TASKS TO BE COMPLETED. The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: 1. DESIGN SURVEYS a. Obtain or collect data to create cross-sections and digital terrain models to supplement the aerial mapping and voids caused by tree cover. b. Establish existing roadway centerline, graphically only. c. Locate and tie existing visible utilities. d. Locate and tie topographical features and existing improvements within the project limits and the additional 3000’ on either end of the project. e. Locate and tie all existing ROW markers, cross drainage structures, roadway centerline (every 500’), bridge structures, etc. from 3000’ prior to the Beginning of the project to 3000’ outside/past the End of the project limits and submit data to the state for review. If no ROW markers or drainage/bridge structures exist within 3000’ outside the limits of the project, the Engineer shall contact the State for guidance. The above requirements also apply to all State roads/highways a distance of 3000’ each way from the intersection of the project centerline on the following roadways ▇▇ ▇▇▇, ▇▇ ▇▇▇,▇▇ 726, FM 1844 and FM 2275.. f. Provide details of existing drainage features, (e.g., culverts, manholes, etc.) including structure size and type, railing, erosion control measures, upstream and downstream flowlines of 27 cross culverts and ± 140 driveway culverts. g. Include digital photographs of each structure including upstream and downstream ends of the structure, and upstream and downstream images just off the existing ROW. h. Locate wetlands identified by the Environmental Task Leader i. Locate and tie existing right-of-ways. j. Create a 3D model of the substructure from the terrestrial scan of the existing bridge at Quail Drive. k. Review right-of-way maps. Provided by the State. l. Establish 70 aerial mapping targets. m. Shall prepare the Right of Entry letters (▇▇▇ Letters sent under FC 130) for the collection of the cross culvert HEC-RAS channel sections, for the property owners along drainage channels only. n. Coordinate and locate bore holes with the Engineer up to 30 holes. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 o. Update existing control data and prepare survey control data sheets (11” X 17”), as directed by the State for inclusion into a construction plan set. p. Use the existing Virtual Reference System in the State’s Atlanta District to facilitate surveying provided sufficient cellular coverage is available. In the event cellular coverage is not available, datum shall be based on static observations meeting the specifications for State Level 3 control points. Note that most of the Atlanta District is located in the Verizon cellular network. q. Establish a minimum of four (4) GPS primary control points for each project. Preliminary locations are to be submitted to the State for review and approval before setting. Develop, submit for review, revise, seal and sign control point data sheets and plats. The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing. r. Establish a minimum of eighteen (18) additional GPS primary control points outside of final construction limits and verify six (6) existing GPS monuments for the project. The minimum/maximum distance outside of the project limits for the closest GPS primary control monument on each end of the project is 500’/1000’ respectively. Preliminary locations are to be submitted to the State for review and approval before setting Develop, submit for review, revise, seal and sign control point data sheets and plats. The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing. Digital levels shall run through all control points along the corridor. s. The Engineer shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website. t. Obtain or collect additional elevation data every 100’ at the centerline and 14’ either side of centerline throughout the limits of the project, including additional elevations at grade breaks, bridges and 50’ intervals along vertical curves. Provide additional elevations every 50’ including 400’ along the tangent at each end of the curves for all curves within these same limits. u. Obtain and collect additional information along FM 726 and FM 1844. Limits of survey will extend 1500’ east along FM 726 and FM 1844. Data collection will include same information required along US 271. • Overall view of the project and primary control monuments set for control of the project • Identification of the control points • Baseline or centerline • Graphic (Bar) Scale • North Arrow DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State • RPLS signature, seal, and date • The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: • Location for each control point, showing baseline or centerline alignment and North arrow. • Station and offset (with respect to the baseline or centerline alignments) of each identified control point. • Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). • Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). • Date of current adjustment of the datum. • Monumentation set for Control (Description, District name/number and Location ties). • Surface Adjustment Factor and unit of measurement. • Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). • Relevant metadata. • Graphic (Bar) Scale. • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. • RPLS signature, seal and date. • The State’s title block containing District Name, County, Highway, and CSJ. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. At that time the Engineer shall need to submit: 1. TxDOT GPS Control Point Data Sheets. (We have the Plats). 2. Copy of level loop through all primary and secondary control points. 3. Horizontal alignment reports for all existing survey centerlines within the project limits. 4. GPK file containing all field points tied, all chains, and calculated ROW breaks within the project limits. 5. Station offset report from the existing survey centerline chains to the found boundary/row monumentation, centerline of drainage structures, end of bridges, and intersecting State Highways/Farm Roads, etc. 6. Station offset report from the existing survey centerline chains to the centerline of road and edge of pavement. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 2. AERIAL MAPPING AND PHOTOGRAMMETRY a. The Engineer shall set approximately 70 panel points for the low altitude photogrammetry, and shall establish the horizontal and vertical coordinate geometry for each of the panel points. b. The Engineer shall provide low altitude aerial mapping services necessary to produce photogrammetric mapping and Digital Terrain Model (DTM). The aerial mapping shall extend 500’ each side of the centerline and extend 1000’ north of SH 300 and 1000’ south of the Uphsur/▇▇▇▇▇ County line. Surveys shall include color aerial photography, airborne GPS, analytical aerial triangulation, digital planimetric mapping (1”=50’ scale standard, 1’ contour interval), and color digital orthophotos (1”=50’ scale standard, 3” pixel resolution). Map data shall be delivered in both 2D and 3D MicroStation V8i format and the TIN will be delivered in Geopak format. The services to be provided are based on providing data and imagery that will meet or exceed ASPRS Class 1 Accuracy Standards. The contours will have an RMSE not to exceed 0.33’, spot elevations and DTM points will have an RMSE not to exceed 0.17’, and planimetric features will have an RMSE not to exceed 0.5’ horizontally. c. Acquire aerial LiDAR data using a full waveform laser scanner with an approximate acquisition density of 30 points per square meter. All aerial mapping work shall conform to the TxDOT Standards and Specifications of the National Map Accuracy Standards (NMAS) for a one (1.0) foot contour. Bare Earth LAS files will be provided to the State immediately after acquisition and processing.
Appears in 1 contract
Sources: Contract for Engineering Services
TASKS TO BE COMPLETED. The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline established by the Engineer’s Surveyor as per the as-builts and built plans, existing ROW maps, and field survey information of existing roadway features. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following:
1. DESIGN SURVEYS
a. Obtain or collect data to create cross-sections and digital terrain models utilizing conventional field survey to supplement the aerial mapping LiDAR and voids caused by tree cover.
b. Establish existing roadway centerline, graphically only.centerline DocuSign Envelope ID: D0894D65-6FF6-4E21-BE5E-BEEA53479086
c. Locate and tie existing visible utilities.
d. Locate and tie topographical features and existing improvements within the project limits and the additional 3000’ on either end of the projectimprovements.
e. Locate and tie all existing ROW markers, cross drainage structures, roadway centerline (every 500’)centerline, bridge structures, etc. from 3000’ 1000 feet prior to the Beginning beginning of the project to 3000’ 1000 feet outside/past the End end of the project limits and submit data to the state State for review. If no ROW markers or of drainage/bridge structures exist within 3000’ 1000 feet outside the limits of the project, the Engineer shall contact the State for guidance. The above requirements also apply to all State roads/highways a distance of 3000’ each way from the intersection of the project centerline on the following roadways ▇▇ ▇▇▇, ▇▇ ▇▇▇,▇▇ 726, FM 1844 and FM 2275...
f. Provide details of existing drainage features, (e.g., culverts, manholes, etc.) including structure size and type, railing, erosion control measures, upstream and downstream flowlines flowlines, and photo documentation of 27 cross culverts and ± 140 driveway culvertseach culvert end treatment.
g. Include digital photographs of each structure including upstream and downstream ends of the structure, and upstream and downstream images just off the existing ROW.
h. Locate Stake and survey wetlands identified by the Environmental Task Leader
i. Establish additional and verify existing control points Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State. Vertical control ties must be tied using differential leveling methods as described in the TxDOT Survey Manual.
j. Locate and tie existing right-of-ways.
j. Create a 3D model of the substructure from the terrestrial scan of the existing bridge at Quail Drive.
k. Review right-of-way maps. Provided by the State.
l. Establish 70 aerial mapping targets.
m. Shall prepare the Right of Entry letters (▇▇▇ Letters sent under FC 130) for the collection of the cross culvert HEC-RAS channel sections, for the property owners along drainage channels only.
n. Coordinate and locate bore holes with the Engineer up to 30 holes. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6before and after drilling operations as directed by the Engineer.
o. m. Perform hydrographic surveys as necessary on drainage ways, and as directed by the Engineer.
n. Update existing control data and prepare survey control data sheets (11” X 17”), as directed by the State for inclusion into a construction plan set.
p. o. Use the existing Virtual Reference System in the State’s Atlanta Paris District to facilitate surveying provided sufficient cellular coverage is available. In the event cellular coverage is not available, datum shall be based on static observations meeting the specifications for State Level 3 control points. Note that most of the Atlanta District is located in the Verizon cellular network.
q. Establish a minimum of four seventeen (417) GPS primary control points for each projectthis project at approximate one-mile intervals. Preliminary locations are to be submitted to the State for review and approval before setting. Develop, submit for review, revise, seal and sign control point data sheets and plats. DocuSign Envelope ID: D0894D65-6FF6-4E21-BE5E-BEEA53479086 The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing, requiring three site visits by the Engineer’s surveyor with the State to efficiently complete the locations. Prior to establishing these control points, Texas811 will be notified to line locate at the proposed monument location.
r. p. Establish a minimum of eighteen additional intervisible secondary project control points (18capped iron rods) additional based on the GPS primary control points. The Surveyor shall set each control point outside the work area near the ROW line in an effort to protect the control points outside of final construction limits from being disturbed during construction. The Surveyor shall obtain and verify six (6) existing GPS monuments provide to the State, the XYZ coordinate data for the projectcontrol points. The minimum/maximum distance outside Surveyor shall set these additional control points on both side of the project limits for the closest GPS primary control monument on each end of the project is 500’/1000’ respectively. Preliminary locations are to be submitted to the State for review highway at PC and approval before setting Develop, submit for review, revise, seal and sign control point data sheets and platsPT centerline points. The proposed location Surveyor shall ensure separation of control points do not exceed 1500 feet. Elevations for these additional GPS control points shall be coordinated adjusted with a differential level loop. Prior to establishing these control points, Texas811 will be notified to line locate at the State prior to establishing. Digital levels shall run through all control points along the corridorproposed monument location.
s. q. The Engineer shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website.
t. Obtain or collect additional elevation data every 100’ at the centerline and 14’ either side of centerline throughout the limits of the project, including additional elevations at grade breaks, bridges and 50’ intervals along vertical curves. Provide additional elevations every 50’ including 400’ along the tangent at each end of the curves for all curves within these same limits.
u. Obtain and collect additional information along FM 726 and FM 1844. Limits of survey will extend 1500’ east along FM 726 and FM 1844. Data collection will include same information required along US 271website. • Overall view of the project and primary control monuments set for control of the project project. • Identification of the control points points. • Baseline or centerline centerline. • Graphic (Bar) Scale Scale. • North Arrow DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State • RPLS signature, seal, and date date. • The State’s title block containing District Name, County, Highway, and CSJ CSJ. DocuSign Envelope ID: D0894D65-6FF6-4E21-BE5E-BEEA53479086 The following information shall be shown on all Horizontal and Vertical Control Sheets: • Location for each control point, showing baseline or centerline alignment and North arrow. • Station and offset (with respect to the baseline or centerline alignments) of each identified control point. • Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). • Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). • Date of current adjustment of the datum. • Monumentation set for Control (Description, District name/number and Location ties). • Surface Adjustment Factor and unit of measurement. • Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). • Relevant metadata. • Graphic (Bar) Scale. • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. • RPLS signature, seal and date. • The State’s title block containing District Name, County, Highway, and CSJ. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. At that time the Engineer shall need to submit:
1. TxDOT GPS Control Point Data Sheets. (We have the Plats).
2. Copy of level loop through all primary and secondary control points.
3. Horizontal alignment reports for all existing survey centerlines within the project limits.
4. GPK file containing all field points tied, all chains, and calculated ROW breaks within the project limits.
5. Station offset report from the existing survey centerline chains to the found boundary/row monumentation, centerline of drainage structures, end of bridges, and intersecting State Highways/Farm Roads, etc.
6. Station offset report from the existing survey centerline chains to the centerline of road and edge of pavement. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6
2. AERIAL MAPPING AND PHOTOGRAMMETRYLiDAR
a. The Engineer Engineer’s Surveyor shall set approximately 70 25 panel points for the low altitude photogrammetryLiDAR and imagery acquisition, and shall establish the horizontal and vertical coordinate geometry for each of the panel points.
b. The Engineer Engineer’s Surveyor shall provide low altitude aerial LiDAR mapping services necessary to produce photogrammetric mapping 2D Planimetric and Digital Terrain Model (DTM). The aerial LiDAR mapping shall extend 500’ each side of the centerline and extend 1000’ north east of SH 300 Loop 286 West of Paris and 1000’ south west of the Uphsur/▇▇▇▇▇ / ▇▇▇▇▇▇ County line. Surveys shall include color aerial photography, airborne GPS, analytical aerial triangulationdirect imagery georeferencing, digital planimetric mapping (1”=50’ scale standard, 1’ contour interval), and color DocuSign Envelope ID: D0894D65-6FF6-4E21-BE5E-BEEA53479086 digital orthophotos (1”=50’ scale standard, 3” pixel resolution). Map data shall be delivered in both 2D and 3D MicroStation V8i format and the TIN will be delivered in Geopak GEOPAK format. The services to be provided are based on providing data and imagery that will meet or exceed ASPRS Class 1 Accuracy Standards. The contours will have an RMSE not to exceed 0.33’, spot elevations and DTM points will have an RMSE not to exceed 0.17’, and planimetric features will have an RMSE not to exceed 0.5’ horizontally.
c. Acquire The Engineer’s Surveyor shall acquire aerial LiDAR data using a full waveform laser scanner with an approximate acquisition density of 30 points per square meter. All aerial mapping work shall conform to the TxDOT State Standards and Specifications of the National Map Accuracy Standards (NMAS) for a one (1.0) foot contour. Bare Earth LAS files will be provided to the State immediately after acquisition and processing.
Appears in 1 contract
Sources: Contract for Engineering Services
TASKS TO BE COMPLETED. The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following:
1. DESIGN SURVEYS
a. Obtain or collect data to create cross-sections and digital terrain models to supplement the aerial mapping and voids caused by tree cover.
b. Establish existing roadway centerline, graphically only.
c. Locate and tie existing visible utilities.
d. Locate and tie topographical features and existing improvements within the project limits and the additional 3000’ on either end of the projectimprovements.
e. Locate and tie all existing ROW markers, cross drainage structures, roadway centerline (every 500’)centerline, bridge structures, etc. from 3000’ 1000 feet prior to the Beginning beginning of the project to 3000’ 1000 feet outside/past the End DocuSign Envelope ID: 6DA01770-719C-4EFF-A344-425189FAC6FB end of the project limits and submit data to the state State for review. If no ROW markers or of drainage/bridge structures exist within 3000’ 1000 feet outside the limits of the project, the Engineer shall contact the State for guidance. The above requirements also apply to all State roads/highways a distance of 3000’ each way from the intersection of the project centerline on the following roadways ▇▇ ▇▇▇, ▇▇ ▇▇▇,▇▇ 726, FM 1844 and FM 2275...
f. Provide details of existing drainage features, (e.g., culverts, manholes, etc.) including structure size and type, railing, erosion control measures, upstream and downstream flowlines of 27 cross culverts and ± 140 driveway culvertsflowlines.
g. Include digital photographs of each structure including upstream and downstream ends of the structure, and upstream and downstream images just off the existing ROW.
h. Locate wetlands up to 20 identified by the Environmental Task Leader
i. Establish additional and verify existing control points Horizontal and Vertical control ties must be made and tabulated, to other control points in the vicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and the Federal Emergency Management Agency (FEMA), and any other local entities as directed by the State.
j. Locate and tie existing right-of-ways.
j. Create a 3D model of the substructure from the terrestrial scan of the existing bridge at Quail Drive.
k. Review right-of-way maps. Provided by the State.
l. Establish 70 aerial mapping targets.
m. Shall prepare the Right of Entry letters (▇▇▇ Letters sent under FC 130) for the collection of the cross culvert HEC-RAS channel sections, for the property owners along drainage channels only.
n. Coordinate and locate up to 70 bore holes with the Engineer up to 30 holes. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6Engineer
o. m. Update existing control data and prepare survey control data sheets (11” X 17”), as directed by the State for inclusion into a construction plan set.
p. n. Use the existing Virtual Reference System in the State’s Atlanta Paris District to facilitate surveying provided sufficient cellular coverage is available. In the event cellular coverage is not available, datum shall be based on static observations meeting the specifications for State Level 3 control points. Note that most of the Atlanta District is located in the Verizon cellular network.
q. Establish a minimum of four one (41) GPS primary control point at one (1) mile intervals throughout the entire project limits up to a total of 42 GPS primary control points that includes 7 GPS primary control points for each project. CSJ ▇▇▇▇-▇▇-▇▇▇, 16 GPS primary control points for CSJ 0045- 12-086, 2 GPS primary control points for CSJ ▇▇▇▇-▇▇-▇▇▇, and 17 GPS primary control points for CSJ ▇▇▇▇-▇▇-▇▇▇.. Preliminary locations are to be submitted to the State for review and approval before setting. Develop, submit for review, revise, seal and sign control point data sheets and plats. The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing.
r. o. Establish a minimum of eighteen additional intervisible secondary project control points (18capped iron rods) additional based on the GPS primary control points. The Surveyor shall set each control point outside the work area near the ROW line in an effort to protect the control points outside of final construction limits from being disturbed during construction. The Surveyor shall obtain and verify six (6) existing GPS monuments provide to the State, the XYZ coordinate data for the projectcontrol points. The minimum/maximum distance outside Surveyor shall set these additional control points on both side of the project limits for the closest GPS primary control monument on each end of the project is 500’/1000’ respectively. Preliminary locations are to be submitted to the State for review highway at PC and approval before setting Develop, submit for review, revise, seal and sign control point data sheets and platsPT centerline points. The proposed location Surveyor shall ensure separation of these additional GPS control points shall be coordinated with the State prior to establishing. Digital levels shall run through all control points along the corridordo not exceed 1500 feet.
s. p. The Engineer Engineer’s Surveyor shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer Engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey DocuSign Envelope ID: 6DA01770-719C-4EFF-A344-425189FAC6FB Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website.
t. Obtain or collect additional elevation data every 100’ at the centerline and 14’ either side of centerline throughout the limits of the project, including additional elevations at grade breaks, bridges and 50’ intervals along vertical curveswebsite. Provide additional elevations every 50’ including 400’ along the tangent at each end of the curves for all curves within these same limits.
u. Obtain and collect additional information along FM 726 and FM 1844. Limits of survey will extend 1500’ east along FM 726 and FM 1844. Data collection will include same information required along US 271. • Overall view of the project and primary control monuments set for control of the project • Identification of the control points • Baseline or centerline • Graphic (Bar) Scale • North Arrow DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State • RPLS signature, seal, and date • The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: • Location for each control point, showing baseline or centerline alignment and North arrow. • Station and offset (with respect to the baseline or centerline alignments) of each identified control point. • Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). • Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). • Date of current adjustment of the datum. • Monumentation set for Control (Description, District name/number and Location ties). • Surface Adjustment Factor and unit of measurement. • Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). • Relevant metadata. • Graphic (Bar) Scale. • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. • RPLS signature, seal and date. • DocuSign Envelope ID: 6DA01770-719C-4EFF-A344-425189FAC6FB The State’s title block containing District Name, County, Highway, and CSJ. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. At that time the Engineer shall need to submit:
1. TxDOT GPS Control Point Data Sheets. (We have the Plats).
2. Copy of level loop through all primary and secondary control points.
3. Horizontal alignment reports for all existing survey centerlines within the project limits.
4. GPK file containing all field points tied, all chains, and calculated ROW breaks within the project limits.
5. Station offset report from the existing survey centerline chains to the found boundary/row monumentation, centerline of drainage structures, end of bridges, and intersecting State Highways/Farm Roads, etc.
6. Station offset report from the existing survey centerline chains to the centerline of road and edge of pavement. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6
2. AERIAL MAPPING AND PHOTOGRAMMETRY
a. The Engineer Engineer’s Surveyor shall set approximately 70 up to a total of 141 panel points that includes 19 panel points for CSJ ▇▇▇▇-▇▇-▇▇▇, 45 panel points for CSJ ▇▇▇▇-▇▇-▇▇▇, 17 panel points for CSJ 0046-10- 003, and 60 panel points for CSJ ▇▇▇▇-▇▇-▇▇▇ for the low altitude photogrammetry, and shall establish the horizontal and vertical coordinate geometry for each of the panel points.
b. The Engineer Engineer’s Surveyor shall provide low altitude aerial mapping services necessary to produce photogrammetric mapping and Digital Terrain Model (DTM). The aerial mapping shall extend 500’ each side of the centerline and extend 1000’ north west of SH 300 West Division St in Blossom, TX, and 1000’ south east of the Uphsur/▇▇▇▇▇ Bowie County line. Surveys shall include color aerial photography, airborne GPS, analytical aerial triangulation, digital planimetric mapping (1”=50’ scale standard, 1’ contour interval), and color digital orthophotos (1”=50’ scale standard, 3” pixel resolution). Map data shall be delivered in both 2D and 3D MicroStation V8i format and the TIN will be delivered in Geopak format. The services to be provided are based on providing data and imagery that will meet or exceed ASPRS Class 1 Accuracy Standards. The contours will have an RMSE not to exceed 0.33’, spot elevations and DTM points will have an RMSE not to exceed 0.17’, and planimetric features will have an RMSE not to exceed 0.5’ horizontally.
c. Acquire The Engineer’s Surveyor shall acquire aerial LiDAR data using a full waveform laser scanner with an approximate acquisition density of 30 points per square meter. All aerial mapping work shall conform to the TxDOT State Standards and Specifications of the National Map Accuracy Standards (NMAS) for a one (1.0) foot contour. Bare Earth LAS files will be provided to the State immediately after acquisition and processing.
Appears in 1 contract
Sources: Contract for Engineering Services
TASKS TO BE COMPLETED. The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following:
1. DESIGN SURVEYS
a. Obtain or collect data to create cross-sections and digital terrain models to supplement the aerial mapping and voids caused by tree covermodels.
b. Establish existing roadway centerline, graphically only.
c. Locate and tie existing visible utilities.
d. c. Locate and tie topographical features and existing improvements within the project limits and the additional 3000’ on either end of the projectimprovements.
e. d. Locate and tie all existing ROW markers, cross drainage structures, roadway centerline (every 500’)centerline, bridge structures, etc. from 3000’ 1000 feet prior to the Beginning beginning of the project to 3000’ 1000 feet outside/past the End end of the project limits and submit data to the state State for review. If no ROW markers or of drainage/bridge structures exist within 3000’ 1000 feet outside the limits of the project, the Engineer shall contact the State for guidance. The above requirements also apply to all State roads/highways a distance of 3000’ each way from the intersection of the project centerline on the following roadways ▇▇ ▇▇▇, ▇▇ ▇▇▇,▇▇ 726, FM 1844 and FM 2275...
f. e. Provide details of existing drainage features, (e.g., culverts, manholes, etc.) including structure size and type, railing, erosion control measures, upstream and downstream flowlines of 27 cross culverts and ± 140 driveway culverts).
f. Locate wetlands. DocuSign Envelope ID: D78C9312-D95C-4FD3-B00A-7CFCC10A2DB4
g. Include digital photographs of each structure including upstream Establish additional and downstream ends of verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the structurevicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and upstream the Federal Emergency Management Agency (FEMA), and downstream images just off any other local entities as directed by the existing ROWState.
h. Locate wetlands identified by the Environmental Task Leader
i. Locate and tie existing right-of-ways.
i. Locate and tie existing access denial lines (ADL)
j. Create a 3D model of the substructure from the terrestrial scan of the existing bridge at Quail Drive.
k. Review right-of-way maps. Provided by the State.
k. Locate boreholes.
l. Establish 70 aerial mapping targetsPerform hydrographic surveys.
m. Shall prepare the Right of Entry letters (▇▇▇ Letters sent under FC 130) for the collection of the cross culvert HEC-RAS channel sections, for the property owners along drainage channels only.
n. Coordinate and locate bore holes with the Engineer up to 30 holes. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6
o. Update existing control data and prepare survey control data sheets (11” X 17”), as directed by the State for inclusion into a construction plan set.
p. n. Use the existing Virtual Reference System in the State’s Atlanta Corpus Christi District to facilitate surveying provided sufficient cellular coverage is available. In the event cellular coverage is not available, datum shall be based on static observations meeting the specifications for State Level 3 control points. Note that most of the Atlanta District is located in the Verizon cellular network.
q. o. Establish a minimum of four (4) additional intervisible secondary project control points based on the GPS primary control points. The Surveyor shall set each control point outside the work area near the ROW line in an effort to protect the control points for each projectfrom being disturbed during construction. Preliminary locations are to be submitted The Surveyor shall obtain and provide to the State State, the XYZ coordinate data for review and approval before setting. Develop, submit for review, revise, seal and sign the control point data sheets and platspoints. The proposed location of Surveyor shall set these additional GPS control points on both side of the highway at PC and PT centerline points. The Surveyor shall ensure separation of control points do not exceed 1500 feet. Elevations for these points shall be coordinated adjusted with the State prior to establishinga differential level loop.
r. Establish a minimum of eighteen p. Obtain or collect additional elevation data elevations every 100’ at the centerline (18crown point) additional GPS primary control points outside of final construction throughout the limits and verify six (6) existing GPS monuments for the project. The minimum/maximum distance outside of the project limits for including additional elevations at grade breaks, bridges and 50’ intervals along vertical curves. Provide additional elevations at 50 foot intervals along vertical curves. Provide additional elevations every 50 feet including 400 feet along the closest GPS primary control monument on tangent at each end of the project is 500’/1000’ respectively. Preliminary locations are to be submitted to the State for review and approval before setting Develop, submit for review, revise, seal and sign control point data sheets and plats. The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing. Digital levels shall run through all control points along the corridorcurves.
s. q. The Engineer Engineer’s Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website.
t. Obtain or collect additional elevation data every 100’ at website. The following information shall be shown on the centerline and 14’ either side of centerline throughout the limits of the project, including additional elevations at grade breaks, bridges and 50’ intervals along vertical curves. Provide additional elevations every 50’ including 400’ along the tangent at each end of the curves for all curves within these same limits.
u. Obtain and collect additional information along FM 726 and FM 1844. Limits of survey will extend 1500’ east along FM 726 and FM 1844. Data collection will include same information required along US 271. Survey Control Index Sheet: • Overall view of the project and primary control monuments set for control of the project • Identification of the control points • Baseline or centerline • Graphic (Bar) Scale • North Arrow DocuSign Envelope ID: F43CDC74D78C9312-DA27D95C-4FD3-4A02-AC2A-90D8CB2811D6 B00A-7CFCC10A2DB4 • North Arrow • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State • RPLS signature, seal, and date • The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: • Location for each control point, showing baseline or centerline alignment and North arrow. • Station and offset (with respect to the baseline or centerline alignments) of each identified control point. • Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). • Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). • Date of current adjustment of the datum. • Monumentation set for Control (Description, District name/number and Location ties). • Surface Adjustment Factor and unit of measurement. • Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). • Relevant metadata. • Graphic (Bar) Scale. • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. • RPLS signature, seal and date. • The State’s title block containing District Name, County, Highway, and CSJ. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. At that time the Engineer shall need to submit:
1. TxDOT GPS Control Point Data Sheets. (We have the Plats).
2. Copy of level loop through all primary and secondary control points.
3. Horizontal alignment reports for all existing survey centerlines within the project limits.
4. GPK file containing all field points tied, all chains, and calculated ROW breaks within the project limits.
5. Station offset report from the existing survey centerline chains to the found boundary/row monumentation, centerline of drainage structures, end of bridges, and intersecting State Highways/Farm Roads, etc.
6. Station offset report from the existing survey centerline chains to the centerline of road and edge of pavement. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6
2. AERIAL MAPPING AND PHOTOGRAMMETRY
a. The Engineer shall set approximately 70 panel points for the low altitude photogrammetry, and shall establish the horizontal and vertical coordinate geometry for each of the panel points.
b. The Engineer shall provide low altitude aerial mapping services necessary to produce photogrammetric mapping and Digital Terrain Model (DTM). The aerial mapping shall extend 500’ each side of the centerline and extend 1000’ north of SH 300 and 1000’ south of the Uphsur/▇▇▇▇▇ County line. Surveys shall include color aerial photography, airborne GPS, analytical aerial triangulation, digital planimetric mapping (1”=50’ scale standard, 1’ contour interval), and color digital orthophotos (1”=50’ scale standard, 3” pixel resolution). Map data shall be delivered in both 2D and 3D MicroStation V8i format and the TIN will be delivered in Geopak format. The services to be provided are based on providing data and imagery that will meet or exceed ASPRS Class 1 Accuracy Standards. The contours will have an RMSE not to exceed 0.33’, spot elevations and DTM points will have an RMSE not to exceed 0.17’, and planimetric features will have an RMSE not to exceed 0.5’ horizontally.
c. Acquire aerial LiDAR data using a full waveform laser scanner with an approximate acquisition density of 30 points per square meter. All aerial mapping work shall conform to the TxDOT Standards and Specifications of the National Map Accuracy Standards (NMAS) for a one (1.0) foot contour. Bare Earth LAS files will be provided to the State immediately after acquisition and processing.
Appears in 1 contract
Sources: Contract for Engineering Services
TASKS TO BE COMPLETED. a. Design Surveys The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following: The State will request design surveys on an as needed basis. After the survey is complete and prior to design work commencing, the State will need to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. The Engineer’s Surveyor shall perform tasks including, but not limited to the following:
1. DESIGN SURVEYS
a. i. Obtain or collect data to create cross-sections and digital terrain models to supplement the aerial mapping and voids caused by tree covermodels.
b. Establish ii. Locate existing roadway centerline, graphically only.
c. Locate and tie existing visible utilities.
d. iii. Locate and tie topographical features and existing improvements within the project limits and the additional 3000’ on either end of the projectimprovements.
e. Locate and tie all iv. Provide details of existing ROW markers, cross drainage structures, roadway centerline (every 500’), bridge structures, etc. from 3000’ prior to the Beginning of the project to 3000’ outside/past the End of the project limits and submit data to the state for review. If no ROW markers or drainage/bridge structures exist within 3000’ outside the limits of the project, the Engineer shall contact the State for guidance. The above requirements also apply to all State roads/highways a distance of 3000’ each way from the intersection of the project centerline on the following roadways ▇▇ ▇▇▇, ▇▇ ▇▇▇,▇▇ 726, FM 1844 and FM 2275...
f. v. Provide details of existing drainage features, features (e.g., culverts, manholes, etc.) including structure size and type, railing, erosion control measures, upstream and downstream flowlines of 27 cross culverts and ± 140 driveway culverts).
g. Include digital photographs of each structure including upstream vi. Locate wetlands.
vii. Establish additional and downstream ends of verify existing control points. Horizontal and Vertical control ties must be made and tabulated, to other control points in the structurevicinity, which were established by other sources such as, the National Geodetic Survey (NGS), and upstream the Federal Emergency Management Agency (FEMA), and downstream images just off the existing ROW.
h. Locate wetlands identified any other local entities as directed by the Environmental Task LeaderState. DocuSign Envelope ID: 268EB37E-8EC6-41D6-B053-8569192F499C
i. viii. Locate and tie existing right-of-ways.
j. Create a 3D model of the substructure from the terrestrial scan of the existing bridge at Quail Drive.
k. ix. Review right-of-way maps. Provided by the State.
l. Establish 70 aerial mapping targetsx. Locate boreholes.
m. Shall prepare the Right of Entry letters (▇▇▇ Letters sent under FC 130) for the collection of the cross culvert HEC-RAS channel sections, for the property owners along drainage channels onlyxi. Perform hydrographic surveys.
n. Coordinate and locate bore holes with the Engineer up to 30 holesxii. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6
o. Update existing control data and prepare survey control data sheets (11” X 17”)sheets, as directed by the State for inclusion into a construction plan set.
p. Use the existing Virtual Reference System in the State’s Atlanta District to facilitate surveying provided sufficient cellular coverage is available. In the event cellular coverage is not available, datum shall be based on static observations meeting the specifications for State Level 3 control points. Note that most of the Atlanta District is located in the Verizon cellular network.
q. Establish a minimum of four (4) GPS primary control points for each project. Preliminary locations are to be submitted to the State for review and approval before setting. Develop, submit for review, revise, seal and sign control point data sheets and plats. The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing.
r. Establish a minimum of eighteen (18) additional GPS primary control points outside of final construction limits and verify six (6) existing GPS monuments for the project. The minimum/maximum distance outside of the project limits for the closest GPS primary control monument on each end of the project is 500’/1000’ respectively. Preliminary locations are to be submitted to the State for review and approval before setting Develop, submit for review, revise, seal and sign control point data sheets and plats. The proposed location of these additional GPS control points shall be coordinated with the State prior to establishing. Digital levels shall run through all control points along the corridor.
s. The Engineer Surveyors shall also prepare a Survey Control Index Sheet and a Horizontal and Vertical Control Sheet(s), signed, sealed and dated by the professional engineer in direct responsible charge of the surveying and the responsible RPLS for insertion into the plan set. The Survey Control Index Sheet shows an overall view of the project control and the relationship or primary monumentation and control used in the preparation of the project; whereas, the Horizontal and Vertical Control sheet(s) identifies the primary survey control and the survey control monumentation used in the preparation of the project. Both the Survey Control Index Sheet and the Horizontal and Vertical Control Sheet(s) must be used in conjunction with each other as a set. The State’s forms for these sheets can be downloaded from the State’s website.
t. Obtain or collect additional elevation data every 100’ at website. The following information shall be shown on the centerline and 14’ either side of centerline throughout the limits of the project, including additional elevations at grade breaks, bridges and 50’ intervals along vertical curves. Provide additional elevations every 50’ including 400’ along the tangent at each end of the curves for all curves within these same limits.
u. Obtain and collect additional information along FM 726 and FM 1844. Limits of survey will extend 1500’ east along FM 726 and FM 1844. Data collection will include same information required along US 271. Survey Control Index Sheet: • Overall view of the project and primary control monuments set for control of the project • Identification of the control points • Baseline or centerline • Graphic (Bar) Scale • North Arrow DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6 • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State • RPLS signature, seal, and date • The State’s title block containing District Name, County, Highway, and CSJ The following information shall be shown on all Horizontal and Vertical Control Sheets: • Location for each control point, showing baseline or centerline alignment and North arrow. • Station and offset (with respect to the baseline or centerline alignments) of each identified control point. • Basis of Datum for horizontal control (base control monument/benchmark name, number, datum). • Basis of Datum for the vertical control (base control monument, benchmark name, number, datum). • Date of current adjustment of the datum. • Monumentation set for Control (Description, District name/number and Location ties). • Surface Adjustment Factor and unit of measurement. DocuSign Envelope ID: 268EB37E-8EC6-41D6-B053-8569192F499C • Coordinates (State Plan Coordinates [SPC] Zone and surface or grid). • Relevant metadata. • Graphic (Bar) Scale. • Placement of note “The survey control information has been accepted and incorporated into this PS&E” which shall be signed, sealed and dated by a Texas Professional Engineer employed by the State. • RPLS signature, seal and date. • The State’s title block containing District Name, County, Highway, and CSJ. After the survey is complete and prior to design work commencing, the .
b. Construction Surveys The State will need request construction surveys on an as needed basis. The Surveyor shall perform tasks including, but not limited to approve the topographic survey and the geometry of the existing centerline as per the as-builts and existing ROW maps. At that time the Engineer shall need to submitfollowing:
1i. Stake existing or proposed right-of-ways.
ii. TxDOT GPS Control Point Data SheetsStake existing or proposed baseline/centerline.
iii. Stake proposed bridge structures.
iv. Stake proposed drainage structures (We have the Platse.g., manholes, culverts, etc.).
2v. Set grade stakes.
vi. Copy of level loop through all primary Recover and secondary check existing control points.
3vii. Horizontal alignment reports for all existing survey centerlines within the project limits.
4. GPK file containing all field points tied, all chains, and calculated ROW breaks within the project limits.
5. Station offset report from the existing survey centerline chains to the found boundary/row monumentation, centerline of drainage structures, end of bridges, and intersecting State Highways/Farm Roads, etc.
6. Station offset report from the existing survey centerline chains to the centerline of road and edge of pavement. DocuSign Envelope ID: F43CDC74-DA27-4A02-AC2A-90D8CB2811D6
2. AERIAL MAPPING AND PHOTOGRAMMETRY
a. The Engineer shall set approximately 70 panel points for the low altitude photogrammetry, and shall establish the horizontal and vertical coordinate geometry for each of the panel Establish additional control points.
b. The Engineer shall provide low altitude aerial mapping services necessary to produce photogrammetric mapping and Digital Terrain Model (DTM)viii. The aerial mapping shall extend 500’ each side of the centerline and extend 1000’ north of SH 300 and 1000’ south of the Uphsur/▇▇▇▇▇ County line. Surveys shall include color aerial photography, airborne GPS, analytical aerial triangulation, digital planimetric mapping (1”=50’ scale standard, 1’ contour interval), and color digital orthophotos (1”=50’ scale standard, 3” pixel resolution). Map data shall be delivered in both 2D and 3D MicroStation V8i format and the TIN will be delivered in Geopak format. The services to be provided are based on providing data and imagery that will meet or exceed ASPRS Class 1 Accuracy Standards. The contours will have an RMSE not to exceed 0.33’, spot Check elevations and DTM points will have an RMSE not to exceed 0.17’, and planimetric features will have an RMSE not to exceed 0.5’ horizontallylocations of structures.
c. Acquire aerial LiDAR data using a full waveform laser scanner ix. Determine and resolve conflicts associated with an approximate acquisition density of 30 points per square meter. All aerial mapping work shall conform to the TxDOT Standards and Specifications of the National Map Accuracy Standards (NMAS) for a one (1.0) foot contour. Bare Earth LAS files will be provided to the State immediately after acquisition and processingsurvey data.
Appears in 1 contract
Sources: Contract for Surveying Services