Storage and Placement Sample Clauses

The Storage and Placement clause defines the rules and responsibilities regarding where and how goods, materials, or equipment are to be stored and positioned during the course of a project or contract. It typically specifies designated storage areas, conditions for safe and secure placement, and may outline requirements for labeling, access, or protection from damage. By clearly establishing these procedures, the clause helps prevent disputes over property handling, ensures safety and organization on site, and protects the integrity of stored items.
Storage and Placement. A) All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. B) No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless all of the following are met: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the contractor handling such materials against damage or injury caused by such materials. C) All materials required for the construction of the premises must comply with Building Standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord. D) All work shall be subject to supervision and inspection by Landlord’s Representative. E) No alterations to approved plans will be made without prior knowledge and approval of the Property Manager. Such changes shall be documented on the as-build drawings required to be delivered to Landlord pursuant to Paragraph 10 of the rules and regulations. F) All protective devices (e.g., temporary enclosures and partitions) and materials, as well as their placement, must be approved by the Property Manager. G) It is the responsibility of Contractors to ensure that the temporary placement of materials does not impose a hazard to the Building or its occupants, either through overloading, or interference with Building systems, access, egress or in any other manner whatsoever. H) All existing and/or new openings made through the floor slab for piping, cabling, etc. must be sealed per code. All holes in the floor slab at abandoned floor outlets, etc. need to be filled with solid concrete.
Storage and Placement. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises.
Storage and Placement a. All construction materials shall be stored only in the premises where they are to be installed. No storage of materials will be permitted in any public areas, loading docks or corridors leading to the premises. b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless: (i) authorized by the Property Manager, (ii) all applicable laws, ordinances, rules and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions shall be taken by the Contractor handling such materials against damage or injury caused by such materials. c. All materials required for the construction of the premises must comply with Building standards, must conform with the plans and specifications approved by Landlord, and must be installed in the locations shown on the drawings approved by the Landlord.
Storage and Placement a. All construction materials to be stored only in the premises where they are to be installed. No storage or staging of materials will be permitted in public areas, loading docks, corridors leading to the premises or any other portion of the Building or Property other than the premises in which such materials will be installed. b. No flammable, toxic, or otherwise hazardous materials may be brought in or about the Building unless: (I) authorized by the Chief Engineer, (ii) all applicable laws, ordinances, rules, and regulations are complied with, and (iii) all necessary permits have been obtained. All necessary precautions will be taken by the Contractor or Vendor when handling such materials so to avoid damage or injury.

Related to Storage and Placement

  • Time and Place Unless this Agreement shall have been terminated pursuant to Section 2.06, and subject to the satisfaction or waiver of the conditions in Section 2.01, the closing of the contributions contemplated by Section 1.01 and the other transactions contemplated by this Agreement shall occur substantially concurrently with the receipt by the REIT of the proceeds from the Offering from the underwriters (the “Closing” or the “Closing Date”) in the order set forth on Exhibit F. The Closing shall take place at the offices of ▇▇▇▇▇▇ & ▇▇▇▇▇▇▇ LLP, ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ or such other place as determined by the REIT in its sole discretion.

  • Terms of Placement Warrants Each Placement Warrant shall have the terms set forth in the Warrant Agreement.

  • Order Placement To place orders for the Trustee to create or redeem one or more Baskets, Authorized Participants must follow the procedures for creation and redemption referred to in Section 3 of this Agreement and the procedures described in Attachment A hereto (the “Procedures”), as each may be amended, modified or supplemented from time to time.

  • Terms of the Units and Placement Warrants 8.1 The Units and their component parts are substantially identical to the units to be offered in the IPO except that: (i) the Units and component parts will be subject to transfer restrictions described in the Insider Letter, (ii) the Placement Warrants will be non-redeemable so long as they are held by the initial holder thereof (or any of its permitted transferees), and may be exercisable on a “cashless” basis if held by a Subscriber or its permitted transferees, as further described in the Warrant Agreement and (iii) the Units and component parts are being purchased pursuant to an exemption from the registration requirements of the Securities Act and will become freely tradable only after the expiration of the lockup described above in clause (i) and they are registered pursuant to the Registration Rights Agreement to be signed on or before the date of the Prospectus or an exemption from registration is available. 8.2 Subscriber agrees to vote the Placement Shares in accordance with the terms of the Insider Letter and as otherwise described in the Registration Statement.

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.