Scope of Services Summary. Survey: Additional survey was needed when TxDOT required a transition from CR 56 into Brazoria County. Once the drainage was designed the size of the ponds were found to be much larger. TxDOT also instructed us to move a pond as a permit was issued for a development. Geotech: Additional borings are needed due to the additional pond and the increase in size of Pond 2
Appears in 2 contracts
Sources: Agreement for Professional Engineering Services, Professional Services