STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by SfL+a Architects dated June 6, 2018 for ▇▇▇▇▇ County Board of Education, including the following addenda: Addendum #1 – June 25, 2018 – 58 pages Addendum #2 – July 2, 2018 – 63 pages Addendum #3 – July 9, 2018 – 73 pages 2.2 The Parties agree that the Project shall include the following alternates: Alternate 2A - $0 Alternate 2B - $0 Alternate 2C - $0 Alternate 2D - $0 Alternate 2E- $0 Alternate 3A - $4,400 Alternate 3B - $3,000 Alternate 3C - $0 Alternate 4 - $0 Alternate 5 - $73,000 Alternate 7 - $0 Alternate 8 - $0 Alternate 9 - $0 Alternate 10 - $17,440 Alternate 12 - ($37,820) Alternate 13 - ($18,000) Alternate 14 - ($12,000) 2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: • Delete landscaping irrigation between the building wings: ($5,400) • Reduce unsuitable soil (trenching) allowance from 500 cy to 250 cy: ($3,750) • Reduce unsuitable soil (bulk) allowance from 1000 cy to 500 cy: ($3,750) • Revise height of perimeter fence from 6’ to 4’: ($8,460) • At Pre-K and Kindergarten outdoor exploratory area, revise fence from brick and aluminum to vinyl coated 4’ high chain link fence, maintain dense landscaping to obscure view: ($13,000) • Reduce the size of the service yard eliminating the propane tanks and paving: ($8,228) • Delete low wall at flagpole: ($4,500) • Delete four picnic tables, purchase at later time with FF&E: ($3,115) • Delete brick pavers at drop off and use control joints to create the pattern: ($2,500) • Revise wood door finish from rift cut oak to plain sawn oak: ($3,600) • Revise brick pilasters in corridor to painted 4” concrete masonry units with bullnose ends: ($26,850) • Change from 7 colors of terrazzo to 6 colors: ($5,200) • Reduce warranty period for terrazzo from 15-years to 3-years: ($10,800) • Revise ruffled brick accent to patterned utility brick: ($12,500) • Delete redundant water heater WH2: ($12,600) • Revise above slab piping from cast iron to solid PVC: ($34,650) • Revise grease interceptor from polypropylene to cast concrete with epoxy coating: ($15,120) • Revise energy recovery unit to allow AAON equipment: ($47,200) • Remove canvas wrap at vertical stacks on water source heat pumps and energy recovery units: ($8,200) • Direct bury main electrical to within 20’ from the building exterior wall: ($7,200) • Revise from 4 electrical circuits per classroom to 3 circuits and reduce size of electrical panels: ($10,800) • Delete allowance for additional trenching for (2) 6” conduit and for (2) 4” conduit: ($10,620) • Delete scope of work for structured cabling and patch panels, bid with technology package at later time – ($140,500) • Delete scope of work for intrusion detection system, bid with technology package at later time – ($19,440) • Delete scope of work for intercom, bid with technology package at later time – ($63,000) • Remove conduit from fire alarm wiring when in concealed spaces – ($25,200) • The total for the items noted above is ($506,183) 2.4 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents. 2.5 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".
Appears in 1 contract
Sources: Owner Contractor Agreement
STATEMENT OF THE WORK. 2.1 The Project is the Work identified in the plans and specifications prepared by SfL+a Architects dated June 6January 21, 2018 2019 for ▇▇▇▇▇ Moore County Board of Education, including the following addenda: Addendum #1 – June 251, 2018 – 58 pages dated February 8, 2019 Addendum #2 – July 2, 2018 – 63 pages Addendum #3 – July 9dated February 19, 2018 – 73 pages2019
2.2 The Parties agree that the Project shall include the following alternates: Alternate 2A - $0 Alternate 2B - $0 Alternate 2C - $0 Alternate 2D - $0 Alternate 2E- $0 Alternate 3A - $4,400 Alternate 3B - $3,000 Alternate 3C - $0 Alternate 4 - $0 Alternate 5 - $73,000 0 Alternate 7 - $0 Alternate 8 - $0 Alternate 9 - $0 Alternate 10 - $17,440 10,000 Alternate 12 - ($37,82017,000) Alternate 13 - ($18,000) Alternate 14 - ($12,000)
2.3 The Parties agree to the following modifications to the Project’s plans and specifications, including the noted value engineering items: • Delete landscaping irrigation between the building wings: Reduce in-project allowance by $100,000 leaving $300,000 • Change stormwater pipe from Class 4 to Class 3 – ($5,40035,000) • Reduce unsuitable soil (trenching) allowance from 500 cy to 250 cy: Eliminate the learning commons on the lower level - ($3,750150,946) • Reduce unsuitable soil (bulk) allowance from 1000 cy to 500 cy: Substitute plain sawn red oak doors for rift cut red oak doors – ($3,7506,900) • Revise height of perimeter fence from 6’ to 4’: Substitute sand based mortar for colored mortar – ($8,460) • At Pre-K and Kindergarten outdoor exploratory area, revise fence from brick and aluminum to vinyl coated 4’ high chain link fence, maintain dense landscaping to obscure view: ($13,000) • Reduce the size of the service yard eliminating the propane tanks and paving: ($8,228) • Delete low wall at flagpole: ($4,500) • Delete four picnic tables, purchase at later time with FF&E: ($3,115) • Delete brick pavers at drop off and use control joints to create the pattern: ($2,500) • Revise wood door finish from rift cut oak to plain sawn oak: ($3,60022,000) • Revise brick pilasters in corridor Patter to painted 4” concrete masonry units with bullnose ends: running bond – ($26,850100,000) • Change from 7 colors of terrazzo to 6 colors: Remove corridor built-in benches – ($5,20025,600) • Reduce warranty period for For terrazzo from 15-years to 3-years: pattern TZ-1 use local marble – ($10,80081,200) • Revise ruffled brick accent to patterned utility brick: ($12,500) • Delete redundant water heater WH2: Provide Alsco aluminum soffits in 0.19 thickness – ($12,600) • Revise above slab piping from cast iron to solid PVC: Remove Sika coating in the kitchen area – ($34,6503,831) • Revise grease interceptor from polypropylene 4" half-high CMU in Gym and Corridors to cast concrete with epoxy coating: 4" full height – ($15,12023,000) • Remove dishwasher duct – ($3,000) • Revise energy recovery unit requirements for SZVAV and dual point power on WSHP 301, 501, 503, 508A and 508B to allow AAON equipment: 2-speed fan and single power – ($47,20017,000) • Remove canvas wrap Substitute polymer pans for stainless steel pans at vertical stacks on water source heat pumps and energy recovery units: all WSHP – ($8,200) • Direct bury main electrical to within 20’ from the building exterior wall: ($7,2005,000) • Revise from 4 electrical circuits per classroom to 3 circuits and reduce size of electrical panels: ($10,800) • Delete allowance for additional trenching for (2) 6” conduit and for (2) 4” conduit: ($10,620) • Delete scope of work for structured cabling and patch panels, bid with technology package at later time lighting fixtures as proposed by other manufacturers – ($140,500) • Delete scope of work for intrusion detection system, bid with technology package at later time – ($19,440) • Delete scope of work for intercom, bid with technology package at later time – ($63,000) • Remove conduit from fire alarm wiring when in concealed spaces – ($25,20068,000) • The total for the above noted items noted above is ($506,183654,077)
2.4 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents.
2.5 The Contractor shall further provide and pay for all related facilities described in any of the Contract Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the contractor by this Article and by all other provisions of the Contract Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the "Work".