Common use of SITE OF THE PROJECT Clause in Contracts

SITE OF THE PROJECT. 1 The Site 1.1 Site “Rehabilitation /Treatment of Landslide & Sinking Zone Locations with Slope Protection works and Drainage improvement at Kameda to Devlibagad-2 (Km 384.680 to 411.530) of NH-07 in Chamoli District in the state of Uttarakhand through an Engineering Procurement and construction (EPC) Contract” Project shall include existing status of the land, buildings, structures and road works as described in Annex-I of this Schedule-A. 1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of this Schedule-A. 1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any other immovable property on, or attached to, the Site shall be prepared jointly by the Authority Representative and the Contractor, and such inventory shall form part of the memorandum referred to in Clause 8.2.1 of this Agreement. 1.4 The alignment plans of the Project sites are specified in Appendix-B1, where the restoration / rehabilitation / treatment work of landslide and Sinking zone is contemplated. 1.5 The status of the environment clearances obtained or awaited is given in Annexure IV. 1.6 The subject project is excluding of highway construction work. All the works are exclusive of carriage way, shoulder and drain, which is a part of existing highway contract. 1. The Site for the Project comprises the section of National Highway-07 for Rehabilitation

Appears in 1 contract

Sources: Epc Agreement

SITE OF THE PROJECT. 1 The Site 1.1 Site “Rehabilitation /Treatment of Landslide & Sinking Zone Locations with Slope Protection works and Drainage improvement at Kameda Nandprayag to Devlibagad-2 Bhanerpani (Km 384.680 416.930 to 411.530446.025) of NH-07 in Chamoli District in the state of Uttarakhand through an Engineering Procurement and construction (EPC) Contract” Project shall include existing status of the land, buildings, structures and road works as described in Annex-I of this Schedule-A. 1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of this Schedule-A. 1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any other immovable property on, or attached to, the Site shall be prepared jointly by the Authority Representative and the Contractor, and such inventory shall form part of the memorandum referred to in Clause 8.2.1 of this Agreement. 1.4 The alignment plans of the Project sites are specified in Appendix-B1, where the restoration / rehabilitation / treatment work of landslide and Sinking zone is contemplated. 1.5 The status of the environment clearances obtained or awaited is given in Annexure IV. 1.6 The subject project is excluding of highway construction work. All the works are exclusive of carriage way, shoulder and drain, which is a part of existing highway contract. 1. The Site for the Project comprises the section of National Highway-07 for RehabilitationforRehabilitation

Appears in 1 contract

Sources: Epc Agreement