Common use of Subsurface and Physical Conditions Clause in Contracts

Subsurface and Physical Conditions. A. The Supplementary Conditions identify: 1. Those reports known to OPT of explorations and tests of subsurface conditions at or adjacent to the Site; 2. Those drawings known to OPT of physical conditions related to existing surface or subsurface structures at the Site, except Underground Facilities; and 3. Technical Data contained in these reports and drawings. B. Data contained in boring logs, recorded measurements of subsurface water levels, and the results of tests performed on materials described in geotechnical data reports specifically prepared for the Project and made available to Contractor are defined as Technical Data, unless Technical Data has been defined more specifically in the Supplementary Conditions. C. Contractor may rely upon the accuracy of the Technical Data contained in these reports and drawings, but these reports and drawings are not Contract Documents. Except for this reliance on Technical Data, Contractor may not rely upon or make claims against Owner’s Indemnitees with respect to: 1. The completeness of reports and drawings for Contractor’s purposes, including aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, or Contractor’s safety precautions and programs; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Contractor’s interpretation of or conclusions drawn from Technical Data or other data, interpretations, opinions, or information.

Appears in 2 contracts

Sources: Facilities Multiple Award Contract (Fmac) Master Agreement, Facilities Multiple Award Contract (Fmac) Master Agreement