Common use of System Design Clause in Contracts

System Design. The Contractor shall design, develop, and document the new OC Livescans to satisfy the requirements of this SOW. The Contractor shall design, develop, and fabricate or procure all hardware, software, and data components of the system(s), with the exception of the operational data to be provided by OCCL. The Contractor shall, to the maximum extent feasible, use non-proprietary hardware and software in developing and implementing the system. To the maximum extent feasible, the equipment shall be available commercially from third party vendors as well as through the Contractor. The Contractor shall develop and maintain the Requirements Verification Traceability Matrix (Deliverable OC-23) to map the requirements in this Scope of Work to the OC Livescan System Design Specification and the FAT and SAT Test Procedures. The Contractor shall develop the OC Livescan System Design Specification (Deliverable OC-17). The Contractor shall conduct a System Design Review (SDR) and present their design for OCCL approval. The SDR shall be a comprehensive and in-depth review of the design as documented in the OC Livescan System Design Specification and the Bill of Materials. 6.1. Requirements Review (Completed) The Contractor shall review the OC Livescan requirements and conduct the analyses and modeling necessary to validate the requirements. The Contractor shall identify errors, ambiguities, conflicts, incompletes, and other defects in the requirements. The Contractor shall recommend changes to the requirements where those changes would correct defects or result in benefit to the OCCL (e.g., enhance the overall functionality, performance, or reliability of the OC ABI System, reduce life cycle costs, increase maintainability, shorten the schedule, or reduce program risk). The Contractor shall conduct the analyses necessary to develop the interface requirements between the OC Livescans and agency records/jail management systems. The Contractor shall document those requirements in an Interface Definitions Document (Deliverable OC-16). The Contractor shall conduct a System Requirements Review (SRR). At SRR, the Contractor shall present the results of the verification effort and the supporting data. The Contractor shall document recommended changes to the OC Livescan requirements and shall support these recommendations (e.g., with trade study results and cost benefit analyses). Upon successful completion of the SRR, the OC Program Manager will authorize the Contractor to proceed with system design. OCCL will incorporate any approved changes in a revision to the OC Livescan requirements. 6.2. Functional and Technical Requirements Contractor’s Livescan system shall meet the following requirements:

Appears in 3 contracts

Sources: Contract Ma 060 18010732, Contract Ma 060 18010732, Contract Ma 060 18010732