Scenario 4 Sample Clauses

Scenario 4. Full consolidation of the current Secretariat team and establishment of a Compliance Programme + 47,32 % / Scenario 3
Scenario 4 de overheid biedt collectieve opties aan
Scenario 4. Open Data lifecycle: maximizing OGD benefits
Scenario 4. In general, this scenario is a special scenario for demonstration high data traffic wireless channel for broadcasting with separating broadcasting hub and event location can be facilitated using either direct connection or multi-hops depending on required data rate. The Scenario 4 is designed for the case of high data transportation between Olympic stadium and Berlin-Messe, where broadcasting centre is arranged in Berlin-Messe using exist glass fibre. In the meantime any cables are available at Olympic stadium even though events are held on the spot. Fig. 13 shows possible rays for connecting wireless channel between two sites, where red points are relay locations and green lines represent designed path for wireless channel, namely direct transmission with solid line, one hop with dashed line and two hops with dotted line. 3D map of Berlin Scenario 4 is also shown in Fig. 14.
Scenario 4. TCCA has not completed the certification process for a Canadian applicant and EASA validation is in progress. The procedure for continued validation is: a. The Canadian applicant will apply for a CAA validation pursuant to the TIP, and provide the CAA with the same documentation and data package provided to EASA; and b. At the discretion of the Canadian applicant, validation may be completed under one of the following alternatives; (i) If the current EASA validation activity for that application will result in an EASA validation design approval issued no later than December 31, 2022, the CAA will take into consideration the completion of the EASA validation activity and issuance of EASA design approval as a basis for the CAA to issue its own approval without further technical involvement by the CAA, Or (ii) If the EASA validation will not be completed by December 31, 2022, the CAA and TCCA will mutually recognize and accept all EASA and TCCA validation decisions made to date and continue to follow or maintain the EASA/TCCA project validation plan to the greatest extent practicable. TCCA and the CAA will follow the validation procedures in the TIP that are applicable to the remaining parts of the project.
Scenario 4 a < c < d < b, it is noted in the scenario that a + d < b + c. The combined domain is shown in Figure F. Figure F The combined domain of X1, X2 From the situation, (1 + 2 ≤ ), the distribution function of X1 + X2 can be derived based on five possible cases as follows: Case 1: ≤ + Case 2: + ≤ ≤ + Case 3: + ≤ ≤ + Case 4: + ≤ ≤ + Case 5: ≥ + Hence, the summary of the distribution of X is shown as follows: Probability density function (when a + d ≤ b + c): () = 0 , ≤ + ( − )( − ) , + ≤ ≤ + ( − ) , + ≤ ≤ + − + ( + ) ( − )( − ) , + ≤ ≤ + Cumulative distribution function (when a + d ≤ b + c): () = 2 − 2( + ) + ( + )2 2( − )( − ) , + ≤ ≤ + 2( − ) + (2 − 2 − 2( − )) 2( − )( − ) , + ≤ ≤ + −2 + 2( + ) − (2 + 2 + 2( + − )) 2( − )( − ) , + ≤ ≤ + { 1 , ≥ + Under this case, the expectation can be derived as follows: [] = [1 + 2] = [1] + [2] =

Related to Scenario 4

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.