Routing Schedule Frequency and Cargo Payload Clause Samples

Routing Schedule Frequency and Cargo Payload 

Related to Routing Schedule Frequency and Cargo Payload

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity or aircraft types

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • FREQUENCY AND COVERAGE 3.1 All MI Reports must be completed by the Supplier using the MI Reporting Template and returned to the Authority on or prior to the Reporting Date every Month during the Framework Period and thereafter, until all transactions relating to Call Off Agreements have permanently ceased. 3.2 The MI Report should be used (among other things) to report Orders received and transactions occurring during the Month to which the MI Report relates, regardless of when the work was actually completed. For example, if an invoice is raised for October but the work was actually completed in September, the Supplier must report the invoice in October's MI Report and not September's. Each Order received by the Supplier must be reported only once when the Order is received. 3.3 The Supplier must return the MI Report for each Month even where there are no transactions to report in the relevant Month (a "Nil Return"). 3.4 The Supplier must inform the Authority of any errors or corrections to the Management Information: 3.4.1 in the next MI Report due immediately following discovery of the error by the Supplier; or 3.4.2 as a result of the Authority querying any data contained in an MI Report.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.