TDPs Clause Samples

TDPs. The Employer agrees that designation of a position as a TDP will be in accordance with applicable law and regulation. 1. An employee occupying a TDP will receive written notice or notation on their Position Description that his or her position has been determined to meet the criteria and justification for random drug testing at least thirty (30) days before the individual is subject to unannounced random testing. 2. Any bargaining unit employees selected for random testing will be selected on the basis of neutral criteria.
TDPs. For each TDP, upon its execution by both Parties, such TDP will be incorporated herein by reference and be deemed attached hereto as part of Exhibit A. As of the Effective Date, there are eight (8) TDPs substantially agreed upon by the Parties (through the [Redacted – Commercially Sensitive Information] JSC meeting) and such TDPs will be attached hereto as Exhibit A-1 through Exhibit A-8 respectively within thirty (30) days after the Effective Date. Each TDP for a Program will (i) set forth the details of the applicable Program mutually agreed by the Parties, including, but not limited to: (A) identification of the specific Target Cannabinoid to which the TDP applies; (B) the technical work plan, including the tasks to be performed, the timeline and duration of such tasks, and the Party responsible for such tasks; (C) the deliverables and Milestones under such TDP; (D) whether a portion of the Technical Services would be provided by a Ginkgo Subcontractor and, if so, the identity of the Subcontractor and whether that portion of the Technical Services will be performed at such other Subcontractor’s facility (for clarity, Ginkgo (and not Cronos) will subcontract and interact with a Third Party Subcontractor in connection with its performance of any portion of the Technical Services for a specific TDP); and (ii) be executed by each of Ginkgo and Cronos.
TDPs 

Related to TDPs

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central ▇▇▇▇▇▇ Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Interconnection Customer Authority Consistent with Good Utility Practice, this LGIA, and the CAISO Tariff, the Interconnection Customer may take actions or inactions with regard to the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities during an Emergency Condition in order to (i) preserve public health and safety, (ii) preserve the reliability of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities,

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.