Common use of Subloop Intra-building Clause in Contracts

Subloop Intra-building. Network Cable 2.8.3.4.1 BellSouth will install the IAT within sixty (60) days after the submission of the SI or as mutually agreed to by the Parties. BellSouth shall install the IAT in properties identified by AT&T in a SI process. 2.8.3.4.2 Through the Service Inquiry (“SI”) process, BellSouth will determine whether access to USL-INC at the location requested by AT&T is technically feasible and whether sufficient capacity exists in the cross-box. If existing capacity is sufficient to meet AT&T’s request, then BellSouth will perform the set-up as described in the section that follows. Where access to the cross box is infeasible, BellSouth will notify AT&T in writing within five (5) to seven (7) business days through the SI process. Where modifications are necessary to permit access to the cross box, the Parties will work cooperatively to assess the applicability of special construction charges. If the Parties cannot agree regarding such charges, the Parties will escalate to the appropriate level of management or seek resolution pursuant to the dispute resolution process section of the General Terms and Conditions of this Agreement. 2.8.3.4.3 If the ECD reaches jeopardy status and BellSouth is unable to complete the installation and provide access by the ECD, BellSouth will immediately notify AT&T of such status and negotiate a revised ECD. 2.8.3.4.4 BellSouth shall notify AT&T of the ECD for installation of the IATs and access to the USL-INC pairs and will commence installation of the IATs. In the event BellSouth cannot meet the ECDs set forth in this Attachment BellSouth will notify AT&T in writing via the SI process, BellSouth and AT&T will work cooperatively to establish a mutually agreeable installation date on an individual case basis to accommodate the layout of the property, number of terminals to be installed, condition of the property, or availability of IAT equipment. 2.8.3.4.5 BellSouth will install a cross connect panel in the building equipment room for the purpose of accessing USL-INC pairs from a building equipment room. The cross- connect panel will function as a SPOI for USL-INC and will be accessible by multiple carriers as space permits. BellSouth will place cross-connect blocks in 25-pair increments for AT&T’s use on this ct panel. AT&T will be responsible for connecting its facilities to the 25-pair cross-connect block(s). 2.8.3.4.6 The site set-up must be completed before AT&T can order subloop pairs. For the site set-up in a BellSouth cross-connect box in the field, BellSouth will perform the necessary work to splice AT&T’s cable into the crossconnect box. For the site set-up inside a building equipment room, BellSouth will perform the necessary work to install the cross-connect panel and the connecting block(s) that will be used to provide access to the requested USLs. 2.8.3.4.7 Once the site set-up is complete, AT&T will request subloop pairs through submission of a LSR form to the LCSC. For expedite requests by AT&T for subloop pairs, expedite charges will apply for intervals less than 5 days. 2.8.3.4.8 Unbundled Subloops will be provided in accordance with the applicable industry standards.

Appears in 1 contract

Sources: Interconnection Agreement

Subloop Intra-building. Network Cable 2.8.3.4.1 BellSouth will install the IAT within sixty (60) days after the submission of the SI or as mutually agreed to by the Parties. BellSouth shall install the IAT in properties identified by AT&T AND TC SYSTEMS in a SI process. 2.8.3.4.2 Through the Service Inquiry (“SI”) process, BellSouth will determine whether access to USL-INC at the location requested by AT&T AND TC SYSTEMS is technically feasible and whether sufficient capacity exists in the cross-box. If existing capacity is sufficient to meet AT&TAT&T AND TC SYSTEMS’s request, then BellSouth will perform the set-up as described in the section that follows. Where access to the cross box is infeasible, BellSouth will notify AT&T AND TC SYSTEMS in writing within five (5) to seven (7) business days through the SI process. Where modifications are necessary to permit access to the cross box, the Parties will work cooperatively to assess the applicability of special construction charges. If the Parties cannot agree regarding such charges, the Parties will escalate to the appropriate level of management or seek resolution pursuant to the dispute resolution process section of the General Terms and Conditions of this Agreement. 2.8.3.4.3 If the ECD reaches jeopardy status and BellSouth is unable to complete the installation and provide access by the ECD, BellSouth will immediately notify AT&T AND TC SYSTEMS of such status and negotiate a revised ECD. 2.8.3.4.4 BellSouth shall notify AT&T AND TC SYSTEMS of the ECD for installation of the IATs and access to the USL-INC pairs and will commence installation of the IATs. In the event BellSouth cannot meet the ECDs set forth in this Attachment BellSouth will notify AT&T AND TC SYSTEMS in writing via the SI process, BellSouth and AT&T AND TC SYSTEMS will work cooperatively to establish a mutually agreeable installation date on an individual case basis to accommodate the layout of the property, number of terminals to be installed, condition of the property, or availability of IAT equipment. 2.8.3.4.5 BellSouth will install a cross connect panel in the building equipment room for the purpose of accessing USL-INC pairs from a building equipment room. The cross- connect panel will function as a SPOI for USL-INC and will be accessible by multiple carriers as space permits. BellSouth will place cross-connect blocks in 25-pair increments for AT&TAT&T AND TC SYSTEMS’s use on this ct panel. AT&T AND TC SYSTEMS will be responsible for connecting its facilities to the 25-pair cross-connect block(s). 2.8.3.4.6 The site set-up must be completed before AT&T AND TC SYSTEMS can order subloop pairs. For the site set-up in a BellSouth cross-connect box in the field, BellSouth will perform the necessary work to splice AT&TAT&T AND TC SYSTEMS’s cable into the crossconnect box. For the site set-up inside a building equipment room, BellSouth will perform the necessary work to install the cross-connect panel and the connecting block(s) that will be used to provide access to the requested USLs. 2.8.3.4.7 Once the site set-up is complete, AT&T AND TC SYSTEMS will request subloop pairs through submission of a LSR form to the LCSC. For expedite requests by AT&T AND TC SYSTEMS for subloop pairs, expedite charges will apply for intervals less than 5 days. 2.8.3.4.8 Unbundled Subloops will be provided in accordance with the applicable industry standards.

Appears in 1 contract

Sources: Interconnection Agreement

Subloop Intra-building. Network Cable 2.8.3.4.1 BellSouth will install the IAT within sixty (60) days after the submission of the SI or as mutually agreed to by the Parties. BellSouth shall install the IAT in properties identified by AT&T TCG in a SI process. 2.8.3.4.2 Through the Service Inquiry (“SI”) process, BellSouth will determine whether access to USL-INC at the location requested by AT&T TCG is technically feasible and whether sufficient capacity exists in the cross-box. If existing capacity is sufficient to meet AT&TTCG’s request, then BellSouth will perform the set-up as described in the section that follows. Where access to the cross box is infeasible, BellSouth will notify AT&T TCG in writing within five (5) to seven (7) business days through the SI process. Where modifications are necessary to permit access to the cross box, the Parties will work cooperatively to assess the applicability of special construction charges. If the Parties cannot agree regarding such charges, the Parties will escalate to the appropriate level of management or seek resolution pursuant to the dispute resolution process section of the General Terms and Conditions of this Agreement. 2.8.3.4.3 If the ECD reaches jeopardy status and BellSouth is unable to complete the installation and provide access by the ECD, BellSouth will immediately notify AT&T TCG of such status and negotiate a revised ECD. 2.8.3.4.4 BellSouth shall notify AT&T TCG of the ECD for installation of the IATs and access to the USL-INC pairs and will commence installation of the IATs. In the event BellSouth cannot meet the ECDs set forth in this Attachment BellSouth will notify AT&T TCG in writing via the SI process, BellSouth and AT&T TCG will work cooperatively to establish a mutually agreeable installation date on an individual case basis to accommodate the layout of the property, number of terminals to be installed, condition of the property, or availability of IAT equipment. 2.8.3.4.5 BellSouth will install a cross connect panel in the building equipment room for the purpose of accessing USL-INC pairs from a building equipment room. The cross- connect panel will function as a SPOI for USL-INC and will be accessible by multiple carriers as space permits. BellSouth will place cross-connect blocks in 25-pair increments for AT&TTCG’s use on this ct panel. AT&T TCG will be responsible for connecting its facilities to the 25-pair cross-connect block(s). 2.8.3.4.6 The site set-up must be completed before AT&T TCG can order subloop pairs. For the site set-up in a BellSouth cross-connect box in the field, BellSouth will perform the necessary work to splice AT&TTCG’s cable into the crossconnect box. For the site set-up inside a building equipment room, BellSouth will perform the necessary work to install the cross-connect panel and the connecting block(s) that will be used to provide access to the requested USLs. 2.8.3.4.7 Once the site set-up is complete, AT&T TCG will request subloop pairs through submission of a LSR form to the LCSC. For expedite requests by AT&T TCG for subloop pairs, expedite charges will apply for intervals less than 5 days. 2.8.3.4.8 Unbundled Subloops will be provided in accordance with the applicable industry standards.

Appears in 1 contract

Sources: Interconnection Agreement