Surveying and Testing. (a) The Design Consultant shall obtain all necessary surveying, tests and reports to properly design and administer the construction of the Project, including, but not limited to, soils and hazardous materials testing. The Design Consultant shall be responsible for the accuracy, adequacy and content of such tests, surveying and reports. (b) The Design Consultant and its appropriate subconsultant shall review all survey and test results reports and shall follow the recommendation of the soils engineer or other subconsultant unless, in the exercise of appropriate professional judgment, the Design Consultant or appropriate subconsultant discovers, or should in the exercise of professional judgment discover, factors indicating the report or results are not reliable. (c) If any such inadequacy or any inconsistency, based upon such exercise of professional judgment, is noted the Design Consultant and/or its appropriate subconsultant shall report such inconsistency or inadequacy promptly to the City and require such inadequacy or inconsistency to be addressed by the soils engineer, testing laboratory or land surveyor before any further use is put to the data. (d) The Design Consultant shall require all surveying, engineering and testing entities it selects to carry and maintain Comprehensive Auto Liability and Property Damage Insurance, General Commercial Liability and Property Damage Insurance and Professional Liability Errors and Omissions coverage as required by the City’s Office of Risk Management which will adequately protect the interests of the City and third parties from the acts and omissions of the testing entity. (e) The amount of surveying or testing, the cost, and the types of reports required must be approved by the Director prior to the Design Consultant actually ordering any such work to be accomplished. Such approvals by the City shall be for purposes of compensation only and shall not relieve the Design Consultant of any responsibility for determining the scope and amount of surveying and testing necessary for the design of the Project. (f) It is understood and agreed that this Agreement does not include the investigation, sampling, testing, planning, abatement design, and remediation management of asbestos or other hazardous waste material. Should the presence of asbestos or other hazardous waste material be known to exist on the Project or if the Design Consultant shall observe the presence of asbestos or hazardous waste material on the Project site during its performance of services under this Agreement, the Design Consultant shall notify the City in writing immediately.

Appears in 1 contract

Sources: Architectural & Engineering Design Services Agreement

Surveying and Testing. (a) The Design Consultant shall obtain all necessary surveying, tests and reports to properly design and administer the construction of the Projecteach project, including, but not limited to, soils and hazardous materials testing. The Design Consultant shall be responsible for the accuracy, adequacy and content of such tests, surveying and reports. (b) The Design Consultant and its appropriate subconsultant shall review all survey and test results reports and shall follow the recommendation of the soils engineer or other subconsultant unless, in the exercise of appropriate professional judgment, the Design Consultant or appropriate subconsultant discovers, or should in the exercise of professional judgment discover, factors indicating the report or results are not reliable. (c) If any such inadequacy or any inconsistency, based upon such exercise of professional judgment, is noted the Design Consultant and/or its appropriate subconsultant shall report such inconsistency or inadequacy promptly to of the City and require such inadequacy or inconsistency to be addressed by the soils engineer, testing laboratory or land surveyor before any further use is put to the data. (d) The Design Consultant shall require all surveying, engineering and testing entities it selects to carry and maintain Comprehensive Auto Liability and Property Damage Insurance, General Commercial Liability and Property Damage Insurance and Professional Liability Errors and Omissions coverage as required by the City’s 's Office of Risk Management which will adequately protect the interests of the City and third parties from the acts and omissions of the testing entity. (e) The amount of surveying or testing, the cost, and the types of reports required must be approved by the Director Manager prior to the Design Consultant actually ordering any such work to be accomplished. Such approvals by the City shall be for purposes of compensation only and shall not relieve the Design Consultant of any responsibility for determining the scope and amount of surveying and testing necessary for the design of the Projectproject. (f) It is understood and agreed that this Agreement does not include the investigation, sampling, testing, planning, abatement design, and remediation management of asbestos or other hazardous waste material. Should the presence of asbestos or other hazardous waste material be known to exist on the Project a specific project or if the Design Consultant shall observe the presence of asbestos or hazardous waste material on the Project any project site during its performance of services under this Agreement, the Design Consultant shall notify the City in writing immediately. (g) Payment to the Design Consultant for such surveying, testing, and abatement shall not exceed the surveying and testing budget set forth in the project specific proposal for each project.

Appears in 1 contract

Sources: Design Services Agreement