STRUCTURE EXCAVATION Sample Clauses

STRUCTURE EXCAVATION. Dimension, size, depth and all alignment of excavation shall be shown on plans and detail drawing. Excavated excess materials shall be hauled within free haul distance (500m radius).
STRUCTURE EXCAVATION. STRUCTURE EXCAVATION shall conform to Subsections 300-3, “STRUCTURE EXCAVATION AND BACKFILL,” of the STANDARD SPECIFICATIONS. All surplus excavated shall become the property of the CONTRACTOR and shall be disposed of outside of project right-of-way in accordance with all applicable codes and ordinances. STRUCTURAL EXCAVATION is required for bridge abutments, footings and piers. See Caltrans Standard Plan A62C for limits.
STRUCTURE EXCAVATION. ROCK (COMPLETE)
STRUCTURE EXCAVATION. EARTH (COMPLETE)
STRUCTURE EXCAVATION. The volume of excavation to be paid for will be the number of cubic metres measured in original position of material acceptably excavated in conformity with the Plans or as directed by the Engineer, but in no case, except as noted, will any of the following volumes be included in the measurement for payment: (1) The volume outside of vertical planes 450 mm (18 inches) outside of and parallel to the neat lines of footings and the inside walls of pipe and pipe-arch culverts at their widest horizontal dimensions. (2) The volume of excavation for culvert and sections outside the vertical plane for culverts stipulated in (1) above. (3) The volume outside of neat lines of underdrains as shown on the Plans, and outside the limits of foundation fill as ordered by the Engineer.

Related to STRUCTURE EXCAVATION

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Demolition The Lessor shall remove existing abandoned electric, telephone, and data cabling and devices, as well as any other improvements or fixtures in place, to accommodate the Government’s requirements. Any demolition of existing improvements that is necessary to satisfy the Government’s layout shall be done at the Lessor’s expense.