infrastructure for the Project that does not materially change the functionality of the infrastructure.