Sorting requirements Sample Clauses

The "Sorting requirements" clause defines the standards and procedures for organizing, categorizing, or arranging items, data, or materials within a given context. This clause typically specifies the criteria by which sorting must occur, such as by date, type, priority, or other relevant attributes, and may outline responsibilities for performing the sorting or the tools to be used. Its core practical function is to ensure consistency and efficiency in handling items or information, thereby reducing errors and streamlining processes.
Sorting requirements. The sorting requirements have been set by the project are: • Sorting of five different plastic fractions o PET bottles; o Mono-layer PET trays; o HDPE bottles; o PP rigids and flexibles; and o LDPE film. • Materal loss <20%; precision in sorting >95% • PE film and PP film with rejects <5% • Final reject fraction will present <7% PET, <6% rigid PE and < 8% PP-PE films • Presence of biodegradables and PVC in sorted fractions <0.3% Recovering these fractions will ensure all valuable material is recovered and it should be able to be used by the end users (Armacell, Derbigum, CRF, ▇▇▇▇ and Interval)
Sorting requirements. The waste from all three cities will vary, however the sorting requirements will remain broadly the same. The criteria in terms of recovery and purity have been set by the project as 80% and 95% respectively. The products to be recovered from the post-consumer packaging waste for the Plasticircle project are given in Table 5. Sorted fractions End user Notes PET bottles Armacell CRF Ideally PET thermoforms should be removed from the bottle fraction, even mono-PET thermoforms. If it is not possible to develop the Picvisa technology to identify PET thermoforms Non-bottle mono-layer PET CRF Material not suitable for Armacell, validation for CRF is ongoing. May not be feasible to sort the non-bottle material using Picvisa sorters HDPE Derbigum ▇▇▇▇ Rigid HDPE from bottles. Can increase material value outside of investigated applications by recovering the natural (clear) material PP Derbigum ▇▇▇▇ CRF Can be rigid and flexible LDPE film Interval ▇▇▇▇ Will be material that has been screened at 300 mm to ensure film is largely LDPE, although some HDPE will be present In order to achieve the required purity and recovery set out in the project, material will first need to be pre-sorted to remove metals, glass and fines. Once sorted the material must be screened at 300 mm, as is common for this material. The >300 mm and <300 mm will then be sorted using NIR sorting. An example of how to do this with the end users identified is given in Figure 3 below. NIR NIR HDPE PET bottle PE film Waste Waste Waste Waste Packaging collection Pre-sort > 300 mm material Waste Red Interval Orange ▇▇▇▇ Yellow Derbigum Green CRF Purple Armacell
Sorting requirements explains that, even though the waste from all three pilot cities varied in type and quantity, the sorting requirements remained broadly the same. The criteria in terms of recovery and purity have been set by the project as 80% and 95% respectively. In order to achieve the required purity and recovery set out in the project, material will first need to be pre-sorted to remove metals, glass and fines. Once sorted the material must be screened at 300 mm, as is common for this material. A special focus is offered to the stages of material feeding, identification and ejection. All the details about the sorting technical process can be found here.

Related to Sorting requirements

  • Reporting Requirements The Company, during the period when the Prospectus is required to be delivered under the 1933 Act or the 1934 Act, will file all documents required to be filed with the Commission pursuant to the 1934 Act within the time periods required by the 1934 Act and the 1934 Act Regulations.

  • Testing Requirements 12.1. Workplaces - 12.2. On workplaces where the value of the Commonwealth’s contribution to the project that includes the building work is at least $5,000,000, and represents at least 50% of the total construction project value or the Commonwealth’s contribution to the project that includes the building work is at least $10,000,000 (irrespective of its proportion of the total construction project value) the following minimum testing requirements must be adhered to.

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • Posting Requirements Owner shall post the Development Security in accordance with the following terms and conditions: (i) Owner shall post the Development Security simultaneously with Owner’s execution and delivery of this Agreement; (ii) The Development Security must be in the form of cash or a Letter of Credit, substantially in the form of Exhibit N; and (iii) The Development Security and any interest accrued thereon in accordance with Section 7.3(a) shall be held by CHGE as security for Owner’s obligations under this Agreement, including achieving the Commercial Operation Date on or before the Guaranteed Commercial Operation Deadline.

  • Bonding Requirements The Contractor is required to furnish a performance bond on the form in a form acceptable to the City, in a sum of not less than [insert bonding level] of the annual amount of the contract to guarantee the faithful performance of this contract. The bond must be approved as to sufficiency and qualifications of the surety by the Controller.