Technical Verification. The S-BSS Technical Specifications for each Functionality Release and all interfaces with the TerreStar Network Segments shall be verified at each satellite gateway operational facility [***]. This verification shall begin after site installation is complete and a TRR is conducted. Tests shall include [***] shall include verification of critical and relevant technical parameters. If the Contractor elects to perform portions of the Technical Verification Tests without using the in orbit satellite, those test shall be specifically mentioned in the test plan and a strong justification provided. [***] Test deficiencies shall be documented and resolution plans developed and implemented. [***] [***]
Appears in 1 contract
Technical Verification. The S-BSS Technical Specifications for each Functionality Release and all interfaces with the TerreStar Network Segments shall be verified at each satellite gateway operational facility [***]. This verification shall begin after site installation is complete and a TRR is conducted. Tests shall include [***] shall include verification of critical and relevant technical parameters. If the Contractor elects to perform portions of the Technical Verification Tests TVTs without using the in orbit satellite, those test shall be specifically mentioned in the test plan and a strong justification provided. [***] ]. Test deficiencies shall be documented and resolution plans developed and implemented. [***] [***]
Appears in 1 contract
Sources: Contract (Terrestar Corp)