Common use of Sediment and Erosion Control Clause in Contracts

Sediment and Erosion Control. a) Development design and construction shall comply with applicable state and local soil and erosion control regulations and shall incorporate erosion and sediment control measures for all land-disturbing activities. The Developer Owners, Parcel Owners or the Representative shall be responsible for implementing erosion and sedimentation control measures for all land disturbing projects. b) The Property will meet the following higher standards during construction: Cleared Area Unlimited 8 acres Skimmer Basin - Design Storm 10 year 100 year - Number of Baffles 3 5 - Draw down time (10-year storm) 2-5 days 2-5 days - Basin Freeboard height 1 foot 2 feet Temp. Diversion Ditch Capacity 10 year 25 year Temp. Diversion Ditch Lining 2 year 10 year Perimeter Silt Fence Wire Chain Link Inspection Frequency After storm event Daily Construction Sequencing 2 stages 4 stages Temporary Seeding Time 14 days 7 days Construction Entrance 50 feet 75 feet Wash rack at entrance Not required Provided Polyacrylamide Not required Provided c) Before starting any land-disturbing activity that results in a cumulative disturbance greater than twenty thousand (20,000) square feet, the Developer Owners, Parcel Owners, or the Representative shall obtain a grading permit from the Orange County Erosion Control Division. d) The Developer Owners, Parcel Owners or the Representative if any, shall include the erosion and sediment control plan in the Development Agreement Compliance Permit application.

Appears in 2 contracts

Sources: Development Agreement, Development Agreement

Sediment and Erosion Control. a) Development design and construction shall comply with applicable state and local soil and erosion control regulations and shall incorporate erosion and sediment control measures for all land-disturbing activities. The Developer Owners, Parcel Owners or the Representative shall be responsible for implementing erosion and sedimentation control measures for all land disturbing projects. b) The Property will meet the following higher standards during construction: Cleared Area Unlimited 8 acres Skimmer Basin - Design Storm 10 year 100 year - Number of Baffles 3 5 - Draw down time (10-year storm) 2-5 days 2-5 days - Basin Freeboard height 1 foot 2 feet Temp. Diversion Ditch Capacity 10 year 25 year Temp. Diversion Ditch Lining 2 year 10 year Perimeter Silt Fence Wire Chain Link Inspection Frequency After storm event Daily Construction Sequencing 2 stages 4 stages Temporary Seeding Time 14 days 7 days Construction Entrance 50 feet 75 feet Wash rack at entrance Not required Provided Polyacrylamide Not required Provided c) Before starting any land-disturbing activity that results in a cumulative disturbance greater than twenty thousand (20,000) square feet, the Developer Owners, Parcel Owners, or the Representative shall obtain a grading permit from the Orange County Erosion Control Division. d) . The Developer Owners, Parcel Owners or the Representative if any, shall include the erosion and sediment control plan in the Development Agreement Compliance Permit application.

Appears in 1 contract

Sources: Development Agreement

Sediment and Erosion Control. Updated information (February 10 and February 19, 2015) 5.235.18 [OBEY CREEK: Following language has been drafted by the Town staff; this language may be revised, as necessary.] a) Development design and construction shall comply with applicable state and local soil and erosion control regulations and shall incorporate erosion and sediment control measures for all land-disturbing activities. The Developer Owners, Parcel Owners or andor the Representative shall be responsible for implementing erosion and sedimentation control measures for all land disturbing projects. b) The Property DevelopmentProperty will meet the following higher standards during construction: Cleared Area Unlimited 8 acres Skimmer Basin - Design Storm 10 year 100 year - Number of Baffles 3 5 - Draw down time (10-year storm) 2-5 days 2-5 days - Basin Freeboard height 1 foot 2 feet Temp. Diversion Ditch Capacity 10 year 25 year Temp. Diversion Ditch Lining 2 year 10 year Perimeter Silt Fence Wire Chain Link Inspection Frequency After storm event Daily Construction Sequencing 2 stages 4 stages Temporary Seeding Time 14 days 7 days Construction Entrance 50 feet 75 feet Wash rack at entrance Not required Provided Polyacrylamide Not required Provided c) Before starting any land-disturbing activity that results in a cumulative disturbance greater than twenty thousand (20,000) square feet, the Developer Owners, Parcel Owners, or the Representative shall obtain a grading permit from the Orange County Erosion Control Division. d) . The Developer Owners, Parcel Owners or andor the Representative if any, shall include the erosion and sediment control plan in the Development Agreement Compliance Permit application.

Appears in 1 contract

Sources: Development Agreement

Sediment and Erosion Control. a) Development design and construction shall comply with applicable state and local soil and erosion control regulations and shall incorporate erosion and sediment control measures for all land-disturbing activities. The Developer Owners, Parcel Owners or the Representative shall be responsible for implementing erosion and sedimentation control measures for all land disturbing projects. b) . The Property will meet the following higher standards during construction: Cleared Area Unlimited 8 acres Skimmer Basin - Design Storm 10 year 100 year - Number of Baffles 3 5 - Draw down time (10-year storm) 2-5 days 2-5 days - Basin Freeboard height 1 foot 2 feet Temp. Diversion Ditch Capacity 10 year 25 year Temp. Diversion Ditch Lining 2 year 10 year Perimeter Silt Fence Wire Chain Link Inspection Frequency After storm event Daily Construction Sequencing 2 stages 4 stages Temporary Seeding Time 14 days 7 days Construction Entrance 50 feet 75 feet Wash rack at entrance Not required Provided Polyacrylamide Not required Provided c) Provided Before starting any land-disturbing activity that results in a cumulative disturbance greater than twenty thousand (20,000) square feet, the Developer Owners, Parcel Owners, or the Representative shall obtain a grading permit from the Orange County Erosion Control Division. d) . The Developer Owners, Parcel Owners or the Representative if any, shall include the erosion and sediment control plan in the Development Agreement Compliance Permit application.

Appears in 1 contract

Sources: Development Agreement