SPACECRAFT LAUNCH DATE Clause Samples

The SPACECRAFT LAUNCH DATE clause establishes the specific date or time frame when a spacecraft is scheduled to be launched. This clause typically outlines the agreed-upon launch window, any conditions that may affect the timing, and the responsibilities of the parties if delays or rescheduling occur. By clearly defining when the launch is to take place, this clause ensures both parties have a mutual understanding of the project timeline and helps prevent disputes related to scheduling or delivery obligations.
SPACECRAFT LAUNCH DATE. 9 ARTICLE 8.
SPACECRAFT LAUNCH DATE. 7.1 This Contract is written on the basis that one (1) flight Spacecraft supplied hereunder will be Launched as specified below: Spacecraft Launch Vehicle Launch Period ---------- -------------- ------------- Galaxy ▇▇▇▇-▇ ▇▇▇▇▇ ▇▇-▇▇ ▇▇▇▇ ▇▇ Apr 97 - 31 May 97 The Buyer shall notify Contractor of the specific Launch Date no later than sixteen (16) weeks prior to the selected Launch Date. 7.2 The price set forth in Paragraph 5.1 includes Contractor furnished Launch Support Services, Post Launch Support Services, and In-orbit Test Support Services. The price set forth in Paragraph 5.1 assumes the launch of the Spacecraft on an Atlas II-As Blk1 launch vehicle within twenty-eight (28) calendar days after delivery of the Spacecraft to the Launch Site. 7.3 No less than sixteen (16) weeks prior to the launch date, Buyer shall order Contractor by notice in writing to commence launch campaign preparations including, but not limited to, reserving ground, air or marine transportation for hardware shipment to the Launch Site, installing necessary communications links to the Launch Site, etc. 7.4 If the Spacecraft launch date defined in Paragraph 7.1 is postponed for any reason other than the sole fault of Contractor, excluding any postponement due to an Excusable Delay as defined in Article 12, the Parties shall negotiate in good faith to determine an equitable adjustment to the price and affected terms of this Contract, if any. If the cost of supplies or materials made obsolete or excess as a result of a such postponement is included in the equitable adjustment, HCG shall have the right to prescribe the manner of disposition of such supplies or materials. Costs included in the equitable adjustment shall include but not be limited to; support personnel standby; extra travel expenses; transport termination or rescheduling fees; and installation/de-installation of communication links to the Launch Site and a profit rate of ****************** or such other profit rate designated in writing by the Chief Financial Officer of the ▇▇▇▇▇▇ Space and Telecommunications Company (or then existing equivalent) for the applicable expenses. 7.5 Notwithstanding the foregoing, if the Spacecraft launch date defined in Paragraph 7.1 is postponed by either Party due to an Excusable Delay, as defined in Paragraph 12.1 herein, the terms of Article 12 herein shall govern such postponement. REDACTED CONFIDENTIAL TREATMENT REQUESTED -------------------------------- The asterisked portions of ...
SPACECRAFT LAUNCH DATE. 7.1 This Contract is written on the basis that one (1) Spacecraft supplied hereunder will be Launched on an Delta III launch vehicle within the Launch Period set forth below and within which a slot, date and window shall be established in accordance with Paragraphs 7.1.1, 7.1.2, and 7.1.3 below: Spacecraft Launch Vehicle Launch Period ---------- -------------- ------------- Galaxy X Delta III 01 April-30 June 1998 (inclusive)
SPACECRAFT LAUNCH DATE. 14 ARTICLE 8. BUYER-FURNISHED ITEMS............................................16
SPACECRAFT LAUNCH DATE. 7.1 This Contract is written on the basis that one (1) Spacecraft supplied hereunder will be Launched on a Sea Launch (Zenit) vehicle within the Launch Period set forth below and within which a slot, date and window shall be established in accordance with Paragraphs 7.1.1, 7.1.2, and 7.1.3 below: Spacecraft Launch Vehicle Launch Period ---------- -------------- ------------- Galaxy XI Sea Launch 01 June-01 September 1998 (Zenit)
SPACECRAFT LAUNCH DATE 

Related to SPACECRAFT LAUNCH DATE

  • Project/Milestones Taxpayer provides refrigerated warehousing and logistic distribution services to clients throughout the United States. In consideration for the Credit, Taxpayer agrees to invest in a new refrigeration and distribution facility in the ▇▇▇▇▇▇▇▇▇ Park area of Sacramento, California, and hire full-time employees (collectively, the “Project”). Further, Taxpayer agrees to satisfy the milestones as described in Exhibit A (“Milestones”) and must maintain Milestones for a minimum of three (3) taxable years thereafter. In the event Taxpayer employs more than the number of full-time employees, determined on an annual full-time equivalent basis, than required in Exhibit A, for purposes of satisfying the “Minimum Annual Salary of California Full-time Employees Hired” and the “Cumulative Average Annual Salary of California Full-time Employees Hired,” Taxpayer may use the salaries of any of the full-time employees hired within the required time period. For purposes of calculating the “Minimum Annual Salary of California Full-time Employees Hired” and the “Cumulative Average Annual Salary of California Full-time Employees Hired,” the salary of any full-time employee that is not employed by Taxpayer for the entire taxable year shall be annualized. In addition, the salary of any full-time employee hired to fill a vacated position in which a full-time employee was employed during Taxpayer’s Base Year shall be disregarded.

  • Milestone Schedule Please state the status and progress of each Milestone and identify any completed Milestone(s) for the previous calendar quarter.

  • Stop Work Order (a) NYSERDA may at any time, by written Order to the Contractor, require the Contractor to stop all or any part of the Work called for by this Agreement for a period of up to ninety (90) days after the Stop Work Order is delivered to the Contractor, and for any further period to which the parties may agree. Any such order shall be specifically identified as a Stop Work Order issued pursuant to this Section. Upon receipt of such an Order, the Contractor shall forthwith comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the Work covered by the Order during the period of work stoppage consistent with public health and safety. Within a period of ninety (90) days after a Stop Work Order is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, NYSERDA shall either: (i) by written notice to the Contractor, cancel the Stop Work Order, which shall be effective as provided in such cancellation notice, or if not specified therein, upon receipt by the Contractor, or (ii) terminate the Work covered by such order as provided in the Termination Section of this Agreement. (b) If a Stop Work Order issued under this Section is cancelled or the period of the Order or any extension thereof expires, the Contractor shall resume Work. An equitable adjustment shall be made in the delivery schedule, the estimated cost, the fee, if any, or a combination thereof, and in any other provisions of the Agreement that may be affected, and the Agreement shall be modified in writing accordingly, if: (i) the Stop Work Order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this Agreement, and (ii) the Contractor asserts a claim for such adjustments within 30 days after the end of the period of Work stoppage; provided that, if NYSERDA decides the facts justify such action, NYSERDA may receive and act upon any such claim asserted at any time prior to final payment under this Agreement. (c) If a Stop Work Order is not cancelled and the Work covered by such Order is terminated, the reasonable costs resulting from the Stop Work Order shall be allowed by equitable adjustment or otherwise. (d) Notwithstanding the provisions of this Section 12.01, the maximum amount payable by NYSERDA to the Contractor pursuant to this Section 12.01 shall not be increased or deemed to be increased except by specific written amendment hereto.

  • Commercial Milestones (a) Within [*****] calendar days after the end of the first Calendar Year in which aggregate annual Net Sales for that Calendar Year for the Licensed Product in the Territory reach any threshold indicated in the Commercial Milestone Events listed below, EverInsight shall notify VistaGen of the achievement of such Commercial Milestone Event and VistaGen shall invoice EverInsight for the corresponding non-refundable, non-creditable Milestone Payment set forth below and EverInsight shall remit payment to VistaGen within [*****] Business Days after the receipt of the invoice, as described in Section 8.6 (Currency; Exchange Rate; Payments). Annual Net Sales Milestones for Licensed Product Milestone Payments (in Dollars) (each a “Commercial Milestone Event”): (1). [*****] (2). [*****] (3). [*****] (4). [*****] (5). [*****] (b) For the purposes of determining whether a Net Sales Milestone Event has been achieved, Net Sales of Licensed Product(s) in the Territory shall be aggregated. For clarity, the annual Net Sales Milestone Payments set forth in this Section 8.3 (Commercial Milestones) shall be payable only once, upon the first achievement of the applicable Commercial Milestone Event, regardless of how many times such Commercial Milestone Event is achieved. (c) If a Commercial Milestone Event in Section 8.3 (Commercial Milestones) is achieved and payment with respect to any previous Commercial Milestone Event in Section 8.3 has not been made, then such previous Commercial Milestone Event shall be deemed achieved and EverInsight shall notify VistaGen within fifteen (15) calendar days of such achievement. VistaGen shall then invoice EverInsight for such unpaid previous Commercial Milestone Event(s) and EverInsight shall pay VistaGen such unpaid previous milestone payment(s) within thirty (30) Business Days of receipt of such invoice. (d) In the event that, VistaGen believes any Commercial Milestone Event under Section 8.3(a) has occurred but EverInsight has not given VistaGen the notice of the achievement of such Commercial Milestone Event, it shall so notify EverInsight in writing and shall provide to EverInsight data, documentation or other information that supports its belief. Any dispute under this Section 8.3(d) (Commercial Milestones - subsection (d)) that relates to whether or not a Commercial Milestone Event has occurred shall be referred to the JSC to be resolved in accordance with ARTICLE 3 (Governance) and shall be subject to resolution in accordance with Section 14.10 (Dispute Resolution). The Milestone Payments made for each Commercial Milestone Event shall be non-creditable and non-refundable.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.