The 'Single/Panel Redundant-Level 1 Power Failure' clause defines the responsibilities and procedures in the event of a power failure affecting a single power panel or a Level 1 redundant power system. Typically, this clause outlines the steps that must be taken by the service provider to restore power, the timeframe for response, and any notification requirements to affected parties. For example, it may specify that backup systems must be engaged immediately and that clients must be informed within a certain period. The core function of this clause is to ensure continuity of service and minimize downtime by clearly assigning duties and expectations during a specific type of power outage.
Single/Panel Redundant-Level 1 Power Failure. In the event any Single/Panel Redundant-Level 1 Power Failure occurs on any particular day, then, {A) with respect to each Panel Redundant Circuit (if any) that is the subject of the. Single/Panel Redundant-Level 1 Power Failure, Customer’s pro rata Monthly License Fees for the affected Individual Space for that particular day shall be partially abated by the Daily Circuit Abatement Amount, and (B) with respect to each Single Circuit (if any) that is the subject of the Single/Panel Redundant-Level 1 Power Failure, Customer’s pro rata Monthly License Fees for the affected Individual Space for that particular day shall be partially abated by the Single Circuit Daily Abatement Amount (as defined below). The “Single Circuit Daily Abatement·Amount” is defined as ***.
Single/Panel Redundant-Level 1 Power Failure. In the event any Single/Panel Redundant Level 1 Power Failure occurs on any particular day, then, with respect to each Single Circuit (if any), or each Panel Redundant Circuit (if any), that is the subject of the Single/Panel Redundant-Level 1 Power Failure, Licensee's pro rata Monthly License Fees for the affected Individual Space tor that particular day shall be partially abated by the Daily Circuit Abatement Amount.
Single/Panel Redundant-Level 1 Power Failure. A "Single/Panel Redundant-Level 1 Power Failure shall be deemed to have occurred in a particular calendar month if any particular single power circuit (with only an A Circuit, and no B Circuit) (a "Single Circuit) licensed by Licensee from Licensor (and otherwise used by Licensee in the ordinary course of business immediately prior to the unavailability) or any particular redundant panel power circuit with both an A Circuit and a B Circuit (a panel “Redundant Circuit"), licensed by Licensee from Licensor (and otherwise used by Licensee in the ordinary course of business immediately prior to the unavailability), is unavailable to Licensee for more than twenty-six (26) cumulative seconds in any calendar month at the Demarcation Point, provided that, with respect to any such Panel Redundant Circuit, such unavailability simultaneously occurs and continues with respect to both the A Circuit and the B Circuit at all times in question.

Related to Single/Panel Redundant-Level 1 Power Failure

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Service Level Expectations Without limiting any other requirements of the Agreement, the Service Provider shall meet or exceed the following standards, policies, and guidelines:

  • EPP service availability Refers to the ability of the TLD EPP servers as a group, to respond to commands from the Registry accredited Registrars, who already have credentials to the servers. The response shall include appropriate data from the Registry System. An EPP command with “EPP command RTT” 5 times higher than the corresponding SLR will be considered as unanswered. If 51% or more of the EPP testing probes see the EPP service as unavailable during a given time, the EPP service will be considered unavailable.