Sampling and Testing. THE FOLLOWING IS ADDED TO THE FIRST PARAGRAPH: Ensure that the mix meets the requirements as specified in 902.02.04.A, otherwise the RE or ME will reject the material. THE SECOND PARAGRAPH IS CHANGED TO: During production at the plant, the ME will take a sample from each 700 tons of production to verify composition and air voids. Conduct draindown, VCAmix, VCAdry, and VMA testing as directed by the ME. Perform tests according to AASHTO R 46. THE FOURTH PARAGRAPH IS CHANGED TO: The ME will perform sampling according to NJDOT B-2 or ASTM D 3665, and will perform testing for composition according to AASHTO T 308, or NJDOT B-5. The ME will determine bulk specific gravity of the compacted sample according to AASHTO T 166 or AASHTO T 331. The ME will use the most current QC maximum specific gravity test result, obtained according to AASHTO T 209, in calculating the volumetric properties of the SMA. Perform testing for draindown according to AASHTO T 305.
Appears in 2 contracts
Sources: Contract for Resurfacing and Bridge Deck Repairs, Construction Contract