Technical Reports. (i) The Clearwater Project is the only material property of Eastmain for the purposes of NI 43-101; (ii) The Eastmain Technical Report complied in all material respects with the requirements of NI 43-101 at the time of filing thereof and reasonably presented the quantity of mineral resources attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain does not have knowledge of a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since the date such information was provided; (iii) Eastmain has made available to the authors of the Eastmain Technical Report, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relate, and none of such information contained any misrepresentation at the time such information was so provided; (iv) All of the material assumptions underlying the resource estimates in the Eastmain Technical Report are reasonable and appropriate; (v) The estimates of mineral resources as described in the Eastmain Disclosure Record comply in all material respects with NI 43-101; (vi) The information set forth in the Eastmain Disclosure Record relating to mineral resources required to be disclosed therein pursuant to NI 43-101 has been prepared by Eastmain and its consultants in accordance with methods generally applied in the mining industry and conforms to the requirements of NI 43-101 and Securities Laws; and (vii) Eastmain is in compliance in all material respects with the provisions of NI 43-101, has filed all technical reports required thereby, and there has been no change of which Eastmain is or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report or that would require the filing of a new technical report under NI 43-101;
Appears in 1 contract
Technical Reports. The information contained in, related to or derived from the TRS is based on or derived from sources that the Company reasonably believes to be reliable and accurate in all material respects and represent its good faith estimate that is made on the basis of data derived from such sources, and the Company has obtained the written consent to the use of such data from such sources to the extent required, except as disclosed in the public record. The Company is in compliance, in all material respects, with the provisions of subpart 1300 of Regulation S-K promulgated by the Commission (i“S-K 1300”) to the extent applicable to the Company, and has filed all technical reports required to be filed in respect of the Stibnite Gold Project required thereby. The Clearwater Project Company is in compliance with the only material property provisions of Eastmain National Instrument 43-101 - Standards of Disclosure for the purposes of Mineral Projects (“NI 43-101;
(ii”) The Eastmain Technical Report complied and has filed all technical reports in respect of the Stibnite Gold Project required thereby, which technical reports remain current as at the date hereof and comply in all material respects with the requirements of NI 43-101 at and there is no new material scientific or technical information concerning the time of filing Stibnite Gold Project that would require a new technical report in respect thereof and reasonably presented the quantity of mineral resources attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain does be issued under NI 43-101 (including, but not have knowledge of a material adverse change limited to, in any production, cost, price, reserves, resources or other relevant information provided since the date such information was provided;
(iii) Eastmain has made available to the authors respect of the Eastmain FS Technical Report, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relate, and none of such information contained any misrepresentation at the time such information was so provided;
(iv) All of the material assumptions underlying the resource estimates in the Eastmain Technical Report are reasonable and appropriate;
(v) ). The estimates of the mineral resources and mineral reserves of the Stibnite Gold Project as described disclosed by the Company and as provided for in the Eastmain Disclosure Record comply FS Technical Report have been prepared in all material respects accordance with Canadian disclosure standards set forth in NI 43-101;
(vi) The information set forth in , and the Eastmain Disclosure Record relating to method of estimating the mineral resources required to be disclosed therein pursuant to NI 43-101 and mineral reserves has been prepared verified by Eastmain and its consultants in accordance with methods generally applied in mining experts who are “qualified persons” (within the mining industry and conforms to the requirements of NI 43-101 and Securities Laws; and
(vii) Eastmain is in compliance in all material respects with the provisions meaning of NI 43-101) and the information upon which the estimates of mineral resources and mineral reserves were based, has filed was, at the time of delivery thereof, complete and accurate in all technical reports required thereby, material respects and there has have been no change material changes to such information since the date of which Eastmain is delivery or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report or that would require the filing of a new technical report under NI 43-101preparation thereof;
Appears in 1 contract
Technical Reports. (i) The Clearwater La Arena Project is and the Shahuindo Project are the only material property properties of Eastmain Rio Alto for the purposes of NI 43-101;
(ii) The Eastmain technical report prepared for Sulliden Gold Corporation, Ltd. by ▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇ & Associates and Mine Development Associates entitled “Technical Report on the Shahuindo Heap ▇▇▇▇▇ Project, Cajabamba, Peru” dated November 9, 2012, and the technical report prepared for Rio Alto by Mining Plus Peru S.A.C. entitled “La Arena Project, Peru Technical Report (NI 43-101)” dated effective December 31, 2013 (the “Technical Reports”) complied in all material respects with the requirements of NI 43-101 at the respective time of filing thereof and reasonably presented the quantity of mineral reserves and mineral resources attributable to the properties evaluated therein as at the date respective dates stated therein based upon information available at the time the report was respective reports were prepared. Eastmain Except as disclosed in the news release dated February 5, 2015, Rio Alto does not have knowledge of a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since the date such information was provided;
(iii) Eastmain Rio Alto has made available to the authors of the Eastmain Technical ReportReports, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relaterequested by them, and none of such information contained any misrepresentation at the time such information was so provided;
(iv) All of the material assumptions underlying the resource estimates in the Eastmain Technical Report Reports are reasonable and appropriate;
(v) The estimates of mineral reserves and mineral resources as described in the Eastmain Rio Alto Disclosure Record comply in all material respects with NI 43-101;; and
(vi) The information set forth in the Eastmain Disclosure Record relating to mineral resources required to be disclosed therein pursuant to NI 43-101 has been prepared by Eastmain and its consultants in accordance with methods generally applied in the mining industry and conforms to the requirements of NI 43-101 and Securities Laws; and
(vii) Eastmain Rio Alto is in compliance in all material respects with the provisions of NI 43-43- 101, has filed all technical reports required thereby, and there has been no change of which Eastmain Rio Alto is or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report Reports or that would require the filing of a new technical report under NI 43-101;.
Appears in 1 contract
Technical Reports. The information contained in, related to or derived from the TRS is based on or derived from sources that the Company reasonably believes to be reliable and accurate in all material respects and represent its good faith estimate that is made on the basis of data derived from such sources, and the Company has obtained the written consent to the use of such data from such sources to the extent required, except as disclosed in the public record. The Company is in compliance, in all material respects, with the provisions of subpart 1300 of Regulation S-K promulgated by the Commission (i“S-K 1300”) to the extent applicable to the Company, and has filed all technical reports required to be filed in respect of the Stibnite Gold Project required thereby. The Clearwater Project Company is in compliance with the only material property provisions of Eastmain National Instrument 43-101 - Standards of Disclosure for the purposes of Mineral Projects (“NI 43-101;
(ii”) and has filed all technical reports in respect of the Stibnite Gold Project required thereby. The Eastmain TRS and FS Technical Report complied remain current as at the date hereof and comply in all material respects with the requirements of NI 43S-101 at the time of filing thereof K 1300 and reasonably presented the quantity of mineral resources attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain does not have knowledge of a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since the date such information was provided;
(iii) Eastmain has made available to the authors of the Eastmain Technical Report, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relate, and none of such information contained any misrepresentation at the time such information was so provided;
(iv) All of the material assumptions underlying the resource estimates in the Eastmain Technical Report are reasonable and appropriate;
(v) The estimates of mineral resources as described in the Eastmain Disclosure Record comply in all material respects with NI 43-101;
, respectively, and there is no new material scientific or technical information concerning the Stibnite Gold Project that would require a new technical report in respect thereof to be issued under S-K 1300 or NI 43--101 (vi) including, but not limited to, in respect of TRS and the FS Technical Report). The information estimates of the mineral resources and mineral reserves of the Stibnite Gold Project as disclosed by the Company and as provided for in the TRS and the FS Technical Report have been prepared in accordance with the standards set in S-K 1300 or the Canadian disclosure standards set forth in the Eastmain Disclosure Record relating to mineral resources required to be disclosed therein pursuant to NI 43-101 101, and the method of estimating the mineral resources and mineral reserves has been prepared verified by Eastmain and its consultants in accordance with methods generally applied in mining experts who are “qualified persons” (within the mining industry and conforms to the requirements meaning of NI 43-101 and Securities Laws; and
(viiS-K 1300) Eastmain is in compliance and the information upon which the estimates of mineral resources and mineral reserves were based, was, at the time of delivery thereof, complete and accurate in all material respects with the provisions of NI 43-101, has filed all technical reports required thereby, and there has have been no change material changes to such information since the date of which Eastmain is delivery or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report or that would require the filing of a new technical report under NI 43-101preparation thereof;
Appears in 1 contract
Technical Reports. (i) The Clearwater La Arena Project is and the Shahuindo Project are the only material property properties of Eastmain Rio Alto for the purposes of NI 43-101;
(ii) The Eastmain technical report prepared for Sulliden Gold Corporation, Ltd. by ▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇ & Associates and Mine Development Associates entitled “Technical Report on the Shahuindo Heap ▇▇▇▇▇ Project, Cajabamba, Peru” dated November 9, 2012, and the technical report prepared for Rio Alto by Mining Plus Peru S.A.C. entitled “La Arena Project, Peru Technical Report (NI 43-101)” dated effective December 31, 2013 (the “Technical Reports”) complied in all material respects with the requirements of NI 43-101 at the respective time of filing thereof and reasonably presented the quantity of mineral reserves and mineral resources attributable to the properties evaluated therein as at the date respective dates stated therein based upon information available at the time the report was respective reports were prepared. Eastmain Except as disclosed in the news release dated February 5, 2015, Rio Alto does not have knowledge of a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since the date such information was provided;
(iii) Eastmain Rio Alto has made available to the authors of the Eastmain Technical ReportReports, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relaterequested by them, and none of such information contained any misrepresentation at the time such information was so provided;
(iv) All of the material assumptions underlying the resource estimates in the Eastmain Technical Report Reports are reasonable and appropriate;
(v) The estimates of mineral reserves and mineral resources as described in the Eastmain Rio Alto Disclosure Record comply in all material respects with NI 43-101;; and
(vi) The information set forth in the Eastmain Disclosure Record relating to mineral resources required to be disclosed therein pursuant to NI 43-101 has been prepared by Eastmain and its consultants in accordance with methods generally applied in the mining industry and conforms to the requirements of NI 43-101 and Securities Laws; and
(vii) Eastmain Rio Alto is in compliance in all material respects with the provisions of NI 43-101, has filed all technical reports required thereby, and there has been no change of which Eastmain Rio Alto is or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report Reports or that would require the filing of a new technical report under NI 43-101;.
Appears in 1 contract
Technical Reports. (ia) The Clearwater Project is Company Properties, together, constitutes the only material property projects of Eastmain the Company for the purposes of NI 43-101;.
(iib) The Eastmain Technical Report Reports complied in all material respects with the requirements of NI 43-101 at the time of filing thereof and reasonably presented the quantity of mineral resources and mineral reserves attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain .
(c) The Company made available to the authors of the Technical Reports, prior to the issuance thereof, for the purpose of preparing such report, all information requested by them, and none of such information contained any misrepresentation at the time such information was so provided.
(d) The Company does not have knowledge Knowledge of any material change in the facts and assumptions underlying the estimates in the Technical Reports, as updated through the Company Public Disclosure Record, that would reasonably be expected to result in a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since in the date such information was provided;Technical Reports as updated through the Company Public Disclosure Record.
(iii) Eastmain has made available to the authors of the Eastmain Technical Report, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relate, and none of such information contained any misrepresentation at the time such information was so provided;
(ive) All of the material assumptions underlying the mineral resource and mineral reserve estimates in the Eastmain Technical Report Company Public Disclosure Record are reasonable and appropriate;.
(vf) The estimates of mineral resources and mineral reserves as described in the Eastmain Company Public Disclosure Record comply in all material respects with NI 43-101;.
(vig) The information set forth in the Eastmain Company Public Disclosure Record relating to mineral resources and mineral reserves required to be disclosed therein pursuant to NI 43-101 has been prepared by Eastmain the Company and its consultants in accordance with methods generally applied in the mining industry and conforms to the requirements of NI 43-101 and and, in all material respects, to applicable Securities Laws; and.
(viih) Eastmain The Company is in compliance in all material respects with the provisions of NI 43-101, 101 and has filed all technical reports required thereby, and there .
(i) There has been no material change of which Eastmain the Company is or should be aware that would materially disaffirm or materially change any aspect of the Eastmain Technical Report or that would require the filing of a new technical report under NI 43-101;.
Appears in 1 contract
Technical Reports. (i) The Clearwater information contained in, related to or derived from the TRS, as supplemented by the updated financial information in respect of the Stibnite Gold Project is included as Exhibit 99.1 of the only material property of Eastmain Company’s Annual Report on Form 10-K for the purposes year ended December 31, 2024, and the related disclosures contained in Item 2 thereof (the “Financial Update”), is based on or derived from sources that the Company reasonably believes to be reliable and accurate in all material respects and represent its good faith estimate that is made on the basis of data derived from such sources, and the Company has obtained the written consent to the use of such data from such sources to the extent required, except as disclosed in the public record. The Company is in compliance, in all material respects, with the provisions of subpart 1300 of Regulation S-K promulgated by the Commission (“S-K 1300”) to the extent applicable to the Company, and has filed all technical reports required to be filed in respect of the Stibnite Gold Project required thereby. The Company is in compliance with the provisions of National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101;
(ii”) and has filed all technical reports in respect of the Stibnite Gold Project required thereby. The Eastmain TRS and FS Technical Report complied Report, as supplemented by the Financial Update, remain current as at the date hereof and comply in all material respects with the requirements of NI 43S-101 at the time of filing thereof K 1300 and reasonably presented the quantity of mineral resources attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain does not have knowledge of a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since the date such information was provided;
(iii) Eastmain has made available to the authors of the Eastmain Technical Report, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relate, and none of such information contained any misrepresentation at the time such information was so provided;
(iv) All of the material assumptions underlying the resource estimates in the Eastmain Technical Report are reasonable and appropriate;
(v) The estimates of mineral resources as described in the Eastmain Disclosure Record comply in all material respects with NI 43-101;
, respectively, and there is no new material scientific or technical information concerning the Stibnite Gold Project that would require a new technical report in respect thereof to be issued under S-K 1300 or NI 43--101 (vi) including, but not limited to, in respect of TRS and the FS Technical Report). The information estimates of the mineral resources and mineral reserves of the Stibnite Gold Project as disclosed by the Company and as provided for in the TRS and the FS Technical Report have been prepared in accordance with the standards set in S-K 1300 or the Canadian disclosure standards set forth in the Eastmain Disclosure Record relating to mineral resources required to be disclosed therein pursuant to NI 43-101 101, and the method of estimating the mineral resources and mineral reserves has been prepared verified by Eastmain and its consultants in accordance with methods generally applied in mining experts who are “qualified persons” (within the mining industry and conforms to the requirements meaning of NI 43-101 and Securities Laws; and
(viiS-K 1300) Eastmain is in compliance and the information upon which the estimates of mineral resources and mineral reserves were based, was, at the time of delivery thereof, complete and accurate in all material respects with the provisions of NI 43-101, has filed all technical reports required thereby, and there has have been no change material changes to such information since the date of which Eastmain is delivery or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report or that would require the filing of a new technical report under NI 43-101preparation thereof;
Appears in 1 contract
Technical Reports. (i) The Clearwater Project is the only material property of Eastmain for the purposes of NI 43S-101;
(ii) The Eastmain K 1300 Technical Report Summaries dated May 12, 2023 titled “Technical Report Summary on the ▇▇▇▇ ▇▇▇▇ Project, Alaska, USA” and May 26, 2023 titled “Technical Report Summary on the Lucky Shot Project, Alaska, USA” filed by Contango as part of the Contango Public Disclosure Record ( the “Contango Technical Reports”) representing the most recent technical report summaries for Contango’s mineral properties at the time of filing thereof complied in all material respects with the requirements of NI 43-101 at the time of filing thereof SEC, was prepared in accordance with accepted mining, engineering, geoscience and reasonably presented the quantity of mineral resources attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain does other applicable industry standards and did not have knowledge contain any untrue statement of a material adverse change fact or omit to state a material fact required to be stated therein or necessary to make the statements therein, in any productionlight of the circumstances in which they were made, cost, price, reserves, resources or other relevant information provided since the date such information was provided;not misleading.
(iiiii) Eastmain has Contango or its corporate predecessors made available to the authors of the Eastmain Contango Technical ReportReports, prior to the issuance thereof, for the purpose of preparing such reportreports, all material information supporting such reports or relevant to the projects to which they relaterequested by them, and none of such information contained any misrepresentation at the time such information was so provided;
(iv) . All of the material assumptions underlying the resource estimates in the Eastmain Contango Technical Report Reports are reasonable and appropriate;.
(viii) The estimates of mineral resources as described in the Eastmain Disclosure Record comply in all material respects with NI 43-101;
(vi) The information set forth in the Eastmain Disclosure Record relating to mineral resources required to be disclosed therein pursuant to NI 43-101 has been prepared by Eastmain and its consultants in accordance with methods generally applied in the mining industry and conforms to the requirements of NI 43-101 and Securities Laws; and
(vii) Eastmain is in compliance in all material respects with the provisions of NI 43-101, has filed all technical reports required thereby, and there There has been no change, to Contango’s knowledge, in mineral resources analysis from the Contango Technical Reports that constitutes a material change of which Eastmain is or should be aware that would disaffirm or change any aspect of the Eastmain Technical Report in relation to Contango or that otherwise would require the filing of a new technical report under NI 43-101;reports.
Appears in 1 contract
Technical Reports. (ia) The Clearwater Project is Company Properties, together, constitutes the only material property projects of Eastmain the Company for the purposes of NI 43-101;.
(iib) The Eastmain Technical Report Reports complied in all material respects with the requirements of NI 43-101 at the time of filing thereof and reasonably presented the quantity of mineral resources and mineral reserves attributable to the properties evaluated therein as at the date stated therein based upon information available at the time the report was prepared. Eastmain .
(c) The Company made available to the authors of the Technical Reports, prior to the issuance thereof, for the purpose of preparing such report, all information requested by them, and none of such information contained any misrepresentation at the time such information was so provided.
(d) The Company does not have knowledge Knowledge of any material change in the facts and assumptions underlying the estimates in the Technical Reports, as updated through the Company Public Disclosure Record, that would reasonably be expected to result in a material adverse change in any production, cost, price, reserves, resources or other relevant information provided since in the date such information was provided;Technical Reports as updated through the Company Public Disclosure Record.
(iii) Eastmain has made available to the authors of the Eastmain Technical Report, prior to the issuance thereof, for the purpose of preparing such report, all material information supporting such reports or relevant to the projects to which they relate, and none of such information contained any misrepresentation at the time such information was so provided;
(ive) All of the material assumptions underlying the mineral resource and mineral reserve estimates in the Eastmain Technical Report Company Public Disclosure Record are reasonable and appropriate;.
(vf) The estimates of mineral resources and mineral reserves as described in the Eastmain Company Public Disclosure Record comply in all material respects with NI 43-43- 101;.
(vig) The information set forth in the Eastmain Company Public Disclosure Record relating to mineral resources and mineral reserves required to be disclosed therein pursuant to NI 43-101 has been prepared by Eastmain the Company and its consultants in accordance with methods generally applied in the mining industry and conforms to the requirements of NI 43-101 and and, in all material respects, to applicable Securities Laws; and.
(viih) Eastmain The Company is in compliance in all material respects with the provisions of NI 43-101, 101 and has filed all technical reports required thereby, and there .
(i) There has been no material change of which Eastmain the Company is or should be aware that would materially disaffirm or materially change any aspect of the Eastmain Technical Report or that would require the filing of a new technical report under NI 43-101;.
Appears in 1 contract