Sediment and Erosion Control. The Design-Builder shall be responsible for installing sediment and erosion control measures, inclusive of, but not limited to: silt fencing, inlet protection, stabilized construction entrances, and other control measures.
Appears in 30 contracts
Sources: Design Build Agreement, Design Build Agreement, Design Build Agreement
Sediment and Erosion Control. The Design-Builder shall be responsible for installing sediment and erosion control measuresmeasures in accordance with DOEE guidelines, inclusive of, but not limited to: silt fencing, inlet protection, stabilized construction entrances, and other control measures. The Design-Builder shall be responsible for scheduling and coordination of DOEE Kick-Off Meeting.
Appears in 1 contract
Sources: Design Build Agreement