Survey Requirements. 1 Establish two permanent bench marks on site, referenced to established bench marks by survey control points. Record locations, with horizontal and vertical data in Project Record Documents. .2 Establish lines and levels, locate and lay out, by instrumentation. .3 Stake for grading, fill and topsoil placement and landscaping features. .4 Stake slopes and berms. .5 Establish pipe invert elevations. .6 Stake batter boards for foundations. .7 Establish foundation column locations and floor elevations. .8 Establish lines and levels for mechanical and electrical work.
Appears in 1 contract
Sources: Construction Contract
Survey Requirements. 1 Establish two permanent bench marks on siteSite, referenced to established bench marks by survey control points. Record locations, with horizontal and vertical data in Project Record Documents. .2 Establish lines and levels, locate and lay out, by instrumentation. .3 Stake for grading, fill and topsoil placement and landscaping features. .4 Stake slopes and berms. .5 Establish pipe invert elevations. .6 Stake batter boards for foundations. .7 Establish foundation column locations and floor elevations. .8 Establish lines and levels for mechanical and electrical work.
Appears in 1 contract
Sources: Construction Contract