Sources Furnished by the Department. Sources furnished by the Department will be made available to the Design-Builder together with the right to use such property as may be required for a plant site, stockpiles, and haul roads. The Design-Builder shall confine his Excavation operations to those areas of the property specified in the Contract. The Design-Builder shall be responsible for Excavation that shall be performed in order to furnish the specified Material.
Appears in 4 contracts
Sources: Lump Sum Design Build Agreement, Lump Sum Design Build Agreement, Lump Sum Design Build Agreement
Sources Furnished by the Department. Sources furnished by the Department will be made available to the Design-Builder together with the right to use such property as may be required for a plant site, stockpiles, and haul roads. The Design-Builder shall confine his Excavation operations to those areas of the property specified in the Contract. The Design-Builder shall be responsible for Excavation that shall be performed in order to furnish the specified Material.
Appears in 1 contract
Sources: Lump Sum Design Build Agreement