SCOPE OF WORK OVERVIEW. The Project shall be engineered and constructed in accordance to the performance and design requirements identified in the Scope of Work, Exhibits and Appendices and other documents referenced herein and shall meet or exceed the technical specifications utilized in the attached PVsyst summary document provided as Attachment 4 to Exhibit A. The Project shall be designed to meet a minimum [***]-year design life, considering the site specific conditions and expected operating conditions. The Contractor shall provide or cause to be provided materials, equipment, machinery, tools, labor, demolition, disposal, transportation, construction fuels, chemicals, construction utilities, administration and other services and items required to complete the project per the requirements set forth in the Agreement. In accordance with the Agreement, the Contractor shall acquire and comply with construction permits for the solar array and comply with all permits obtained by the Owner. The Contractor has provided an Energy Production Model based upon its proposed design using the latest version of PVSyst simulation software (report and 8760 hourly generation file). 8760 hourly generation reports and excel files shall be provided for [***] years of generation using the basis of [***] annual degradation on the DC energy. The summer PVsyst report is provided as Attachment 4 to this Exhibit A and the 8760 hourly generation report is provided as Attachment 5 to Exhibit A. Solar Irradiance information should be obtained from National Renewable Energy Laboratory (NREL) Solar Power Prospector at ▇▇▇▇://▇▇▇▇.▇▇▇▇.▇▇▇/prospector, (Average Annual GHI) for the Site. The Project shall be oriented physically to optimize annual energy production. The PV module arrangement, inverter locations and internal access roads (sufficient to allow module washing as required) shall be determined by Contractor. The Contractor shall design the solar field layout with reference to any required setbacks along the Project property boundary (and sufficient for a security patrol road or inspection around the Project perimeter). All equipment shall be grounded and bonded in accordance with NEC.
Appears in 2 contracts
Sources: Engineering, Procurement and Construction Agreement (Powersecure International, Inc.), Engineering, Procurement and Construction Agreement (Powersecure International, Inc.)
SCOPE OF WORK OVERVIEW. The Project shall be engineered and constructed in accordance to the performance and design requirements identified in the Scope of Work, Exhibits and Appendices and other documents referenced herein and shall meet or exceed the technical specifications utilized in the attached PVsyst summary document provided as Attachment 4 to Exhibit A. The Project shall be designed to meet a minimum [***]-year design life, considering the site specific conditions and expected operating conditions. The Contractor shall provide or cause to be provided materials, equipment, machinery, tools, labor, demolition, disposal, transportation, construction fuels, chemicals, construction utilities, administration and other services and items required to complete the project per the requirements set forth in the Agreement. In accordance with the Agreement, the Contractor shall acquire and comply with construction permits for the solar array and comply with all permits obtained by the Owner. The Contractor has provided an Energy Production Model based upon its proposed design using the latest version of PVSyst simulation software (report and 8760 hourly generation file). 8760 hourly generation reports and excel files shall be provided for [***] years of generation using the basis of [***] annual degradation on the DC energy. The summer PVsyst report is provided as Attachment 4 to this Exhibit A and the 8760 hourly generation report is provided as Attachment 5 to Exhibit A. Solar Irradiance information should be obtained from National Renewable Energy Laboratory (NREL) Solar Power Prospector at ▇▇▇▇://▇▇▇▇.▇▇▇▇.▇▇▇/prospector, (Average Annual GHI) for the Site. The Project shall be oriented physically to optimize annual energy production. The PV module arrangement, inverter locations and internal access roads (sufficient to allow module washing as required) shall be determined by Contractor. The Contractor shall design the solar field layout with reference to any required setbacks along the Project property boundary (and sufficient for a security patrol road or inspection around the Project perimeter). All equipment shall be grounded and bonded in accordance with NEC.
3.1.1 Minimum Photovoltaic Plant Requirements DC:AC Ratio [***] 8 Rev. A Portions of this Exhibit, indicated by the ▇▇▇▇ “[***],” were omitted and have been filed separately with the Securities and Exchange Commission pursuant to the Registrant’s application requesting confidential treatment pursuant to Rule 24b-2 of the Securities Exchange Act of 1934, as amended. Exhibit A Scope of Work [***] Tilt: [***] Fixed Tilt Azimuth: [***] DC Solar Field shall be fixed tilt The Project shall be designed for autonomous operation excluding maintenance. The Plant shall be designed to meet the requirements of the receiving transmission system, including the capability to operate within the power factor range of [***] lagging at the Point of Interconnection with the Participating TO at continuous rated power output and follow a voltage schedule. The Plant shall meet harmonics requirements.
Appears in 1 contract
Sources: Engineering, Procurement and Construction Agreement