Screening and Removal of Unacceptable Waste. The Company shall inspect loads being delivered to the Transfer Station and Drop-Box Sites before unloading, and shall require that the Authorized Haulers and self-haulers remove from any vehicle delivering waste to the Transfer Station and Drop-Box Sites all items of waste which are Unacceptable Waste. If the Company reasonably determines that it would be impractical to remove such items, then the Company shall have the right to refuse to accept the entire delivery as constituting Unacceptable Waste, and such waste shall not be considered available Solid Waste. The Company shall inspect, for the presence of Unacceptable Waste, all loads of waste dumped on the tipping floor. The Company shall require Authorized Haulers that dumped Unacceptable Waste on the tipping floor to remove such waste from the Transfer Station. If there is Unacceptable Waste on the tipping floor that was not identified in a timely manner and returned to the Authorized Hauler that delivered such Unacceptable Waste, despite the Company’s diligence, the Company shall move the Unacceptable Waste to a specified area at the Transfer Station and notify the County and all other appropriate Governmental Bodies as required by Applicable Law. The Company shall arrange to remove the Unacceptable Waste in accordance with subsection (H) of this Section.
Screening and Removal of Unacceptable Waste. The County shall not knowingly deliver, and shall use legal means reasonably available to prevent the delivery of, Unacceptable Waste to the Facility. The Company shall refuse to accept any Unacceptable Waste delivered to the Landfill Operation Areas which is revealed by inspection of a load. If any Unacceptable Waste is delivered in any load, the Company shall immediately stop the customer from unloading of the waste. If the Company finds Unacceptable Waste in a load and the customer is still in possession of the load, the Company shall immediately notify the Administrative Agent or their designee so that the County can follow up with the customer on the proper handling or disposal method for the Unacceptable Waste. If the Company finds Unacceptable Waste in a load and the customer is no longer in possession of the load, then the Company is responsible for properly disposing of the waste according to federal, state, and local regulations or policies at the Company’s expense. If the Company determines who the generator of the waste is, the Company may seek recovery for expenses incurred; notification to the County is required.

Related to Screening and Removal of Unacceptable Waste

  • OIG Removal of IRO In the event OIG has reason to believe the IRO does not possess the qualifications described in Paragraph B, is not independent and objective as set forth in Paragraph E, or has failed to carry out its responsibilities as described in Paragraph C, OIG shall notify Practitioner in writing regarding OIG’s basis for determining that the IRO has not met the requirements of this Appendix. Practitioner shall have 30 days from the date of OIG’s written notice to provide information regarding the IRO’s qualifications, independence or performance of its responsibilities in order to resolve the concerns identified by OIG. If, following OIG’s review of any information provided by Practitioner regarding its IRO, OIG determines that the IRO has not met the requirements of this Appendix, OIG shall notify Practitioner in writing that Practitioner shall be required to engage a new IRO in accordance with Paragraph A of this Appendix. Practitioner must engage a new IRO within 60 days of receipt of OIG’s written notice. The final determination as to whether or not to require Practitioner to engage a new IRO shall be made at the sole discretion of OIG.

  • Removal of General Partner (a) Upon the occurrence of an Event of Bankruptcy as to, or the dissolution of, the General Partner, the General Partner shall be deemed to be removed automatically; provided, however, that if the General Partner is on the date of such occurrence a partnership, the withdrawal, death, dissolution, Event of Bankruptcy as to or removal of a partner in such partnership shall be deemed not to be a dissolution of the General Partner if the business of the General Partner is continued by the remaining partner or partners. The Limited Partners may not remove the General Partner, with or without cause. (b) If the General Partner has been removed pursuant to this Section 7.04 and the Partnership is continued pursuant to Section 7.03, the General Partner shall promptly transfer and assign its General Partnership Interest in the Partnership to the substitute General Partner approved by a Majority in Interest in accordance with Section 7.03(b) and otherwise be admitted to the Partnership in accordance with Section 7.02. At the time of assignment, the removed General Partner shall be entitled to receive from the substitute General Partner the fair market value of the General Partnership Interest of such removed General Partner as reduced by any damages caused to the Partnership by such General Partner. Such fair market value shall be determined by an appraiser mutually agreed upon by the General Partner and a Majority in Interest (excluding the General Partner and any Subsidiary of the General Partner) within ten days following the removal of the General Partner. In the event that the parties are unable to agree upon an appraiser, the removed General Partner and a Majority in Interest (excluding the General Partner and any Subsidiary of the General Partner) each shall select an appraiser. Each such appraiser shall complete an appraisal of the fair market value of the removed General Partner’s General Partnership Interest within 30 days of the General Partner’s removal, and the fair market value of the removed General Partner’s General Partnership Interest shall be the average of the two appraisals; provided, however, that if the higher appraisal exceeds the lower appraisal by more than 20% of the amount of the lower appraisal, the two appraisers, no later than 40 days after the removal of the General Partner, shall select a third appraiser who shall complete an appraisal of the fair market value of the removed General Partner’s General Partnership Interest no later than 60 days after the removal of the General Partner. In such case, the fair market value of the removed General Partner’s General Partnership Interest shall be the average of the two appraisals closest in value. (c) The General Partnership Interest of a removed General Partner, during the time after default until transfer under Section 7.04(b), shall be converted to that of a special Limited Partner; provided, however, such removed General Partner shall not have any rights to participate in the management and affairs of the Partnership, and shall not be entitled to any portion of the income, expense, profit, gain or loss allocations or cash distributions allocable or payable, as the case may be, to the Limited Partners. Instead, such removed General Partner shall receive and be entitled only to retain distributions or allocations of such items that it would have been entitled to receive in its capacity as General Partner, until the transfer is effective pursuant to Section 7.04(b). (d) All Partners shall have given and hereby do give such consents, shall take such actions and shall execute such documents as shall be legally necessary and sufficient to effect all the foregoing provisions of this Section 7.04.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will ▇▇▇▇ ▇▇▇▇▇▇▇ Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Provision and Removal of Equipment B2.1 The Contractor shall provide all the Equipment necessary for the supply of the Services.

  • Snow Removal Only the right of way will be plowed in the parking lots. Licensee is responsible for removing snow around his/her own vehicle (without causing damage or inconvenience to any other vehicles lawfully on the Premises).