Site Preparation (Mobilization/De-mobilization. The total price bid for Site Preparation (Mobilization/Demobilization) shall not exceed five (5) percent of the total amount of the remaining bid items. The lump sum price for Item 1 shall constitute full compensation for preparing the site including (but not limited to): sawcutting of sidewalks, roadways, and driveways; removal and stockpiling of loam; removal and disposal of trees, brush, and stumps as required; disposal of surplus loam material as directed; protecting property pins, bounds and other documentation, fences, walls, and walks; and removing and resetting signs as required. The price shall also include protection of excavations left open, all safety and construction signage, obtaining all permits, cleanup and all other related work necessary, indicated by the plans, or as specified or directed.

Related to Site Preparation (Mobilization/De-mobilization

  • Mobilization Design-Builder shall mobilize, transport and assemble its equipment, materials, and supplies, as well as construct such temporary systems as are necessary and required at the Site, all in adequate time for satisfactory performance of the Work.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Site Preparation Axon will provide a hardcopy or digital copy of current user documentation for the Axon Devices ("User Documentation"). User Documentation will include all required environmental specifications for the professional services and Axon Devices to operate per the Axon Device User Documentation. Before installation of Axon Devices (whether performed by Customer or Axon), Customer must prepare the location(s) where Axon Devices are to be installed ("Installation Site") per the environmental specifications in the Axon Device User Documentation. Following installation, Customer must maintain the Installation Site per the environmental specifications. If Axon modifies Axon Device User Documentation for any Axon Devices under this Agreement, Axon will provide the update to Customer when Axon generally releases it

  • Construction Management Fee The Construction Management Fee for the Project shall be either a ☒Lump Sum or ☐Not-To-Exceed Fee of Thirty-Six Thousand, Four Hundred Seventy-Seven Dollars and Sixty-Five Cents ($36,477.65). NOTE: Allowances will be on a Not-To-Exceed basis. All unused funds will be returned to the School District at the time of construction closeout. Fee will be paid only on cost of work for these items. Exhibit C- Project Assignment Page 2 of 4

  • Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.