Scour Analysis. The Engineer shall provide the following services: 1. Perform a scour analysis (which shall be signed and sealed) for each proposed bridge structure. 2. Prepare each scour analysis using a State-approved methodology listed in the Work Authorization. The Engineer shall select the methodology based on the site conditions such as the presence of cohesive or cohesionless soil, rock or depth of rock, proposed foundation type, and existing site performance. The Engineer shall follow the methodology outlined in the State Geotechnical Manual. The Engineer shall coordinate with the State prior to commencing any work on any Stream Migration Study. This coordination must include consultation with the appropriate State technical expert. 3. Provide the State the potential scour depths, envelope and any recommended countermeasures including bridge design modifications and/or revetment.
Appears in 1 contract
Sources: Contract for Engineering Services
Scour Analysis. The Engineer shall provide the following services:
1. Perform a scour analysis (which shall be signed and sealed) for each proposed bridge structure.
2. Prepare each scour analysis using a State-approved methodology listed in the Work Authorization. The Engineer shall select the methodology based on the site conditions such as the presence of cohesive or cohesionless soil, rock or depth of rock, proposed foundation type, and existing site performance. The Engineer shall follow the methodology outlined in the State Geotechnical Manual. The Engineer shall coordinate with the State prior to commencing any work on any Stream Migration Study. This coordination must include consultation with the appropriate State technical expert.
3. Provide the State the potential scour depths, envelope and any recommended countermeasures including bridge design modifications and/or revetmentand revetments.
Appears in 1 contract
Sources: Contract for Engineering Services
Scour Analysis. The Engineer shall provide the following services:
1. Perform a scour analysis (which shall be signed and sealed) for each proposed bridge structure.
2. Prepare each scour analysis using a State-approved methodology listed in the Work Authorization. The Engineer shall select the methodology based on the site conditions such as the presence of cohesive or cohesionless soil, rock or depth of rock, proposed foundation type, and existing site performance. The Engineer shall follow the methodology outlined in the State Geotechnical Manual. The Engineer shall coordinate with the State prior to commencing any work on any Stream Migration Study. This coordination must include consultation with the appropriate State technical expert.. DocuSign Envelope ID: ED57FAE2-481A-4535-A126-CE7F0E526760
3. Provide the State the potential scour depths, envelope and any recommended countermeasures including bridge design modifications and/or revetmentand revetments.
Appears in 1 contract
Sources: Contract for Engineering Services