DISCHARGE, SUSPENSION AND WARNING 22.01 When the attitude or performance of an employee calls for a warning by the Employer, such a warning shall be a written one, and a copy of this warning will be forwarded immediately to the regional office of Local 52. 22.02 An employee may be suspended or discharged for proper cause by the Employer. Within five (5) workdays following suspension or discharge, the employee involved, together with a Local 52 Representative, may interview the Employer concerning the reason leading to the suspension or discharge. Within five (5) workdays following the interview, the Union may submit the complaint to arbitration.
Installation and Conversion State Street and the Fund shall be responsible for the technical installation and conversion (“Installation and Conversion”) of the Designated Configuration. The Fund shall have the following responsibilities in connection with Installation and Conversion of the System: (i) The Fund shall be solely responsible for the timely acquisition and maintenance of the hardware and software that attach to the Designated Configuration in order to use the Data Access Services at the Designated Locations, and (ii) State Street and the Fund each agree that they will assign qualified personnel to actively participate during the Installation and Conversion phase of the System implementation to enable both parties to perform their respective obligations under this Addendum.
CLEC to CLEC Conversions for Unbundled Loops 2.1.10.1 The CLEC to CLEC conversion process for unbundled Loops may be used by Lightyear when converting an existing unbundled Loop from another CLEC for the same end user. The Loop type being converted must be included in Lightyear’s Interconnection Agreement before requesting a conversion. 2.1.10.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must be the same Loop type with no requested changes to the Loop, must serve the same end user location from the same serving wire center, and must not require an outside dispatch to provision. 2.1.10.3 The Loops converted to Lightyear pursuant to the CLEC to CLEC conversion process shall be provisioned in the same manner and with the same functionality and options as described in this Attachment for the specific Loop type. Order Coordination (OC) Order Coordination – Time Specific (OC-TS) Test Points DLR Charge for Dispatch and Testing if No Trouble Found SL-1 (Non- Designed) Chargeable Option Chargeable Option Not available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office UCL-ND (Non- Designed) Chargeable Option Not Available Not Available Chargeable Option – ordered as Engineering Information Document Charged for Dispatch inside and outside Central Office Unbundled Voice Loops - SL-2 (including 2- and 4-wire UVL) (Designed) Included Chargeable Option Included Included Charged for Dispatch outside Central Office Unbundled Digital Loop (Designed) Included Chargeable Option (except on Universal Digital Channel) Included (where appropriate) Included Charged for Dispatch outside Central Office Unbundled Copper Loop (Designed) Chargeable in accordance with Section 2 Not available Included Included Charged for Dispatch outside Central Office For UVL-SL1 and UCLs, Lightyear must order and will be billed for both OC and OC-TS if requesting OC-TS.
Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes. 13.2 It shall be the responsibility of each Party to program and update its own switches and network systems pursuant to information provided on ASRs as well as the LERG in order to recognize and route traffic to the other Party’s assigned NXX codes. Except as expressly set forth in this Agreement, neither Party shall impose any fees or charges whatsoever on the other Party for such activities. 13.3 Unless otherwise required by Commission order, the Rate Center Areas will be the same for each Party. During the term of this Agreement, Onvoy shall adopt the Rate Center Area and Rate Center Points that the Commission has approved for Frontier within the LATA and Tandem serving area. Onvoy shall assign whole NPA-NXX codes to each Rate Center Area unless otherwise ordered by the FCC, the Commission or another governmental entity of appropriate jurisdiction, or the LEC industry adopts alternative methods of utilizing NXXs. 13.4 Onvoy will also designate a Routing Point for each assigned NXX code. Onvoy shall designate one location for each Rate Center Area in which the Onvoy has established NXX code(s) as the Routing Point for the NPA-NXXs associated with that Rate Center Area, and such Routing Point shall be within the same LATA as the Rate Center Area but not necessarily within the Rate Center Area itself. Unless specified otherwise, calls to subsequent NXXs of Onvoy will be routed in the same manner as calls to ▇▇▇▇▇’s initial NXXs. 13.5 Notwithstanding anything to the contrary contained herein, nothing in this Agreement is intended, and nothing in this Agreement shall be construed, to in any way constrain Onvoy’s choices regarding the size of the local calling area(s) that Onvoy may establish for its Customers, which local calling areas may be larger than, smaller than, or identical to Frontier’s local calling areas.
Loop Reservations 2.9.3.1 For a Mechanized LMU, NTBS may reserve up to ten (10) Loop facilities. For a Manual LMUSI, NTBS may reserve up to three (3) Loop facilities. 2.9.3.2 NTBS may reserve facilities for up to four (4) business days for each facility requested through LMU from the time the LMU information is returned to NTBS. During and prior to NTBS placing an LSR, the reserved facilities are rendered unavailable to other customers, including BellSouth. If NTBS does not submit an LSR for a UNE service on a reserved facility within the four (4)-day reservation timeframe, the reservation of that spare facility will become invalid and the facility will be released. 2.9.3.3 Charges for preordering Manual LMUSI or Mechanized LMU are separate from any charges associated with ordering other services from BellSouth. 2.9.3.4 All LSRs issued for reserved facilities shall reference the facility reservation number as provided by BellSouth. NTBS will not be billed any additional LMU charges for the Loop ordered on such LSR. If, however, NTBS does not reserve facilities upon an initial LMUSI, NTBS’s placement of an order for an advanced data service type facility will incur the appropriate billing charges to include SI and reservation per Exhibit A of this Attachment. 2.9.3.5 Where NTBS has reserved multiple Loop facilities on a single reservation, NTBS may not specify which facility shall be provisioned when submitting the LSR. For those occasions, BellSouth will assign to NTBS, subject to availability, a facility that meets the BellSouth technical standards of the BellSouth type Loop as ordered by NTBS.