Soils Engineering. 1.4.9.1 The DESIGN-BUILD TEAM shall obtain the necessary borings and/or soundings and shall prepare an adequate, formal geological report(s) from data obtained by the same as further described in Attachment 1. The DESIGN-BUILD TEAM shall show the rock lines and special treatments on the roadway cross-section sheets following the guidance in the STATE's Design Guidelines and the Project Delivery Network. 1.4.9.2 The DESIGN-BUILD TEAM shall provide a qualified soils engineer for any needed analysis or evaluation of the samples taken at the various locations. The DESIGN-BUILD TEAM shall also perform the actual supervision of the boring procedures and field layouts.
Appears in 2 contracts
Sources: Progressive Design Build Contract, Progressive Design Build Contract
Soils Engineering. 1.4.9.1 1.5.9.1 The DESIGN-BUILD TEAM shall obtain the necessary borings and/or soundings and shall prepare an adequate, formal geological report(s) from data obtained by the same as further described in Attachment 1. The DESIGN-BUILD TEAM shall show the rock lines and special treatments on the roadway cross-section sheets following the guidance in the STATE's Design Guidelines and the Project Delivery Network.
1.4.9.2 1.5.9.2 The DESIGN-BUILD TEAM shall provide a qualified soils engineer for any needed analysis or evaluation of the samples taken at the various locations. The DESIGN-BUILD TEAM shall also perform the actual supervision of the boring procedures and field layouts.
Appears in 1 contract
Sources: Progressive Design Build Contract