SAFETY AND PROTECTION OF PROPERTY. 1. Contractors shall police ongoing construction operations and activities at all times, keeping the premises orderly, maintaining cleanliness in and about the premises, and ensuring safety and protection of all areas, including loading docks, elevators, lobbies and all other public areas which are used for access to the premises. 2. Construction materials shall only be stored in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises, nor in any mechanical rooms, electrical rooms, etc. Materials left in unauthorized areas may be disposed of by LPC. 3. LPC assumes no responsibility for tools, materials or equipment stored at the building. 4. Contractors shall provide adequate protection to all carpets, wall surfaces, doors and trim in all public areas through which materials are transported. Contractors shall continuously clean such areas. Protective measures shall include runners over carpet, padding in elevators and any other measures determined by LPC. Any damage to existing walls, carpets, doors or trim during construction shall be repaired by the contractor to the satisfaction of LPC.
Appears in 3 contracts
Sources: Lease Agreement (Replimune Group, Inc.), Lease Agreement (uniQure B.V.), Lease Agreement (uniQure B.V.)