Runoff rate control Clause Samples

Runoff rate control. All runoff hydrological calculations shall be according to the methodology approved by the City Engineer. All storm water facilities shall be designed, installed and maintained to effectively accomplish the following: (a) Maintain predevelopment peak runoff rates for the 2-year, 24-hour storm event. (b) Maintain predevelopment peak runoff rates for the 10-year, 24-hour storm event. At a minimum the storm sewer conveyance system shall be designed for this storm event. (c) Low areas must have an acceptable overland drainage route with the proper transfer capacity when the storm event is exceeded. (d) Safely pass the 100-year, 24-hour storm event.
Runoff rate control. This development’s stormwater facilities must maintain predevelopment runoff rates for the 1) 50%, 24-hour storm; 2) 10%, 24-hour storm; 3) 1%, 24-hour storm.

Related to Runoff rate control

  • Deposit Pay ment of The Fixed Reserve Price 5.1. E-Bidders must make deposit payment as required under the Conditions of Sale attached to Proclamation of Sale, i.e. 10% of the reserve price. 5.2. Payment of the deposit must be made via local bank transfer in favour of Rajan Auctioneers Bidders Account (BIDDER DEPOS IT). Transaction must be done with in one (1) working day before the auction date with the following details; a) Account’s Name : RAJAN AUCTIONEERS SDN BHD - ACC2 b) Name of Bank : RHB BANK BERHAD c) Account Number : 21242400054193 d) Description : BIDDER DEPOSIT 5.3. Evidence of the transfer must be uploaded and submitted at the time of registration. 5.4. E-Bidders residing outside Malaysia/ (“Foreign E-Bidders”) must make deposit payment as required under the Conditions of Sale attached to Proclamation of Sale, i.e. 10% of the reserve price. Payment of the deposit must be made to as per mentioned in Proclamation of Sale in favour of the Auctioneer in accordance with 5.2 herein above with Swift Code as: ▇▇▇▇▇▇▇▇ ,Branch :▇▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇. Evidence of payment must be uploaded and submitted at ▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇@▇▇▇▇▇.▇▇▇ or WhatsApp to ▇▇▇-▇▇▇▇▇▇▇ within (4) working days before auction date.

  • Weed Control The tenant shall control all noxious weeds on the subject lands and maintain any summerfallow in a reasonably weed free condition.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • PAYMENT FROM OUTSIDE AGENCIES CONTRACTOR shall notify LEA when Medi-Cal or any other agency is billed for the costs associated with the provision of special education and/or related services to students. Upon request, CONTRACTOR shall provide to LEA any and all documentation regarding reports, billing, and/or payment by Medi-Cal or any other agency for the costs associated with the provision of special education and/or related services to students.

  • SUBSIDY CONTROL 33.1 The Contractor should obtain its own advice as to whether the Subsidy Control Rules apply to the Funding received in relation to the Services delivered under this Contract. Guidance on this can be found at Complying with the UK’s international obligations on subsidy control: guidance for public authorities - ▇▇▇.▇▇ (▇▇▇.▇▇▇.▇▇). 33.2 Where the rules on Subsidy Control apply, the Contractor must: 33.2.1 comply with the relevant notification requirements; and 33.2.2 collect and retain appropriate records and will supply those records to the Department on its request. 33.3 The Department reserves the right to require the Contractor to obtain a contribution towards the cost of the Services delivered under this Contract from the employer of any Learner. Where a contribution is required, the Department will confirm to the Contractor in writing the exact percentage of the contribution. 33.4 Where the Department requires the Contractor to obtain a contribution towards the cost of the Services under Clause 33.3 above, the Contractor must provide evidence that the contribution has been received. 33.5 If a recovery order or any other enforcement measure is taken under the Subsidy Control Act 2022, the Contractor will repay the relevant subsidy to the Department within 28 days or such other timescale that the Department agrees with the Contractor.