How Do I Correct an Excess Contribution? If you make a contribution in excess of your allowable maximum, you may correct the excess contribution and avoid the 6% penalty tax under Section 4973 of the Internal Revenue Code for that year by withdrawing the excess contribution and its earnings on or before the due date, including extensions, of the tax return for the tax year for which the contribution was made (generally October 15th). Any earnings on the withdrawn excess contribution may be subject to a 10% early distribution penalty tax if you are under age 59½. In addition, in certain cases an excess contribution may be withdrawn after the time for filing your tax return. Finally, excess contributions for one year may be carried forward and applied against the contribution limitation in succeeding years.
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.
Previously Reviewed Receivable; Duplicative Tests If any Review Receivable was included in a prior Review, the Asset Representations Reviewer will not conduct additional Tests on such Review Receivable, but will include the previously reported Test results in the Review Report for the current Review. If the same Test is required for more than one representation and warranty, the Asset Representations Reviewer will only perform the Test once for each Review Receivable, but will report the results of the Test for each applicable representation and warranty on the Review Report.
Total Contract Amount The contract total for services shall not exceed $1,200,000. Pricing shall be per Exhibit F attached.
Data Subject Requests To the extent legally permitted, Okta shall promptly notify Customer if Okta receives a request from a Data Subject to exercise the Data Subject's right of access, right to rectification, restriction of Processing, erasure (“right to be forgotten”), data portability, object to the Processing, or its right not to be subject to an automated individual decision making (“Data Subject Request”). Factoring into account the nature of the Processing, Okta shall assist Customer by appropriate organizational and technical measures, insofar as this is possible, for the fulfilment of Customer’s obligation to respond to a Data Subject Request under Data Protection Laws and Regulations. In addition, to the extent Customer, in its use of the Service, does not have the ability to address a Data Subject Request, Okta shall, upon Customer’s request, provide commercially- reasonable efforts to assist Customer in responding to such Data Subject Request, to the extent that Okta is legally authorized to do so, and the response to such Data Subject Request is required under Data Protection Laws and Regulations. To the extent legally permitted, Customer shall be responsible for any costs arising from Okta’s provision of such assistance.